广州市某大型商场空调系统设计


    




    广州市某型商场空调系统设计



    广州某型商场空调系统设计


    夏季岭南持续高温天气商场成数休闲聚会场商场营者说节约成时力满足降温需求成考虑事情设计针广州夏季高温雨仓储式量贩模式商场供冷面积情况全空气系统代风机盘加独立新风系统系统购物厅提供庞效制冷量风机盘加独立新风系统二层办公室供冷减少制冷量浪费节约电量减少二氧化碳排放节省劳动力较快发挥投资效益次设计通已知气象参数建筑设计概况合理进行冷负荷计算整系统空气系统进行设计相应空调箱进行选型风机盘选型冷水机组设备选择计算新风送风回风供水路径计算冷塔冷冻水泵选择计算气流组织确定风口风速计算等
    关键词:空调系统节约源区域供冷











    Air conditioning design of a large shopping market in Guangzhou

    Abstract
    In summershopping malls have become the main place for most people's leisure and gathering in the high temperature weather in the south of the Five Ridges For the operators of shopping malls how to use energy to meet people's demand for cooling while saving costs has become a matter to be considered This design aims at the high temperature and rainy conditions in Guangzhou in summer and the large cooling area of the shopping mall Combined with this shopping mall design it is a warehouse type mass selling mode The whole air system is used to replace the fan coil and independent fresh air system system to provide a huge and effective cooling capacity for the shopping hall and then the fan coil and independent fresh air system are combined to provide cooling for the first and second floor offices And reduce the waste of cooling capacity so as to save power consumption reduce carbon dioxide emissions and save labor can play a faster investment benefit In this design through the known meteorological parameters and the general situation of architectural design reasonably calculate the cooling load design the air system of the whole system select the corresponding air conditioning box and select the fan coil unit select and calculate the chiller equipment calculate the diameter of the main pipes for fresh air supply air return air and water supply select and calculate the cooling tower and chilled water pump The determination of air distribution and the calculation of wind speed at the tuyere
    Keywords air conditioning system energy conservation district cooling system








    目 录

    1 前言 1
    11 研究目意义 1
    12 商场空调系统现状 1
    2 工程概况 2
    21设计概况 2
    22室外气象参数 2
    23 室气象参数 3
    24 围护结构参数 5
    25 设计 6
    3负荷计算 7
    31冷负荷计算 7
    311冷负荷基概念 7
    312冷负荷计算方法 7
    313计算公式 9
    314围护结构基耗热量 15
    315冷风渗透耗热量 16
    316冷风侵入消耗热量 17
    32湿负荷计算 17
    33新风冷负荷计算 18
    4 空调系统方案确定 22
    41 空调系统分类较 22
    42 方案确定 22
    43 空气处理程计算 23
    5空调风系统 27
    51气流组织 28
    511气流组织基求 28
    512气流组织基形式 28
    52风尺寸确定水力计算 28
    53风口选型布置 43
    54风机选型计算 44
    55风机盘选型 45
    6 空调水系统 46
    61 空调水系统设计原 46
    62路设计 46
    63水系统设计 47
    64系统水力计算 49
    7 水系统设备选型 56
    71制冷机组选型 56
    72冷冻水泵选择 57
    73冷塔选型 60
    74膨胀水箱选择 60
    75补水泵选择 61
    76水系统附件选择 62
    8总结 65
    参考文献 66
    谢 辞 67
    附 录 68
    附录Ⅰ 68
    附录Ⅱ 外文翻译 70












    1 前言
    全空气系统空气水系统作常见空调系统广泛运建筑中单化运会存着弊病全空气系统选作商场数空调系统原便设备集中部署易理够进行面积供冷噪声问题规模办公室适空气水系统说布置灵活占空间必设置回风道身存着风机余压进行规模供冷结合空气水系统会较完美解决问题环保济性方面考虑两种系统结合布置更加适合次设计
    11 研究目意义
    合理规划中央空调直型商场基础设施甚商场空调低温度较高空气新鲜度会成吸引顾客驻足消费原满足较优良供冷需求济性节相衡次研究设计目
    设计满足商场设计额定制冷需求时通种空调系统布置质优价廉制冷机组灵活运配合满足状态工况达节环保降低成目标次研究设计意义 
    12 商场空调系统现状
    1商场空调系统运行出现问题商场空间采空气水系统仅会造成冷量足南方潮湿雨设水配空气水系统运行造成问题增加维修成
    2商场空调系统分区合理商场觉省事方便会整区域采全空气系统商场员办公区域常常会散流器喉部风速产生噪音困扰降低工作强度欲长便会造成济损失






    2 工程概况
    21设计概况
    工程广州某型商场暖通空调设计工程设计功家居售卖区零售商铺超市总建筑面积240072㎡该建筑特点建筑面积该商场设计仓储式量贩模式层高较高层8米2层层中心区域家居货物卖场南侧层办公区域二层中心区域超级市场北侧区域办公区广州属海洋亚热带季风性气候夏季长阳光充足设计空调系统通风系统
    22室外气象参数
    具体情况详见表21工程图见附录I
    表21建筑概况表
    工程含建筑物栋数
    1
    建筑物名称
    型商场
    层数
    2
    层数
    0
    占面积(㎡)
    120015
    建筑面积(㎡)
    240032
    建筑面积(㎡)
    0
    建筑总高度(m)
    16
    室外设计气象参数:参广州区室外气象资料摘民建筑供暖通风空气调节设计规范(GB 507362012)
    1夏季:夏季空调室外设计干球温度:342℃
    夏季通风室外设计干球温度:318℃
    夏季空调室外设计湿球温度:278℃
    夏季气压力(pa):100400
    2冬季:冬季空调室外设计干球温度:52℃
    冬季通风室外设计干球温度:136℃
    冬季采暖室外设计干球温度:8℃
    冬季气压力(pa):101900


    23 室气象参数
    表22空调房间夏季室设计参数参考表

    夏季干球温度(℃)
    新风量(m³h*p)
    总裁办公室
    2324
    65
    贵宾室办公室
    2425
    50
    办公室休息室会议室
    2526
    3035
    商场票示厅
    2526
    1520
    计算机中心
    2123
    30
    电话机房消防控制中心
    2526
    30
    宴会厅餐厅
    2425
    1520

    表23设计空调房间夏季室设计参数表

    夏季设计温度(℃)
    新风量
    (m³h*p)
    房间面积(㎡)
    房间类型
    楼1~楼层1~层厅
    26
    16
    913200
    商场厅
    楼1~楼层1~收货文员室
    26
    30
    2970
    办公室
    楼1~楼层1~办公室1
    26
    30
    3854
    办公室
    楼1~楼层1~办1
    26
    30
    2709
    办公室
    楼1~楼层1~办2
    26
    30
    2709
    办公室
    楼1~楼层1~办3
    26
    30
    2709
    办公室
    楼1~楼层1~办4
    26
    30
    2709
    办公室
    楼1~楼层1~办1
    26
    30
    1620
    办公室
    楼1~楼层1~办2
    26
    30
    1620
    办公室
    楼1~楼层1~办3
    26
    30
    1620
    办公室
    楼1~楼层1~办4
    26
    30
    1620
    办公室

    续表

    夏季设计温度(℃)
    新风量
    (m³h*p)
    房间面积(㎡)
    房间类型
    楼1~楼层1~右中办
    26
    30
    2493
    办公室
    楼1~楼层1~右办1
    26
    30
    2854
    办公室
    楼1~楼层1~右办2
    26
    30
    2854
    办公室
    楼1~楼层2~二层厅
    26
    16
    899629
    商场厅
    楼1~楼层2~会议室
    26
    30
    4050
    办公室
    楼1~楼层2~商品部
    26
    30
    4050
    办公室
    楼1~楼层2~文员室
    26
    30
    1450
    办公室
    楼1~楼层2~店助室
    26
    30
    1450
    办公室
    楼1~楼层2~店长室
    26
    30
    1620
    办公室
    楼1~楼层2~防损部
    26
    30
    2020
    办公室
    楼1~楼层2~监控室
    26
    30
    1618
    办公室
    楼1~楼层2~洽谈室1
    26
    30
    1135
    办公室
    楼1~楼层2~洽谈室2
    26
    30
    1135
    办公室
    楼1~楼层2~洽谈室3
    26
    30
    1135
    办公室
    楼1~楼层2~美工室
    26
    30
    2600
    办公室
    楼1~楼层2~综合部
    26
    30
    4450
    办公室
    楼1~楼层2~男更衣间
    26
    30
    6075
    综合
    楼1~楼层2~女更衣间
    26
    30
    1865
    综合


    续表

    夏季设计温度(℃)
    新风量
    (m³h*p)
    房间面积(㎡)
    房间类型
    楼1~楼层2~民警办
    26
    30
    2590
    办公室
    楼1~楼层2~计算机房
    26
    30
    2590
    办公室
    楼1~楼层2~玻璃隔断间
    26
    30
    1942
    办公室
    楼1~楼层2~收银部
    26
    30
    1971
    办公室
    楼1~楼层2~金库
    26
    30
    1971
    办公室
    楼1~楼层2~财务部
    26
    30
    1070
    办公室
    24 围护结构参数
    1外墙结构构成:水泥刷浆抹灰加浅色喷浆砖墙沥青膨胀珍珠岩粉刷加油漆层
    外墙材料层厚度50mm夏季传热系数095w㎡℃冬季110w㎡℃夏季传热阻105㎡℃w
    2墙结构构成:加气混凝土板
    墙材料层厚度70mm夏季传热系数134w㎡℃冬季134w㎡℃夏季传热阻075㎡℃w
    3门结构构成:3mm普通玻璃单层单框
    门材料层厚度3mm夏季传热系数580w㎡℃冬季640w㎡℃夏季传热阻017㎡℃w
    4面结构构成:基层碎砖混凝土面层水泥砂浆
    夏季传热系数7w㎡℃冬季7w㎡℃夏季传热阻014㎡℃w
    5窗结构构成:3mm普通玻璃单层钢框
    外墙材料层厚度3mm夏季传热系数580w㎡℃冬季640w㎡℃夏季传热阻017㎡℃w
    6屋顶结构构成:防水层加豆石水泥砂浆热层保温层隔汽层承重层粉刷
    屋顶材料层厚度200mm夏季传热系数079w㎡℃冬季106w㎡℃传热阻127㎡℃w
    7玻璃幕墙结构构成:10mm浮法玻璃单层铝框
    夏季传热系数664w㎡℃冬季730w㎡℃传热阻015㎡℃w
    8外门结构构成:3mm普通玻璃双层钢框
    外门材料层厚度6mm夏季传热系数580w㎡℃冬季640w㎡℃传热阻045㎡℃w
    25 设计
    摘民建筑供暖通风空气调节设计规范(GB 507362012)详见表24
    表24高密度建筑需新风量表
    建筑类型
    员密度Pr≤04
    04≤员密度Pr≤10
    员密度Pr≥10
    影剧院音乐厅功厅会议室
    14
    12
    11
    商场超市展览厅博物馆
    19
    16
    15
    餐厅宴会厅咖啡厅酒吧
    30
    25
    23
    健身房
    40
    38
    37
    图书馆
    20
    17
    16
    教室
    28
    24
    22
    歌厅
    23
    20
    19












    3负荷计算
    31冷负荷计算
    311冷负荷基概念
    冷负荷维持房间温度湿度采空调系统带走房间热量空调房间冷负荷冷负荷表述某段时间需房间提供冷量显热量潜热量构成冷负荷
    312冷负荷计算方法
    民建筑供暖通风空气调节设计规范(GB507362012)中规定确定
    1通外墙屋面外窗等围护结构传热形成冷负荷:
    (式31)
    (式32)
    (式33)


    式中: —外墙传热形成逐时冷负荷(W)
    —外墙屋面外窗传热系数[W(㎡*K)]
    —外墙屋面者外窗传热面积(㎡)
    —外墙逐时冷负荷计算温度(℃)
    —夏季空调区设计温度(℃)
    —屋面传热形成逐时冷负荷(W)
    —外窗传热形成逐时冷负荷(W)
    —屋面逐时冷负荷计算温度(℃)
    —外窗逐时冷负荷计算温度(℃)


    2阳光通外窗射入屋热形成冷负荷:

    (式34) ( 式 35 )
    式中:—透玻璃窗进入太阳辐射热形成逐时冷负荷(W)
    —透遮阳标准玻璃太阳辐射热形成逐时冷负荷系数
    —外穿综合遮挡系数
    —夏季日射热系数值
    —窗玻璃净面积(㎡)
    —外窗综合遮挡系数
    —外遮阳修正系数
    —玻璃修正系数
    3体明设备等散热形成冷负荷:
    (式36)
    (式37)
    (式38)
    式中:—体散热形成逐时冷负荷(W)
    —体冷负荷系数
    —群集系数
    —体散热量(W)
    —明散热形成逐时冷负荷(W)
    —明冷负荷系数
    —明修正系数
    —明散热量(W)
    —设备散热形成逐时冷负荷(W)
    —设备冷负荷系数
    —设备修正系数
    —设备散热量(W)
    4夏季室外温度差值3℃时空气调节区域区域通墙体等围护结构传导热量形成冷负荷计算公式:
    (式39)
    (式310)
    式中:—围护结构传热形成冷负荷(W)
    —外墙屋面外窗传热系数[W(㎡*K)]
    —外墙屋面者外窗传热面积(㎡)
    —夏季空调区设计温度(℃)
    —夏季空调室外计算日均温度(℃)
    —非空调房间夏季空调室外间计算日均温度差值(℃)
    313计算公式
    1外部墙体屋顶表面传热冷负荷计算公式:

    (式311)
        式中   计算面积 ㎡
              计算时刻点钟
             温度波作时刻温度波作外墙屋面外侧时刻
            作时刻通外部墙体屋顶表面冷负荷计算温差称负荷温差(℃)
        外部墙体屋顶表面衰减系数<02时日均冷负荷代计算时刻冷负荷:
      (式312)
        式中     —负荷温差日均值℃
      —外墙屋面外窗传热系数[W(㎡*K)]
    —外墙屋面者外窗传导热量面积(㎡)
    2外窗温度差值传热冷负荷
            (式313)
        式中     —计算时刻负荷温差℃
    —传热系数双层窗户取值29单层窗户取值58W㎡*℃
    3外窗太阳辐射冷负荷
      阳光通玻璃窗射入室太阳辐射产生逐时冷负荷:
            (式314)
            (式315)
           ——透玻璃窗进入太阳辐射热形成逐时冷负荷(W)
         ——透遮阳标准玻璃太阳辐射冷负荷系数
           ———外窗综合遮挡系数
             ———外遮阳修正系数
     ———遮阳修正系数
           ———玻璃修正系数
            ———夏季日射热素值
            ————窗户玻璃净面积(㎡)
    4部围护结构传热冷负荷
    相邻房间定发热量时通空调房间窗墙体等部围护结构产生温差传热负荷Q式计算:
      (式316)
    式中  —稳态冷负荷W
           —夏季空气调节室外计算日均温度℃
            —夏季空气调节室计算温度℃
    —相邻房间温升采相邻房间散热强度℃
    5体冷负荷
        体显热散热形成计算时刻冷负荷Q式计算:
                  (式317)
        式中     —群体系数
                —计算时刻空调房间总数
                —名成年男子时显热散热量W
               —员进入空调房间时刻点钟
              —员进入房间时算起计算时刻时间h
               —时间体显热散热量冷负荷系数
     6明设备冷负荷
    根灯具类型安装情况计算明设备散热冷负荷Q计算公式:
    (1)装空调房外白炽灯带镇流器荧光灯
               (式318)
         (2)镇流器装空调房间荧光灯
                (式319)
         (3)暗装吊顶玻璃罩荧光灯
                   (式320)
        式中   明设备安装功率kW
            受反射素影响吊顶通风系数荧光灯灯罩散热孔时热量散吊顶取值0506荧光灯灯罩散热孔时取值0608
            时系数般0508
            开灯时刻点钟
            开灯时刻算起计算时刻时间h
           时间明散热冷负荷系数
    7类设备冷负荷
    热源设备表面散发热量计算时刻冷负荷Qτ计算公式:                (式321)
         式中 热源投入时刻点钟
               热源投入时刻算起计算时刻时间h
               时间设备器具散热冷负荷系数
               热源实际散发出热量W
    电动设备电热散发出热量计算:
       电热设备散发出热量值公式
                   (式322)
    电动机工艺设备均空调房间散发量
                     (式323)
       电动机空调房间散热量
                      (式324)
        工艺设备空调房间散热量
                      (式325)
       式中   设备总安装功率kW
              电动机效率
              时系数般取0510
              利系数般取0709
              时均实耗功率设计功率般取05左右
              通风保温系数
             输入功率系数
    8渗透空气显热冷负荷
         (1)渗入空气总量计算
        开启外门进入室空气总量 (kgh)式估算:
                      (式326)
        式中    时流量
               外门开启次渗入空气量m³h
               夏季室外干球温度空气密度kgm³
        房间门窗进入房间空气总量(kgh)式估算:
               (式327)
         式中    时换气次数
               房间容积m^3
        (2)渗透空气显冷负荷(W)式计算:
                  (式328)
         式中     单位时间渗入室总空气量kgh
                 夏季空调室外干球温度℃
                室计算温度℃
    9餐厅食物显热冷负荷
      计算餐厅冷负荷时充分考虑食物散热量需位食客9W考虑计算食物显热冷负荷
    10伴散湿潜热冷负荷
       体散湿量计算公式
               (式329)
         式中     散湿量kgh
               成年男子时散湿量gh
    体散湿潜热冷负荷Q(W)计算公式:
                 (式330)
         式中     名成年男子时潜热散热量W
                 群体系数
    空气渗透带房间湿量(kgh)计算公式:
                  (式331)
    渗入空气形成潜热冷负荷(W)计算公式:
                  (式332)
    式中     室外空气含湿量gkg
               室空气含湿量gkg
               室外空气焓值kJkg
               室空气焓值KJKG
     餐厅中食品散湿量(kgh)计算公式:
              (式333)
      式中   餐总数
    食物散湿量形成潜热冷负荷(W)计算公式:
                       (式334)
       露天水面蒸发散湿量(kgh)计算公式:
                        (式335)
      露天水面蒸发形成显热冷负荷(W)计算公式:
                      (式336)
       式中      蒸发表面积㎡
               单位水面蒸发量
            汽化潜热kJkg
    314围护结构基耗热量
    通围护结构基耗热量计算公式
    (式337)
    基耗热量W
    传热系数W(㎡·℃)
    计算传热面积㎡
    冬季室设计温度℃
    采暖室外计算温度℃
    温差修正系数
    附加耗热量计算公式
    (式338)
    考虑项附加某围护耗热量
    某围护基耗热量
    修正
    风力修正
    两面外墙修正
    房高附加
    315冷风渗透耗热量
    冷风渗透计算
    (式339)
    通门窗冷风渗透耗热量W
    采暖室外计算温度空气密度kgm3
    渗透冷空气量m3h
    冬季室设计温度℃
    采暖室外计算温度℃
    通门窗缝隙冷风渗透耗热量计算
    (式340)
    考虑房屋房屋部进行隔断情况单纯风压作基准高度单位长度门窗缝隙渗透冷空气量理值m3(m·h)
    外门窗缝隙长度应分计算m
    门窗缝隙渗风指数般取值 056~078没进行实际测量时取值067
    综合考虑建筑体量空气流通等种素针高度情况门窗冷风渗透压差综合修正系数
    忽略热压室外风速房高递增计入风压作时渗风量
    (式341)
    房间某开启门窗缝隙长度m
    米门窗缝隙渗风量m3(m·h)
    渗风量修正系数
    换气次数法
    (式342)
    房间冷风渗透量m3h
    换气次数1h
    房间净体积m3
    百分法计算冷风渗透耗热量
    (式343)
    通外门窗冷风渗透耗热量
    围护结构总耗热量W
    渗透消耗热量值占围护结构总体消耗热量值百分率
    316冷风侵入消耗热量
    冷风消耗热量公式计算:
    (式344)
    通外门冷风侵入耗热量
    某围护基耗热量
    外门开启入房间冷风消耗热量值附加率
    32湿负荷计算
    1体散湿量式计算
    0278ng* (式345)
    式中 ——体散湿量kgs
    ——成年男子时散湿量
    n——室全部数
    ——群集系数
    2敞开水表面散湿量

    (式346)
    式中 ——敞开水表面散湿量kgs
    单位水面蒸发量kg
    蒸发表面面积m2
    33新风冷负荷计算
    夏季空调式计算:
    (式347)
    式中 ——夏季新风冷负荷KW
    ——新风量kgs
    ——室外空气焓值kjkg
    ——室空气焓值kjkg
    负荷统计数 单位W
    详见负荷统计数表
    表33负荷统计数表
    项目名称
    总冷负荷
    (全热)
    总冷负荷
    (显热)

    冷负荷
    (全热)
    夏季室
    湿负荷
    (gh)
    夏季
    新风量
    (m³h)
    新风
    冷负荷
    夏季
    负荷
    发生时刻
    总冷指标
    (W㎡)
    总热负荷
    (全热)
    总热指标
    (W㎡)
    房间面积
    (㎡)
    楼1~楼层1~层厅
    56899831
    33271803
    440782
    19725120
    1461120
    13429425
    1900
    6171
    000
    1
    913200
    楼1~楼层1~收货文员室
    401891
    232274
    2380
    81972
    14850
    163835
    1700
    13582
    000
    1
    2970
    续表
    项目名称
    总冷负荷
    (全热)
    总冷负荷
    (显热)

    冷负荷
    (全热)
    夏季室
    湿负荷
    (gh)
    夏季
    新风量
    (m³h)
    新风
    冷负荷
    夏季
    负荷
    发生时刻
    总冷指标
    (W㎡)
    总热负荷
    (全热)
    总热指标
    (W㎡)
    房间面积
    (㎡)
    楼1~楼层1~办公室1
    475368
    211246
    2202
    127644
    23124
    255120
    1700
    12384
    000
    1
    3854
    楼1~楼层1~办1
    341781
    156127
    1624
    89722
    16254
    179325
    1700
    12666
    000
    1
    2709
    楼1~楼层1~办2]
    341781
    156127
    1624
    89722
    16254
    179325
    1700
    12666
    000
    1
    2709
    楼1~楼层1~办
    341781
    156127
    1624
    89722
    16254
    179325
    1700
    12666
    000
    1
    2709
    楼1~楼层1~办1
    129478
    73967
    758
    26827
    4860
    53619
    1700
    8042
    133849
    82
    1620
    楼1~楼层1~办2
    129478
    73967
    758
    26827
    4860
    53619
    1700
    8042
    133849
    82
    1620
    楼1~楼层1~办3
    129478
    73967
    758
    26827
    4860
    53619
    1700
    8042
    133849
    82
    1620
    楼1~楼层1~办4
    129478
    73967
    758
    26827
    4860
    53619
    1700
    8042
    133849
    82
    1620



    续表
    项目名称
    总冷负荷
    (全热)
    总冷负荷
    (显热)

    冷负荷
    (全热)
    夏季室
    湿负荷
    (gh)
    夏季
    新风量
    (m³h)
    新风
    冷负荷
    夏季
    负荷
    发生时刻
    总冷指标
    (W㎡)
    总热负荷
    (全热)
    总热指标
    (W㎡)
    房间面积
    (㎡)
    楼1~楼层2~监控室
    149644
    89340
    860
    18849
    5764
    63594
    1700
    9299
    208672
    1
    1618
    楼1~楼层2~洽谈室
    279329
    237027
    2347
    13222
    4043
    44610
    1500
    24661
    000
    1
    1135
    楼1~楼层2~洽谈室1
    279329
    237027
    2347
    13222
    4043
    44610
    1500
    24661
    000
    1
    1135
    楼1~楼层2~洽谈室2
    279329
    237027
    2347
    13222
    4043
    44610
    1500
    24661
    000
    1
    1135
    楼1~楼层2~美工室
    137906
    77602
    743
    18849
    5764
    63594
    1700
    8573
    000
    1
    1618
    楼1~楼层2~综合部
    225990
    129086
    1238
    30288
    9262
    102190
    1700
    8742
    000
    1
    2600

    楼1~楼层2~男更衣间

    280225

    194000
    2213

    73692

    5340

    58915

    1700

    6347

    000

    1

    4450
    楼1~楼层2~女更衣间
    518006
    309839
    3169
    100602
    18225
    201071
    1700
    8577
    000
    1
    6075
    楼1~楼层2~民警办
    143126
    87518
    844
    17381
    5315
    58641
    1700
    7724
    000
    1
    1865


    续表
    项目名称
    总冷负荷
    (全热)
    总冷负荷
    (显热)

    冷负荷
    (全热)
    夏季室
    湿负荷
    (gh)
    夏季
    新风量
    (m³h)
    新风
    冷负荷
    夏季
    负荷
    发生时刻
    总冷指标
    (W㎡)
    总热负荷
    (全热)
    总热指标
    (W㎡)
    房间面积
    (㎡)
    楼1~楼层2~计算机房
    207668
    130442
    1262
    24138
    7382
    81438
    1700
    8068
    000
    1
    2590
    楼1~楼层2~玻璃隔断间
    166038
    99494
    1017
    32160
    5826
    64276
    1700
    8600
    000
    1
    1942
    楼1~楼层2~收银部
    175069
    107531
    1098
    32640
    5913
    65236
    1700
    8932
    218190
    110
    1971
    楼1~楼层2~金库
    168299
    100761
    1030
    32640
    5913
    65236
    1700
    8589
    000
    1
    1971
    楼1~楼层2~财务部
    106730
    66850
    646
    12465
    3812
    42055
    1700
    10025
    163965
    153
    1070
    楼1~楼层2购物厅
    44566072
    20347562
    250391
    15476567
    1572850
    14702083
    1700
    4247
    590827
    0
    942817
    楼1
    107344886
    54398656
    695505
    36062331
    3203145
    29997975
    1700
    5227
    1755897
    0
    2400726






    4 空调系统方案确定
    41 空调系统分类较
    1采处理空气方式进行分类:
    中央空调系统:冷水机组热泵机组提供载冷载热介质水泵介质泵送空气机组空气进行冷热交换处理空气输送空调房间
    分散式空调系统:冷水机组热泵机组空气机组输送介质设备组合成体直接安装空气调节房间
    空调系统:兼具中央空调系统分散式空调特点
    2冷热介质冷热交换位置进行分类:
    全空气系统:载冷载热介质会直接进入空气调节房间进入外部空气处理机组房间处理空气空调房间传递冷热量空调房间风道存存水系统出现目前常见全空气系统般指二次回风空调系统
     空气水系统:未处理外部空气携带载冷载热介质水时送进空调房间外部新风满足房间通风换气新风量需求型空气处理设备(例风机盘)载冷载热介质水传送房间进行房间冷热量湿量交换风机盘加独立新风系统典型例子
    3全水系统:水作载冷载热介质直接外界空气进行次热交换空调系统相输送等冷(热)量区域时消耗量更少数中心等类常活动区域作范围中央空调系统
    42 方案确定
    次设计商场占面积2400726㎡两层区域划分顾客处购物厅区域办公员处办公区域说风机盘加独立新风系统独立启停降低耗空气进行仔细处理带更加舒适感觉面购物厅种面积流密集区域单台予制冷量加湿量足承担厅冷湿负荷况规模布置风机盘需厅设置供水回水系统厅风机盘长期处未处理量空气样环境否会风机盘接口法兰造成程度影响腐蚀接口设备年限进行量维修更换零件必然会造成商场歇业营业额造成损失旦供水回水设备末端处出现跑水喷涌情况会造成客源流失商场购物厅存着量电设备旦出现类事会造成财产损失会危员商场名声口碑复存厅中应该避免设置种复杂低效空调系统设计采全空气系统组合式空气处理机组(空调箱)针购物厅区域种面积员流动群相密集情况进行空气处理路设计方面需设计新风道连结新风机段设计送风道回风道进入室进行送风回风商场相设计空间言噪声允许程度较高影响程度会低利全空气系统类噪声程度较高系统设计结构简单必考虑风机盘供回水选型设计简单安全适合商场厅规模设计
    商场办公区域刚相反办公室噪声容忍程度低处理空气质量高果全空气系统设计进入办公区域会带较噪声危害恶劣办公条件外全空气系统处理湿量佳办公区域提供湿度温度合适处理空气会影响办公效率员工工作状态极受影响会带业绩损失风机盘加独立新风系统会解决缺点办公区域面积限会造成次部署量风机盘情况办公室面积局限利布置利维修换时控制设备启停利降低耗节约电加新风机组带室外新风会舒适体验工作效率幅提高企业增添效益
    制宜二层办公区域布置风机盘加独立新风系统二层厅区域布置全空气系统次设计方案确定
    43 空气处理程计算
    设计二层办公区域采风机盘加独立新风系统二层购物厅采全空气次回风系统焓湿图例图4243

    图42层厅焓湿图
    该购物厅空调方案设计计算程:
    夏季冷负荷4407833W湿负荷5479gs:
    焓湿图画出室外状态点W室状态点N
    根计算出湿负荷W室冷负荷Q求出焓湿图中N点画出程线
    结合露点送风方式画出95相舒适度等相湿度线该线线交O点O送风状态点
    知新风回风混合状态点C连接C点O点
    热湿
    绘图查找送风状态点:采机器露点送风方式焓湿图画出N点N点作热湿线交线O点确定
    送风量计算送风量
    计算混风14新风量值GW15093m3h
    计算新回风混合状态点:
    作图法确定C点ic652kJkg
    求系统需制冷量





    图43二层商品部焓湿图

    该办公区空调方案计算设计程:
    1通查找室外设计参数确定室外状态点W室状态点N
    2绘图查找新风处理状态点L 等相湿度线室控制状态点N等焓线交点新风处理终状态点L
    3绘图查找送风状态点O 风机盘加新风系统空调体体感舒适度较受送风温差限制送风时采送风温差等相湿度线N点作线相交交点送风状态点O
    4计算房间总送风量
    (式41)
    式中: —室总冷负荷kW
    室空气焓值kJkg
    送风状态点焓值kJkg

    5计算风机盘处理风量
    (式42)
    式中 房间总送风量kgs
    房间新风量kgs

    6确定风机盘处理空气状态点M焓值
    (式43)
    式中: 送风状态点焓值kJkg
    房间新风量kgs
    风机盘处理风量
    新风机组处理空气焓值kJkg

    7风机盘处理室循环空气需冷量计算
    (式44)
    式中:风机盘处理风量
    室空气焓值kJkg
    风机盘处理空气状态点M焓值kJkg
    例子二层商品部:房间送风量
    6277÷(56463)06471kgs1939m³h
    风机盘处理风量
    06741003190643kgs178788m³h
    风机盘处理空气状态点M焓值
    463(003190643)*(477463)
    4623kJkg
    风机盘处理室循环空气需冷量
    (564623)*06436277kw





    终风量统计表43呈现


    43风量统计表

    总送风量(m³h)
    新风量(m³h)
    层厅
    107814
    16411
    二层厅
    25089
    14394
    收货文员
    479
    149
    办公室1
    430
    231

    163
    192

    150
    49
    右中办
    177
    147
    右办1
    265
    163
    右办2
    265
    163
    男更衣间
    454
    53
    女更衣间
    669
    182
    民警办
    213
    53
    计算机房
    324
    74
    玻璃隔断间
    215
    58
    收银部
    240
    59
    金库
    218
    59
    财务部
    266
    38
    会议室
    1266
    144
    事部
    179
    15
    店助室
    940
    52
    店长室
    177
    58
    防损部
    106
    29
    监控室
    212
    58
    洽谈室
    717
    40
    美工室
    174
    58
    综合部
    294
    93
















    5空调风系统
    51气流组织
    511气流组织基求
    充分考虑体舒适度合理布局气流组织优化室空气交换确保室空气湿度温度洁净度流速等方面取良交换效果
    512气流组织基形式
    风口送回布置型式布置位置分类:送风回风送风回风中送风回风送风回风侧送风侧回风该建筑空调系统办公区域采送风回风二层购物厅设计需采中送风回风形式
    52风尺寸确定水力计算
    采假定流速法先假设风流速度选定风径计算风道阻力然核算风速
    1矩形风风量
    (式51)
    式中 Q风风量m³h
    LW风截面长宽
    风速
    2风程摩擦损失
    (式52)
    式中
    风程摩擦损失
    单位长程摩擦阻力
    风长度m
    3单位长程摩擦阻力
    (式53)
    式中
    单位长程摩擦阻力
    λ摩擦阻力系数
    空气密度
    量直径
    中式(54)计算:
    (式54)
    式中
    风壁绝粗糙度
    雷诺数
    中 (式55)
    运动粘度 m2 s
    4风局部阻力
    (式56)
    式中
    局部阻力系数
    应端面流速
    气流密度取
    5段全压损失
    (式57)
    式中
    段全压损失Pa
    风程摩擦损失Pa
    局部阻力Pa
    6风风速确定
    风风速参考表51示:


    表51风空气流速表
    风分类
    住宅ms
    公建筑ms

    3060
    5080
    风分类
    住宅ms
    公建筑ms

    3050
    3065
    支接出风
    2540
    3060
    通风入口
    3545
    4050
    通风机出口
    5085
    60110

    风尺寸确定:根焓湿图定送风量确定风尺寸中控制摩阻15pam民建筑供暖通风空气调节设计规范(GB 507362012)663通风章节确定干支空气流速反复较选定尺寸
    设计办公区新风系统建筑结构分层式设计层设置台全热交换新风机组该层房间提供新风

    图51 层办公区新风道系统轴线图










    根面公式计算层新风计算汇总表表52
    表52 层办公区利新风水力计算
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    1
    1696
    318
    矩形
    500
    160
    589
    579
    1888
    2467
    2
    1547
    841
    矩形
    500
    160
    537
    1289
    2132
    3421
    3
    1547
    2018
    矩形
    500
    160
    537
    3094
    2032
    5122
    4
    1316
    271
    矩形
    400
    160
    571
    501
    2448
    2949
    5
    1316
    1083
    矩形
    400
    160
    571
    2004
    2442
    4416
    6
    1316
    431
    矩形
    400
    160
    571
    798
    0
    798
    7
    1267
    078
    矩形
    400
    160
    55
    135
    0
    135
    8
    1104
    373
    矩形
    320
    160
    599
    821
    065
    886
    9
    1055
    202
    矩形
    320
    160
    572
    409
    0
    409
    10
    892
    233
    矩形
    320
    160
    484
    345
    0
    345
    11
    843
    169
    矩形
    250
    160
    585
    399
    098
    498
    12
    680
    259
    矩形
    200
    160
    59
    696
    0
    696


    续表
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    13
    631
    177
    矩形
    200
    160
    548
    414
    0
    414
    14
    468
    273
    矩形
    160
    160
    508
    633
    1728
    236
    15
    468
    10
    矩形
    160
    160
    508
    2315
    1794
    4109
    16
    468
    36
    矩形
    160
    160
    508
    834
    0
    834
    17
    468
    699
    矩形
    160
    120
    472
    1711
    1531
    3242
    18
    326
    699
    矩形
    160
    120
    472
    234
    0
    234
    19
    163
    6
    矩形
    120
    120
    314
    823
    676
    1499
    20
    163
    962
    矩形
    120
    120
    314
    1319
    1615
    2934
    合计
    17592
    10443






    357




    图52 二层办公区新风道系统轴线图
    根面公式计算层新风计算汇总表表53


    表53二层办公区利新风水力计算
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    1
    1333
    499
    矩形
    400
    160
    579
    945
    1823
    2768
    8
    1098
    216
    矩形
    400
    160
    477
    284
    2047
    2331
    9
    1098
    718
    矩形
    400
    160
    477
    947
    1679
    2626
    10
    1098
    465
    矩形
    400
    160
    477
    615
    0
    615
    11
    1005
    518
    矩形
    400
    160
    436
    58
    0
    58
    12
    965
    071
    矩形
    400
    160
    419
    073
    0
    073
    13
    907
    179
    矩形
    400
    160
    394
    166
    0
    166

    续表
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    14
    809
    281
    矩形
    400
    160
    351
    211
    098
    308
    15
    769
    136
    矩形
    400
    160
    334
    093
    0
    093
    16
    688
    266
    矩形
    400
    160
    334
    244
    118
    361
    17
    630
    178
    矩形
    320
    160
    342
    138
    0
    138
    18
    578
    591
    矩形
    320
    160
    314
    392
    0
    392
    19
    489
    051
    矩形
    250
    160
    34
    044
    844
    888
    20
    489
    324
    矩形
    250
    160
    34
    278
    0
    278
    21
    484
    156
    矩形
    250
    160
    336
    131
    8
    322
    22
    484
    156
    矩形
    250
    160
    336
    322
    0
    322
    23
    340
    192
    矩形
    250
    160
    315
    181
    707
    888
    24
    340
    208
    矩形
    250
    120
    315
    196
    727
    923
    25
    340
    365
    矩形
    250
    120
    315
    3439
    727
    4185
    26
    340
    863
    矩形
    250
    120
    332
    366
    0
    366
    续表
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    27
    287
    32
    矩形
    200
    120
    332
    366
    0
    366
    28
    213
    251
    矩形
    160
    120
    308
    28
    0
    28
    29
    155
    466
    矩形
    120
    120
    299
    583
    0
    583
    30
    97
    11
    矩形
    120
    120
    187
    059
    235
    293
    31
    97
    237
    矩形
    120
    120
    187
    127
    0
    127
    32
    59
    181
    矩形
    120
    120
    114
    04
    209
    249
    合计
    15192
    1994






    289














    设计购物厅区域采全空气系统空调箱进行空气处理建筑结构分层式设计层设置三台相型号组合式空气处理机组该层厅送风回风风布置形式均相二层厅设置台组合式空气处理机组该层厅送风回风具体分布方轴线图示

    图53 层厅送风道系统轴线图
    根面公式计算层新风计算汇总表表54
    表54层厅利送风水力计算
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    1
    35940
    267
    矩形
    1600
    1250
    499
    042
    313
    3172
    2
    35940
    439
    矩形
    1600
    1250
    499
    069
    844
    914
    3
    35940
    542
    矩形
    1600
    1250
    499
    086
    0
    086
    4
    28752
    091
    矩形
    1250
    1250
    511
    186
    1818
    2003
    5
    28752
    978
    矩形
    1250
    1250
    511
    186
    1818
    2003
    6
    28572
    127
    矩形
    1250
    1250
    511
    024
    0
    014
    续表
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    7
    28572
    3139
    矩形
    1250
    1250
    511
    596
    1818
    2413
    8
    28572
    074
    矩形
    1250
    1250
    511
    014
    0
    014
    9
    14376
    699
    矩形
    1250
    630
    507
    211
    203
    414
    10
    7188
    1203
    矩形
    630
    630
    503
    506
    959
    1466
    11
    3594
    1499
    矩形
    630
    500
    317
    31
    1641
    1951
    合计
    276738
    8938






    161



    图54 层厅回风道系统轴线图
    根面公式计算层新风计算汇总表表55
    表55层厅利回风水力计算
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    1
    31070
    229
    矩形
    2000
    800
    539
    053
    1584
    1638
    2
    18642
    6034
    矩形
    1600
    630
    514
    1707
    198
    3686
    3
    18642
    815
    矩形
    1600
    630
    514
    231
    1952
    2183
    4
    18642
    1055
    矩形
    1600
    630
    514
    298
    1952
    2251
    5
    18642
    487
    矩形
    1600
    630
    514
    138
    0
    138
    6
    12428
    131
    矩形
    1250
    500
    552
    056
    1108
    1164
    7
    12428
    735
    矩形
    1250
    500
    552
    317
    0
    317
    8
    6214
    038
    矩形
    800
    400
    539
    022
    1098
    112
    10
    6214
    086
    矩形
    800
    400
    539
    05
    4753
    4803
    总计
    136708
    10235






    198



    图55 层厅送风道系统轴线图
    根面公式计算二层厅送风计算汇总表表56
    表56二层厅利送风水力计算
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    1
    25080
    97
    矩形
    1600
    800
    544
    251
    1613
    1864
    2
    22572
    275
    矩形
    1600
    800
    49
    058
    0
    058
    3
    20064
    589
    矩形
    1600
    630
    553
    191
    08
    271
    4
    17556
    789
    矩形
    1600
    630
    484
    199
    0
    199
    5
    15048
    5
    矩形
    1600
    500
    522
    179
    039
    218
    6
    12540
    179
    矩形
    1250
    500
    557
    784
    024
    808
    7
    10032
    1278
    矩形
    1000
    400
    522
    609
    0
    609
    8
    7524
    121
    矩形
    1000
    500
    522
    616
    0
    616
    续表
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    9
    5016
    1485
    矩形
    800
    320
    544
    1071
    014
    1085
    10
    2508
    789
    矩形
    400
    320
    544
    773
    2206
    2979
    11
    2508
    1342
    矩形
    400
    320
    544
    773
    2206
    2979
    12
    1254
    1168
    矩形
    320
    320
    34
    544
    189
    2435
    总计
    138194
    11398






    135


    图56 层厅送风道系统轴线图
    根面公式计算二层厅送风计算汇总表表57
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    1
    10700
    2386
    矩形
    1000
    500
    594
    1283
    1924
    3207
    2
    9630
    089
    矩形
    1000
    500
    535
    039
    2078
    2117
    续表
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    3
    9630
    1134
    矩形
    1000
    500
    535
    5
    0
    5
    4
    8560
    074
    矩形
    1000
    400
    594
    048
    2697
    2745
    5
    8650
    3292
    矩形
    1000
    400
    594
    2134
    0
    2134
    6
    7490
    21
    矩形
    1000
    400
    52
    106
    1967
    2073
    7
    7490
    1415
    矩形
    1000
    400
    52
    714
    917
    163
    8
    7490
    065
    矩形
    1000
    400
    52
    033
    0
    033
    9
    6420
    135
    矩形
    800
    400
    557
    084
    2315
    2399
    10
    6420
    1114
    矩形
    800
    400
    557
    695
    2274
    2969
    11
    6420
    5223
    矩形
    800
    400
    557
    3261
    2274
    5535
    12
    6420
    179
    矩形
    800
    400
    557
    112
    2274
    2385
    13
    6420
    105
    矩形
    800
    400
    557
    656
    2274
    2929
    14
    6420
    1007
    矩形
    800
    400
    557
    629
    0
    629
    15
    5350
    11
    矩形
    800
    320
    581
    09
    1146
    1236
    续表
    编号
    风量G
    m³h
    长L
    m
    形状
    直径W
    mm
    高度H
    mm
    流速V
    ms
    ΔPm
    pa
    ΔPj
    pa
    ΔP
    pa
    16
    5350
    83
    矩形
    800
    320
    581
    675
    1142
    1817
    17
    5350
    019
    矩形
    800
    320
    581
    015
    0
    015
    18
    4280
    071
    矩形
    630
    320
    59
    065
    1135
    1201
    19
    4280
    2415
    矩形
    630
    320
    59
    2216
    0
    2216
    20
    3210
    1005
    矩形
    500
    320
    557
    919
    0
    919
    21
    2140
    843
    矩形
    320
    320
    581
    1062
    062
    1124
    22
    1070
    047
    矩形
    320
    320
    581
    098
    1305
    1403
    23
    1070
    2659
    矩形
    320
    160
    581
    5523
    2467
    799
    24
    1070
    068
    矩形
    320
    160
    581
    141
    5505
    5646
    总计
    141540
    22965






    549






    53风口选型布置
    根民建筑供暖通风空气调节设计规范(GB 507362012)节选回风口吸风速度机械通风系统进排风口空气流速进排风口风速分表58表59表510确定
    表58回风口吸风速度表
    回风口位置
    吸风速度ms
    房间部
    ≤40
    房间部常停留点时
    ≤30
    房间部常停留点时
    ≤15
    表59机械通风系统进排风口空气流速表
    部位
    新风入口ms
    风机出口ms
    住宅公建筑
    3545
    50105
    机房库房
    4050
    80140
    表510进排风口风速表
    建筑类
    新风取风口ms
    排风口ms
    般性建筑公建筑
    2045
    3050
    站房机房库房等
    4050
    5065
    根系统焓湿图定风量确定风口出:
    层厅78风口中防雨百叶600x600 3回风口1250x1250 15送风口440x440 30620x620 30
    层办公区24风口中送风口400x400 1300x300 7275x275 4回风口送风口配套风量数均相
    二层厅31风口中送风口300x300 10450x450 10回风口450x450 10
    900x900防雨百叶窗 1
    二层办公区42风口中送风口规格数量分250x250 5350x350 2300x300 5650x650 1750x750 1500x500 4550x550 1400x400 1 450x450 1回风口送风口配套风量数均相


    54风机选型计算
    根计算风量限制新风机组选择HDK02风量2000m³h功率055kw空调箱风机段层厅3台额定风量40000m³h风机二层厅1台额定风量25000m³h风机
    具体设备参数规格型号详见表511表512
    表511层空调箱设备参数表
    组合式空气处理机组
    型号
    MDM1620E
    名义风量
    m³h
    40000
    4排
    供冷量
    kw
    3364
    供热量
    kw
    2997
    水流量
    Ls
    162
    水阻力
    kPa
    80
    机组重量
    kg
    450
    电源
    380V 3N50Hz

    型式
    铜铝翅片式
    工作压力
    ≤25MPa

    风机
    型式
    前翼低噪音离心式
    传动方式
    皮带传送


    512二层空调箱设备参数表
    组合式空气处理机组
    型号
    MDM1215E
    名义风量
    m³h
    25000
    4排
    供冷量
    kw
    1629

    供热量
    kw
    1528

    水流量
    Ls
    804

    水阻力
    kPa
    75

    机组重量
    kg
    450
    电源
    380V 3N50Hz

    型式
    铜铝翅片式

    工作压力
    ≤20MPa
    风机
    型式
    前翼低噪音离心式

    传动方式
    皮带传送
    55风机盘选型

    根焓湿图状态点求出送风量办公室夏季室冷负荷进行风机盘选型具体结果图57示


    图57 二层办公区风机盘选型图
    办公区域采风机盘加独立新风系统新风机型号HDK02单台额定风量2000m³h层风机盘型号分:开利(42CE003200A)sinko(SCR300)约克(YGFC03CC2S)约克(YGFC02CC2S)约克(YGFC03CC2S)二层风机盘型号分:约克(YGFC02CC2S)约克(YGFC07CC2H)约克(YGFC03CC2H)开利(42CE002200A)开利(42CE006200A)特灵(FWD10)sinko(MH402)sinko(SCR350)sinko(ECRN400P)等




    6 空调水系统
    61 空调水系统设计原
    1空调路系统应满足输送充足载冷剂力
    2合理设置水系统道量选择程式道系统
    3系统径确定保证输送设计流量前提充分考虑降低水流噪声减少阻力损失获良济效果
    4设计程中进行严格细致水力计算进满足环路间水力衡求
    5设计时充分考虑期运维工作力做操作调节方便便维修理
    62路设计
    冷冻水系统采闭式程系统图 61 商场水环路轴线图具体示

    图61 建筑冷冻水系统示意图


    63水系统设计
    1供回水段流量

    表61 段流量表
    段编号
    流量(m³h)
    段编号
    流量(m³h)
    FG1
    1701
    FH1
    1701
    FG2
    1653
    FH2
    1653
    FG3
    417
    FH3
    417
    FG4
    417
    FH4
    417
    FG5
    386
    FH5
    386
    FG6
    344
    FH6
    344
    FG7
    313
    FH7
    313
    FG8
    271
    FH8
    271
    FG9
    240
    FH9
    240
    FG10
    198
    FH10
    198
    FG11
    167
    FH11
    167
    FG12
    125
    FH12
    125
    FG13
    086
    FH13
    086
    FG14
    1181
    FH14
    1181








    FG15
    1130
    FH15
    1130
    FG16
    1095
    FH16
    1095
    FG17
    1060
    FH17
    1060
    FG18
    1024
    FH18
    1024
    FG19
    989
    FH19
    989
    FG20
    954
    FH20
    954
    FG21
    841
    FH21
    841
    FG22
    711
    FH22
    711
    FG23
    660
    FH23
    660
    FG24
    609
    FH24
    609
    FG25
    519
    FH25
    519
    FG26
    467
    FH26
    467
    FG27
    364
    FH27
    364
    FG28
    307
    FH28
    307
    FG29
    276
    FH29
    276
    FG30
    276
    FH30
    276






















    续表
    段编号
    流量(m³h)
    段编号
    流量(m³h)
    FH31
    225
    40
    047
    FG32
    168
    FH32
    168
    FG33
    132
    FH33
    132




    2水径应道流速参考表62
    表62 水径应道流速值(ms)
    径mm
    15
    20
    25
    32
    40
    50
    65
    80
    闭式
    开式
    0405
    0304
    0506
    0405
    0607
    0506
    0709
    0608
    0810
    0709
    0912
    0810
    1014
    0912
    1216
    1114
    径mm
    100
    125
    150
    200
    250
    300
    350
    400
    闭式
    开式
    1318
    1216
    1520
    1418
    1612
    1520
    1825
    1623
    1826
    1724
    1929
    1724
    1625
    1621
    1826
    1823
    3根假设流速求径:
    (式61)
    4选定合适径核算道流速:
    (式62)
    5 程阻力计算:
    (式63)
    式中
    程阻力
    摩阻
    段长度
    6 局部阻力计算:
    (式64)
    式中
    局部阻力
    段中总局部阻力系数
    7 总阻力计算:
    (式65)
    64系统水力计算
    面公式计算确定商场冷冻水路径具体计算表
    表63 冷冻水供水路径选择
    供水路
    段编号
    流量(m³h)
    径(mm)
    流速(ms)
    长度(m)
    FG1
    1701
    80
    092
    646
    FG2
    1653
    80
    089
    601
    FG3
    417
    50
    059
    226
    FG4
    417
    15
    053
    79
    FG5
    386
    40
    049
    10
    FG6
    344
    40
    072
    314
    FG7
    313
    40
    066
    138
    FG8
    271
    15
    057
    138
    FG9
    240
    50
    051
    353
    FG10
    198
    32
    057
    096
    FG11
    167
    32
    048
    312
    FG12
    125
    25
    057
    139
    FG13
    086
    25
    038
    1173
    FG14
    1181
    65
    090
    2214
    FG15
    1130
    65
    086
    112
    FG16
    1095
    65
    084
    368
    FG17
    1060
    65
    081
    378
    FG18
    1024
    65
    078
    316
    FG19
    989
    65
    076
    298
    FG20
    954
    65
    073
    1275
    FG21
    841
    65
    064
    649
    FG22
    711
    50
    090
    128
    FG23
    660
    50
    083
    325
    FG24
    609
    50
    077
    016
    FG25
    519
    50
    065
    356
    FG26
    467
    50
    059
    059

    续表
    供水路
    段编号
    流量(m³h)
    径(mm)
    流速(ms)
    长度(m)
    FG27
    364
    50
    046
    236
    FG28
    307
    40
    065
    117
    FG29
    276
    40
    058
    189
    FG30
    276
    40
    058
    190
    FG31
    225
    40
    047
    113
    FG32
    168
    32
    049
    524
    FG33
    132
    32
    038
    3409

    表64 冷冻水回水路径选择
    回水路
    段编号
    流量(m³h)
    径(mm)
    流速(ms)
    长度(m)
    FH1
    1701
    80
    092
    646
    FH2
    1653
    80
    089
    601
    FH3
    417
    50
    059
    226
    FH4
    417
    15
    053
    79
    FH5
    386
    40
    049
    10
    FH6
    344
    40
    072
    314
    FH7
    313
    40
    066
    138
    FH8
    271
    15
    057
    138
    FH9
    240
    50
    051
    353
    FH10
    198
    32
    057
    096
    FH11
    167
    32
    048
    312
    FH12
    125
    25
    057
    139
    FH13
    086
    25
    038
    1173
    FH14
    1181
    65
    090
    2214
    FH15
    1130
    65
    086
    112
    FH16
    1095
    65
    084
    368
    FH17
    1060
    65
    081
    378
    FH18
    1024
    65
    078
    316
    FH19
    989
    65
    076
    298
    FH20
    954
    65
    073
    1275
    FH21
    841
    65
    064
    649
    FH22
    711
    50
    090
    128
    FH23
    660
    50
    083
    325

    续表
    回水路
    段编号
    流量(m³h)
    径(mm)
    流速(ms)
    长度(m)
    FH24
    609
    50
    077
    016
    FH25
    519
    50
    065
    356
    FH26
    467
    50
    059
    059
    FH27
    364
    50
    046
    236
    FH28
    307
    40
    065
    117
    FH29
    276
    40
    058
    189
    FH30
    276
    40
    058
    190
    FH31
    225
    40
    047
    113
    FH32
    168
    32
    049
    524
    FH33
    132
    32
    038
    3409

    图11中FG1FG14FG33E17FH33FH14FH1段环路冷冻水系统利路利环路阻力81332pa计算结果表5
    表65 冷冻水利环路阻力计算
    序号
    流量m³h
    径mm
    长m
    ν
    ms
    R
    Pam
    ∑§
    △Py
    Pa
    △Pj
    Pa
    △P
    Pa
    FG1
    1701
    80
    646
    092
    1415
    05
    914
    215
    1129
    FG2
    1653
    80
    601
    089
    13386
    01
    804
    40
    844
    FG14
    1181
    50
    2214
    090
    17193
    21
    3807
    857
    4464
    FG15
    1130
    50
    112
    086
    15790
    01
    176
    37
    214
    FG16
    1095
    65
    368
    084
    14859
    01
    547
    35
    582
    FG17
    1060
    65
    378
    081
    13956
    01
    527
    33
    560




    续表
    序号
    流量m³h
    径mm
    长m
    ν
    ms
    R
    Pam
    ∑§
    △Py
    Pa
    △Pj
    Pa
    △P
    Pa
    FG18
    1024
    65
    316
    078
    13081
    01
    413
    31
    443
    FG19
    989
    65
    298
    076
    12234
    01
    365
    29
    394
    FG20
    954
    65
    1275
    073
    11415
    11
    14556
    293
    14848
    FG21
    841
    65
    649
    064
    8989
    01
    583
    21
    604
    FG22
    711
    50
    128
    090
    23288
    01
    297
    40
    338
    FG23
    660
    50
    325
    083
    20177
    01
    655
    35
    690
    FG24
    609
    50
    016
    077
    17287
    01
    27
    29
    57
    FG25
    519
    50
    356
    065
    12748
    01
    454
    21
    475
    FG26
    467
    50
    059
    059
    10465
    01
    62
    17
    79
    FG27
    364
    50
    236
    046
    6546
    01
    1555
    11
    165


    续表
    序号
    流量m³h
    径mm
    长m
    ν
    ms
    R
    Pam
    ∑§
    △Py
    Pa
    △Pj
    Pa
    △P
    Pa
    FG28
    307
    40
    117
    065
    1751
    01
    206
    21
    227
    FG29
    276
    40
    189
    058
    14307
    01
    271
    17
    288
    FG30
    276
    40
    190
    058
    14307
    01
    272
    17
    289
    FG31
    225
    40
    113
    047
    9726
    01
    110
    11
    121
    FG32
    168
    32
    524
    049
    12594
    01
    660
    12
    672
    FG33
    132
    32
    3409
    038
    7964
    16
    2715
    116
    2831
    E17
    077
    25
    2168
    035
    9093
    62
    1971
    16378
    18349
    FH33
    132
    32
    3409
    038
    7964
    16
    2715
    116
    2831
    FH32
    168
    32
    524
    049
    12594
    01
    660
    12
    672
    FH31
    364
    40
    113
    047
    9726
    01
    110
    11
    121



    续表
    序号
    流量m³h
    径mm
    长m
    ν
    ms
    R
    Pam
    ∑§
    △Py
    Pa
    △Pj
    Pa
    △P
    Pa
    FH30
    276
    40
    190
    058
    14307
    01
    272
    17
    289
    FH29
    276
    40
    189
    058
    14307
    01
    271
    17
    288
    FH28
    307
    40
    117
    065
    1751
    01
    206
    21
    227
    FH27
    364
    50
    236
    046
    6546
    01
    155
    11
    165
    FH26
    467
    50
    059
    059
    10465
    01
    32
    17
    79
    FH25
    519
    50
    356
    065
    12748
    01
    454
    21
    475
    FH24
    609
    50
    016
    077
    17287
    01
    27
    29
    57
    FH23
    660
    50
    325
    083
    20177
    01
    655
    35
    690
    FH22
    711
    50
    128
    090
    23288
    01
    297
    40
    338
    FH21
    841
    65
    649
    064
    8989
    01
    583
    21
    604



    续表
    序号
    流量m³h
    径mm
    长m
    ν
    ms
    R
    Pam
    ∑§
    △Py
    Pa
    △Pj
    Pa
    △P
    Pa
    FH20
    954
    65
    1275
    073
    11415
    11
    14556
    293
    14848
    FH19
    989
    65
    298
    076
    12234
    01
    365
    29
    394
    FH18
    1024
    65
    316
    078
    13081
    01
    413
    31
    443
    FH17
    1060
    65
    378
    081
    13956
    01
    527
    33
    560
    FH16
    1095
    65
    368
    084
    14859
    01
    547
    35
    582
    FH15
    1130
    65
    112
    086
    1579
    01
    176
    37
    214
    FH14
    1181
    65
    2214
    090
    17193
    21
    3807
    857
    4664
    FH2
    132
    80
    601
    089
    13386
    01
    804
    40
    844
    FH1
    467
    80
    646
    092
    1415
    05
    914
    215
    1129



    7 水系统设备选型
    71制冷机组选型
    计算结果图综合制冷量1073448kw楼总需1074kw制冷量中购物厅空间需1014658kw制冷量选择离心压缩机WSC079LAQ35FE2209C2209
    该离心机组单台冷量10548kw满足需
    两层厅两层办公区域占总冷负荷5878kw选机组TESC30制冷量87kw满足需求
    两台机组设备参数表71表72中体现
    表71离心式冷水机组设备参数表
    离心式冷水机组
    型号
    WSC079LAQ35FE2209C2209
    制冷量
    kW
    10548
    制冷输出功率
    kW
    2048
    输出功率(配电)
    kW
    220
    电源
    380V 3N50Hz
    压缩机
    类型
    全封闭涡旋式柔性压缩机
    数量
    4
    启动方式
    直接启动
    制冷剂
    类型
    R410A
    控制
    电子膨胀阀
    水路系统
    水侧换热器
    高效壳式换热器
    水流量
    m³h
    2819
    阻力损失
    kPa
    85
    高水压
    MPa
    25
    接方式
    法兰连接
    进出水连接法兰
    DN300
    外形尺寸

    mm
    4200

    mm
    3250

    mm
    2500
    净重
    kg
    4216
    运行重量
    kg
    4598
    表71螺杆式冷水机组设备参数表
    螺杆式冷水机组
    型号
    TESC30
    制冷量
    kW
    87
    制冷输出功率
    kW
    21
    输出功率(配电)
    kW
    30
    电源
    380V 3N50Hz
    压缩机
    类型
    半封闭螺杆回转式压缩机
    数量
    2
    启动方式
    直接启动
    制冷剂
    类型
    R32
    控制
    电子膨胀阀
    水路系统
    水侧换热器
    高效壳式换热器
    水流量
    m³h
    236
    阻力损失
    kPa
    35
    高水压
    MPa
    1
    接方式
    法兰连接
    进出水连接法兰
    DN100
    外形尺寸

    mm
    2300

    mm
    750

    mm
    1300
    净重
    kg
    780
    运行重量
    kg
    860


    72冷冻水泵选择
    考虑种利素循环水泵流量常设计流量增加余量循环水泵扬程水头损失净扬程水流量流动程中产生局部阻力损失程阻力损失考虑克服阻力损失应该加储备量
    冷冻水泵扬程确定
    (式71)
    式中
    空调设备压力损失
    空调水系统总程阻力
    空调水系统总局部阻力
    冷冻水泵选型
    计算出冷冻水高工况扬程尚需分加20%安全系数(计算误差漏损等)
    (式72)
    式中
    冷冻水高工况扬程
    冷冻水系统利环路阻力
    水密度
    重力常数取
    取螺杆冷水机组阻力值80 千帕(8mH2O)路阻力值50千帕摩阻值200 Pam长供回水路长度值(单)2575m计算出磨擦阻力2575*20051500Pa515kPa磨擦阻力50设置长供回水路局部阻力值515kPa*052575kPa算出系统路总阻力值80 kPa+50 kPa+52 kPa+26kPa208 kPa(208m水柱)进算出扬程2496m选取IS125100315A该冷冻水泵扬程25m满足需求
    取离心压缩机冷水机组阻力值80 千帕(8mH2O)路阻力值50千帕取摩阻值200 Pam计算出磨擦阻力1825*20036500Pa365kPa长供回水路长度值(单)1825m磨擦阻力50设置长供回水路局部阻力值365kPa*051825kPa算出系统路总阻力值80 kPa+50 kPa+37 kPa+18kPa185kPa(185m水柱)进算出扬程222m选取三台IS200150315A该冷冻水泵扬程28m满足求
    冷冻水泵流量
    冷冻水泵流量取系统水流量倍计算结果
    螺杆机组冷冻水流量:
    离心机组冷冻水流量:

    选择
    冷冻水泵具体型号表72表73示
    表72 螺杆机组端选冷冻水泵性参数
    型号
    IS125100315A
    流量(m3h)
    扬程(m)
    转速(rmin)
    效率()
    汽蚀余量(m)
    出入口直径(mm)
    电机功率(kw)
    268
    285
    2800
    75
    25
    40
    15
    表73 离心机组端选冷冻水泵性参数

    型号
    IS200150315A
    流量(m3h)
    扬程(m)
    转速(rmin)
    效率()
    汽蚀余量(m)
    出入口直径(mm)
    电机功率(kw)
    1039
    28
    3200
    75
    25
    50
    45

    冷水泵流量确定:
    GQ*12(5℃*1163) (式73)
    式中: Q制冷机制冷量kw
    G冷水泵流量
    螺杆机组端冷水泵流量理台2064m³h离心机组冷水泵流量理台8467m³h
    冷水泵扬程确定:
    (式74)
    式中: 扬程(冷水泵)
    冷凝器阻力
    冷塔中水提升高度
    冷水路局部阻力
    冷水路总程阻力
    冷塔喷嘴喷雾压力约
    取摩阻200 Pam输配侧路长度34m假设输配侧局部阻力磨擦阻力50局部阻力34m*200Pam1000*15102kPa104mH2Ohm查7 mH2Ohs冷塔中水提升高度查2mH2Oho5 mH2OHp1504*111654 mH2O
    冷水泵具体型号表74表75示
    表74 螺杆机组端选冷水泵性参数
    型号
    IS125100250A
    流量(m3h)
    扬程(m)
    转速(rmin)
    效率()
    汽蚀余量(m)
    出入口直径(mm)
    电机功率(kw)
    260
    175
    2800
    75
    25
    40
    75
    表75 离心机组端选冷水泵性参数

    型号
    IS200150250A
    流量(m3h)
    扬程(m)
    转速(rmin)
    效率()
    汽蚀余量(m)
    出入口直径(mm)
    电机功率(kw)
    8720
    175
    3200
    75
    30
    40
    30

    73冷塔选型
    冷塔选型式731解决
    冷塔水量风量
    W3600QC(t1t2) (式75)
    G3600Qi1i2 (式76)
    式中: W水量(kgh)
    Q冷塔冷热量(kw)约制冷机组13倍左右
    G风量(kgh)
    t 1t 2室外空气进出口湿球温度
    i 1i 2 应饱空气焓值(kjkg)
    根计算w3600*1100*1342*5289714kgh290m³h选择冷塔BNC300水流量300m³h满足求
    G3600*1100*13(34082261)518228kgh518m³h满足求
    74膨胀水箱选择
    设计建筑面积24000㎡冷冻水供回水温度分7℃12℃采高位开式膨胀水箱进行定压补水水容量计算式
    Vck*s (式77)
    式中: Vc系统水容量m³
    k系数供冷工况空气—水系统取13
    s建筑面积㎡
    结果:Vc13*240001000312m³
    系统补水量计算:
    系统时补水量Q(补水)系统水量Vc2计算系统补水量Q(补水): Q(补水)2*Vc002*312062m³h (式78)
    补水泵流量计算:
    补水泵时流量Q(补水泵)系统水量Vc510计算补水泵流量Q(补水泵): Q(补水泵)5*Vc005*312156 m³h (式79)
    水箱调节水量Q(水箱调节)计算:
    Q(水箱调节)般时运行3分钟补水量Q(补水泵)Q(水箱调节):
    Q(水箱调节)360* Q泵360*1560078 m³h (式710)
    膨胀水量Q膨计算:
    供回水温度712℃时(1ρ0ρm)000558膨胀水箱Q膨:
    Q膨 Vc*(1ρ0ρm)312*00055801741m³h (式711)
    式中: Q膨水箱膨胀水量m³h
    Vc冷系统水容量m³
    ρ0夏季冷系统停止运行环境温度(35℃)应水密度作水起始密度kgm³
    ρr设计温度回水密度kgm³
    ρs设计温度供水密度kgm³
    ρm系统运行时冷水均密度ρsρr均值计算kgm³
    计算膨胀水箱效容积:V效(水箱)1*(Q调+Q膨)1*(0078+01741)02521 m³
    水箱选型:通公式膨胀水箱效容积计算出国标图集05K210选择方形膨胀水箱尺寸900mmx900mmx900mm(长x宽x高)溢流径规格排水径规格膨胀径规格分DN50DN32DN40膨胀水箱重量200kg
    75补水泵选择
    补水泵时流量系统水流量5更合适超10
    负责螺杆机组补水泵流量:
    G264*5132m³h
    负责离心机组补水泵流量:
    G3102*51551m³h
    76水系统附件选择
    1分水器径计算
    左侧空调机组立冷负荷QL1231kW
    (860*1231)1000*523173 m³h ( 式712) 道直径
    √(4*231733600)π*2 0203m取标准径DN200(式713)
    中部风机盘立冷负荷QL10kW
    (860*10)1000*5172 m³h
    道直径
    √(4*1723600)π*2 005m取标准径DN50
    计算知总干径DN250
    2分水器长度计算
    工程实践中选取径般径23号取D值400mm
    计算出进水径(d1)尺寸250mm出水径(d2)尺寸50mm出水径(d3)尺寸200mm备径(d4)尺寸200mm旁通径(d5)尺寸80mm排水径(d0)尺寸80mm

    图71 分水器配图
    分水器长度:
    L040+80+125245mm
    L1125+120+25270mm
    L225+120+100245mm
    L3100+120+100320mm
    L4100+120+40260mm
    L540+80+40160mm
    LL0+L1+L2+L3+L4+L5245+270+245+320+260+1601500mm
    3集水器设计
    集水器筒体直径分水器相取D400

    图72 集水器配图
    d1(进水径)250mmd2(出水径)50mmd3(出水径)200mmd4(备径)200mmd5(旁通径)80mmd0(排水径)80mm

    集水器长度
    LL0+L1+L2+L3+L4+L5245+270+245+320+260+1601500mm






    8总结
    现已完成广州某型商场空调工艺设计设计中冷负荷指标均符合国家关规定
    次设计流程:离心螺杆冷水机组制冷水泵冷冻水供送风机盘组合式空调箱中房间送风方式分两种:种空调箱外界抽取新风混合回风中室回风然新风回风混合室送风种风机盘室进行回风送风新风室外新风机提供通新风屋补充新风处理冷冻水变成冷水着回水流回冷水机组形成循环冷水机组冷水塔间循环压缩冷剂产生热量供水中水带走流入冷水塔中外界空气进行热交换进入回水流回冷水机组
    次商场空调设计具优点:(1)节约电通两种空调系统商场营业区域供冷区域分供冷时段进行差异化供冷节约耗电费(2)售货区域采全空气系统单独设置输水道会出现事年限期产生漏水安全隐患空气水系统必机组滤器进行清扫必考虑清洁维修问题
    次设计身力水设计时间限设备法获具体核心数参数网络查找该设计某区域涉方面专业知识领域法更加深刻认知解例次设计节设计环节方面通方案综合选择层面减少耗商场进行耗分析更加直观具体列出节约耗量需扩展知识面学解更更合理解决问题方式掌握新科技技术发展信息深入行业进行更加广泛认知实践型商场空调设计发展做出份力量
    参考文献
    [1] 潘文彦 西安型商场建筑空调耗调查节分析[C] 中国城市科学研究会中国建筑节协会中国城科会绿色建筑节专业委员会城市发展研究——第7届国际绿色建筑建筑节会文集中国城市科学研究会中国建筑节协会中国城科会绿色建筑节专业委员会中国城市科学研究会2011343347
    [2] 金玮涛刘婷婷哈尔滨某型商场暖通空调系统设计[J]低温建筑技术201840(08)1316
    [3]黄华明 珠三角商场中庭夏季热舒适性优化研究[D]广州学2018
    [4] Benzotriazole removal mechanisms in pilotscale constructed wetlands treating cooling tower water[J] Thomas V WagnerJohn R ParsonsHuub HM RijnaartsPim de VoogtAlette AM Langenhoff  Journal of Hazardous Materials
    [5] Capacity enhancement of air conditioning systems by direct integration of a latent heat storage unit[J] T KorthF LoistlA StorchR SchexA KrönauerC Schweigler  Applied Thermal Engineering
    [6] 某商业广场冰蓄冷系统应[J] 奚宽鲁周伟制冷 2017(04)
    [7] 杨胡雪钦商场空调新风冷负荷特点新风节利空气品质改善系统优化设计探讨[J]建筑技术开发201340(01)5557
    [8] 李会 广东商场建筑空调系统节设计研究[D]广州学2014
    [9] 刘美州 广东商场建筑空调系统节运行耗分析[D]广州学2016
    [10]刘成义商场中央空调系统设计[J]科技创业家2013(02)183
















    附 录
    附录Ⅰ

    附录1 图1层空调设计图纸



    附录1 图2二层空调设计图纸




    附录Ⅱ 外文翻译
    外文资料
    Energy Efficient and Effective Control Strategy of HVAC System in Large Shopping Complex
    Abstract— HVAC systems control the temperature humidity and air circulation in shopping malls In these systems generally there is one main controlling unit as the Ventilation and Airconditioning units are centralized HVAC system consumes bulk amount of energy and idle consumption in a centralized system is always greater than the distributed system where each and every unit could be controlled separately In present scenario the HVAC systems installed in large shopping mall could not provide sufficient amount of oxygen and fresh air and failed to maintain the desired temperature across the various zones where crowd is more than the normal For example a feeling of suffocation and more humidity are felt predominantly at the overcrowded locations like at the front of the payment counter or at the POS where large discount has been announced In this paper the problem is identified and a suitable control system has been suggested to cater a better comfort and control over entire zone with reduced consumption of energy In this proposed scheme the control system dynamically adjusts to the changing Building environment and load (number of Occupants and Sources of heat like lighting load Electronic gadgets Electronic Displays computers kitchen etc) An automatic and effective Energy saving scheme has also been proposed without compromising with the comfort level of the occupants
    Keywords—HVAC VFDFan Servomotor Adaptive control Energy Saving WSN
    I INTRODUCTION
    In recent times there is a growth in number of shopping complexes across the Globe in more or less every country As these complexes are of huge area and closed in nature the ambience or atmosphere climatic conditions like temperature humidity and air circulation are controlled by a system called HVAC Usually there is one main controlling unit for those purposes as the Ventilation and Air conditioning units are centralized The systems are designed for a certain maximum number of customers (partial load) a prefixed controlled temperature and humidity which are to be maintained inside the complex HVAC systems consumes bulk amount of energy Optimal control strategy was developed in [1] It’s a known fact that idle consumption in a centralized system is always greater than the distributed system where each and every unit could be controlled separately In present HVAC systems installed in large shopping mall are unable to provide sufficient amount of oxygen and fresh air and thus fail to maintain the desired temperature across various zones such as where crowd is more than the normal For example a feeling of suffocation and more humidity are felt predominantly at the overcrowded locations like at the front of the payment counter or at the POS where large discount has been announced Also if there is a sudden increase in concentration of number of occupants in some placeszones are much higher than other zones the present HVAC systems could not provide sufficient comfortable ambience to the occupants in spite of high energy usage in a tropical country like India In addition to it the concentration of shoppers varies from zone to zone due to several socio economic and cultural factors their personal choices etc The over concentration of occupants over a specific zone creates a barrier to the normal flow of air across the floor The differential air pressure is not enough strong to overcome the barrier to sustain a homogeneous ambience (ie equal temperature humidity air flow nearly same across the floor) The effect is a zonal heating due to stagnant air in the middle of human barricades which acts like walls and restricts normal air passage within the environment As a result there is shortage of oxygensupply of air to that zone due to blockades moreover there is emission of excess CO2 as compared to lightly populated areas Moreover humidity also changes at that zone due to cumulative positive feedback from sweating of occupants in overpopulated zones As a sweating person sweats more in more humid conditions this phenomenon occasionally observed at the time of seasonal sales especially in front of the POS for discounted sale and a long queue in front of payment counters
    Firstly the problem is identified and a suitable control system has been suggested to cater a better comfort and control over entire zone with reduced consumption of energy In this proposed solution to the above mentioned problem the control system dynamically adjusts to the changing Building environment and load (such as number of Occupants Sources of heat like lighting loadElectronic gadgets Electronic Displays computers kitchen etc) The present paper introduces a scheme where the environment will be controlled as per the optimum needs with decentralized atmosphericambience control along with the existing one with the deployment of sensor network various sensors actuators while keeping the overall power consumption within the current maximum limit with an average saving of energy
    IINAVIER STOKES EQUATION
    The NavierStokes equations for describing the conservation of momentum and mass for incompressible airflow are given below (1) and (2) [2]
    (1)
    (2)
    Where g is the gravity vector ρg is the pressure gradient μ the dynamic viscosity Assuming a steadystate airflow to reduce complexity ofanalysis ∂V∂t0
    (3)
    where ρcpκ denote respectively the density specific heat and thermal conductivity of air and h is the heat generated removed
    The boundary condition applied for (1) and (2)
    (4)
    Where n is the unit outward normal vector at a point on the space domain boundary Vb is assumed to be zero at static boundaries whereas it is nonzero at nonstatic ones The non zero value of Vb can be obtained from sensors
    Again the flow of heat in the direction normal to the boundary is specified by
    (5)
    where q results from the power of the heating or cooling sources at the boundaries and a is a coefficient

    118

    117

    117
    IIIPROPOSED SOLUTION TO STATED PROBLEM
    The present plan divides the overall area of a floor plan in to several smaller areas it does not matter whether the divided zones are physically partitioned or without partition (logical) The whole area is divided into several smaller areas of 400 Sq ft of (20ft X 20 ft dimension) each and their ambience is controlled separately and thus the atmosphere of the whole area is being controlled each section will have its full temperature oxygen humidity sensing set of elements Moreover PIR sensors are also used to monitor occupancy inside each controlled zone Dedicated actuator like VFD (Variable Frequency drive) controlled fan and Regulated Vent (Damper – PWM Servo controlled) will also be present The speed of the fan is directly controllable so also the opening of the inlet (Damper) through PWM controlled servo mechanism Instead of some sensors array of sensors or cluster of sensor could be thought of to symmetrically monitor the average parameter quite efficiently An aggregate of all the sensors within a zone could be reported to the corresponding cluster head to transmit the data to the zonal controller unit which will activate the corresponding actuators like Fan and Ventopening (Damper) to adjust the climate to the nearest set point so that the air flow of that particular zone could be adjusted (increased or decreased) to maintain that particular temperature oxygen level and humidity within the specified limit of comfortHere the air is thought to be an incompressible fluid as stated in (1) to (5) as the pressureinside the ducts is supposed to be maintained at a constant level so if the area of the opening for the air flow is increased there will be more air flow from that outlet provided the pressure within the duct is maintained at constant level from the main pump or by other means As we are interested to save energy it will be our first priority to optimize the flow of air to the vacant area of the floor by adjusting the airflow mostly towards the area of dense population or heat This will be done by guiding the air supplied from main pump (Fan) to a particular direction or reducing its flow as per the requirement The hotter area needs more airflow where as an unattended area does not require full air flow through outlet but a minimum of that just to maintain the ambience over thereSowe are simply proposing the utilization of the available resources by relocation of it through intelligent system Fig 1 shows a normal HVAC system whereas Fig 2 shows zonal damper to control the Air flow to a particular zone

    Fig1 A common HVAC system




    Fig 2 Zonal Damper to control the Air flow to a particular zone
    Functionality In this present scheme an array of sensors are deployed and divides the area (whole floor plan logically without any sort of physical partition in between) Each area will have distributed sensors which will sense humidity temperature and oxygen level of that specific area and the number of occupants through PIR sensors The Temperature sensor will continuously monitor the local (zonal) temperature the humidity sensor and Oxygen sensor work as usual Whenever there is shift from the reference points in terms of Temperature Humidity and O2 level the system changes the rate of airflow through damper allocated for that particular zones dynamically and if more chilling is required it will send signal to the respective actuators As the chilling plant is centralized it will work on weighted average or aggregated signal coming from various zones Each zone has its own VFD controlled fan which is put to action to enhance the air flow the speed of the fan will be controlled according to the need or load of the specific zone to maintain the reference set point as nearly as possible The airflow rate will be controlled by the adjustment of damper as well as dedicated fans inside the ducts whose speed will be regulated accordingly to maintain the desired airflow as to maintain the reference ambient conditions Only limiting factor is the pressure inside the duct which has to be maintained within a limit
    IVCONTROL STRATEGY
    The adaptive control strategy will control the fan speed by sending control signals to VFD drive of individual fans the vent opening could also be controlled linearly with PWM controlled servo mechanism The humidity sensor actuates the humidity locally to achieve the set point However the condenser or chiller unit’s load will be hardly increased as the present scheme optimizes more on redirecting the flow of air towards the area of discomfort by resource allocation Though in case of severe need the condenser and chiller temperature controller could also be required or may be utilized As the open space is divided into several smaller places adjacent zones are also being affected to some extent However the reverse of the same that the distribution of atmospheric parameters are not homogeneous through the area of consideration has been described earlier and concept of local controlling concept has been adapted to cope up the issue
    The PIR sensors determine the density of occupants and send signal to the intelligent controller for controlling the ambience PIR sensors are mainly used here for observing occupancy thus for unattended shop floors it tries to put the other energy consuming sources like light to an idle mode (Low power mode or dimming mode) however for HVAC control scheme PIR sensor can put the fans and Compressors to idle mode also when the floors are mostly vacant Thus it can save a lot of energy which could have been misused otherwise
    Sensors or cluster of sensors may be used with their aggregated output which will be representation of the measured physical parameters The sensors used here need not to be wireless but they are powered through conventional power but they may be networked or clustered through wireless (WSN) so they could easily form an intelligent WSN (Wireless Sensor Network) with LEACH TEEN or APTEEN like protocol of clustering the sensors The sensors close to each other by their output value may form a cluster and thus they can constitute a zone of symmetrical ambience Fuzzy Rule based adaptive logic may also be applied to bring out the optimum result out of those signals If we think of area a small as 400SQ ft as unit controlled area with 20X20 ft of dimension each then the clusters with nearest matched squares will be included as divided area or different ambient zones The control will be more efficient then over entire floor The actuators dedicated for those zones will work accordingly However the overall system performance could be studied separately The optimum performance of the system needs proper calibration and tuning of the entire system
    Data Connectivity The data from zonal sensor comes to zonal controller after necessary signal processing the zonal controller then controls the local Fans and Vents accordingly It also sends the signals to the main controller the main controller decides to change the load of centralized system (Chiller Main Fan unit Heater etc) on various rules as it is learned upon Moreover the Data is also sent to internet server via low range wireless communication like Zigbee or Wifi to the internet server The main controller is high end FPGA based controller which could be configured with as any advanced control strategy The system is connected to the internet server and thus it could be monitored controlled from remote console The Data logging is very much essential to log seasonal data customer’s behavior and other climatic conditions system failure etc It also helps various analyses over power consumption energy management peak load system performance and load forecasting etc The complete scheme of the proposed HVAC system is shown in Fig 3

    Fig3 Control block diagram for proposed scheme

    VENERGY SAVING IN PROPOSED SCHEME
    The area in need will be of importance and treated individually it is very much unlikely that entire shopping mall area would be overcrowded by 200 to 300 it is been observed that population distribution is very much localized and due to that shift from designed ambient conditions is very much happened as at the time of designing the floor the number of shoppers were estimated to a certain value If there is an increase in that population the ambient condition will change due to human body temperature and breathing and humidity changes due to breathing and sweating
    The population will be taken care of by some zonal PIR sensors which will not only sense the human body temperature but occupancy at the same time In this way the present sensing system can send information to the system controller about the densely populated area is relatively vacant and the ambient conditioning will be done area wise or zone wise according to that sensed signal The flow of air may be optimized for a relatively less populated area but the minimum offset should be there to cater to the usual need Thus we can reduce the load f the main air handling unit (Fan) On the other hand zonal fan speed could be increased for a densely populated area chilling also be required more for the same but the vent or damper for a vacant area could be minimized accordingly and the flow of air could be redirected to that comparatively hotter and suffocating zone So keeping the total capacity of the air handling unit same if the direction of air or velocity towards a specific area could be changed by regulating the fan speed and opening of the Damper vent within a limit the ambient and feelings of comfort could be well adjusted As the unattended area are not requiring too much air by adjusting the damper the air pressure inside the duct could be kept same at the same time as it will require lesser volume of air compared to hotter zone the power requirement for the fan and the overall energy requirement for maintaining the ambient at par will be less for those areas Thus clustering the covered area in to various smaller areas not only increases the comfort level but also does a lot of energy savings
    The proposed scheme is also suitable for any office residential house (Smart Home) hotel exhibition complex Heating and Air conditioning both consume a lot of energy optimizing its usage will save lot energy without compromising the comfort level of occupants
    VICONCLUSION AND FUTURE SCOPE
    As the resource of energy is going to be crucial day by day so energy efficient design aiming towards energy saving is also of prime importance Besides this the concept of intelligent home with automatic climate control has come into play for optimum comfort of occupants with minimum wastage of energy
    Future work may be carried out for selecting optimum sensor network (WSN) networked sensor for sensing physical parameter more accurately to represent the real system and necessary feedback for control The work may also be continued for finding optimum control methodology for the whole system Data must be collected from a real model with described sensors controller actuator and heat exchangers Fan etc to learn the actual behavior and subsequent modeling of similar kind of systems From these data actual energy saving seasonal behavior etc could be found out However software simulation can be attempted having the knowledge of various parameters to predict the performance of such a system Further some work must be done in the area of developing the design of mechanical designs minimizing heat loss and design of motorized PWM controlled vent whose behavior should be linear as desired
    So there are so many avenues for further work including the data security and communication protocol for centralized control system and remote access so that the control parameters should not be changed by unauthorized person or by accident It is being concluded that proper implementation of this concept would be beneficial to number of HVAC systems across the globe and will save a lot of energy which could have been wasted otherwise It will increase the carbon credit and definitely a step towards sustainable development for making a Green world without compromising human comfort
    译文
    型商场暖通空调系统节高效控制策略
    摘暖通空调系统控制商场温度湿度空气流通系统中通常控制单元通风空调单元集中暖通空调系统消耗量源集中系统中空闲消耗总分布式系统分布式系统中单元单独控制目前情况安装型购物中心暖通空调系统提供足够氧气新鲜空气法群较正常区域维持需温度例满患方付款柜台前已宣布幅折扣POS机会感觉窒息感更潮湿感觉文指出问题提出合适控制系统满足更舒适性整区域控制降低耗该方案中控制系统根断变化建筑环境负荷(居住数热源明负荷电子设备电子显示器计算机厨房等)进行动态调整影响居住者舒适度前提提出种动效节方案
    关键词:暖通空调变频风机伺服电机适应控制节线传感器网络
    导言
    段时间国家全球购物中心数量增长建筑群面积巨性质封闭环境气气候条件(温度湿度空气循环)称暖通空调系统控制通常控制单元目通风空调单元集中系统定数量户(部分负载)设计预先控制温度湿度保持综合设施暖通空调系统消耗量源F 尼尔森暖通空调系统中佳设定点综合中提出优控制策略众周知集中式系统空闲消耗总分布式系统分布式系统中单元单独控制目前安装型购物中心暖通空调系统法提供足够氧气新鲜空气法群超正常水区域等区域保持需温度例满患方付款柜台前已宣布幅折扣POS机会感觉窒息感更潮湿感觉外果某方区域居住者数突然增加区域高印度样热带国家源量高现暖通空调系统法居住者提供足够舒适环境外社会济文化素选择等购物者集中程度区域异特定区域居住者度集中板正常气流造成障碍压差足克服障碍维持均匀环境(温度湿度板气流相)种效应墙中间空气停滞产生区域性加热作类似墙壁限制环境中正常空气通道封锁该区域氧气空气供应足外口较少区相量二氧化碳排放外口剩区居民出汗产生累积正反馈该区域湿度会发生变化出汗较潮湿环境出汗较种现象季节性销售时偶尔会出现特POS机前折销售付款柜台前排起长队
    首先该问题进行分析提出合适控制系统达更舒适性整区域控制时降低耗述问题解决方案中控制系统动态适应断变化建筑环境负荷(居住数明负荷等热源电子设备电子显示器计算机厨房等)文介绍种现气环境分散控制方案基础通部署传感器网络种传感器执行器时总功耗控制前限度均节省源环境达优控制求方案量
    二NAVIERSTOKES方程
    描述压缩气流动量质量守恒NavierStokes方程(式1)(式2) (式1)
    (式2)
    式中g重力矢量ρg压力梯度μ动态粘度假设稳定气流降低分析复杂度∂V∂t0


    (式3)
    式中ρcpk分表示空气密度热导热系数h表示排出热量
    适(1)(2)边界条件
    (式4)
    中n空间域边界某点处单位外法量Vb静态边界处假定零非静态边界处非零Vb非零值传感器中样垂直边界方热流
    (式 5)
    式中q边界处加热冷源功率产生a系数
    三 提出问题解决方案
    面图楼层面总面积划分较区域划分区域物理分区分区(逻辑分区)重整区域分成较区域区域400方英尺(20英尺X 20英尺尺寸)环境单独控制整区域气控制区域完整温度氧气湿度传感元件外PIR传感器监控控制区域占情况专执行机构VFD(变频驱动)控制风扇调节通风口(减振器–PWM伺服控制)出现风机转速直接控进口(风门)开度通PWM控制伺服机构实现代某传感器传感器阵列传感器簇认非常效称监测均参数区域传感器集合报告相应簇头数传输区域控制器单元区域控制器单元激活相应执行器风扇通风口(阻尼器)气候调整设定点该特定区域空气流量调节(增加减少)该特定温度氧气水湿度保持规定舒适度范围里空气认(1)(5)述压缩流体道压力应保持恒定水果空气流量开口面积增加会更空气该出口流出前提道压力保持泵方式恒定水兴趣节约源首务通调整气流气流流口稠密区热量密集区优化流板空置区气流通引导泵(风扇)供应空气特定方根求减少流量实现较热区域需更气流值守区域需通出口全部气流需保持出口低气流建议通智系统重新配置利资源图1示出正常暖通空调系统图2示出区域阻尼器控制流特定区域气流


    图1 普通空调系统

    图2 区域阻尼器控制流特定区域气流
    功:方案中传感器阵列部署划分区域(逻辑整楼层面间没物理分区)区域分布式传感器通PIR传感器感知特定区域湿度温度氧气水居住数温度传感器持续监测(区域)温度湿度传感器氧传感器常工作温度湿度氧气水偏离参考点时系统动态改变通特定区域分配风门气流速度果需更冷相应执行器发送信号冷冻设备集中时根区域加权均聚合信号工作区域VFD控制风机该风机启动提高空气流量风机速度根特定区域需负荷进行控制保持参考设定值气流速度通调节风门道专风机控制风机速度相应调节保持需气流保持参考环境条件唯限制素道压力必须保持限制范围
    四 控制策略
    适应控制策略通单风机VFD驱动器发送控制信号控制风机转速通PWM控制伺服机构通风口开度进行线性控制湿度传感器启动湿度达设定值然方案通资源分配气流转舒适区域方面进行更优化冷凝器冷水机组负荷难增加然严重需情况冷凝器冷器温度控制器需空分割成较区域相邻区域受定程度影响然相反气参数分布均匀问题通考虑区域已前面进行描述采局部控制概念解决问题 PIR传感器决定居住者密度智控制器发送控制环境信号PIR传感器观察居住情况车间试图耗源(灯光)置空闲模式(低功率模式调光模式)然暖通空调控制方案PIR传感器风扇压缩机楼层部分空闲时处空闲状态节省量源否会滥传感器传感器集群聚合输出起表示测量物理参数里传感器需线通常规电源供电通线(WSN)联网集群容易形成智WSN(线传感器网络)具LEACHTEENAPTEEN类传感器集群协议传感器通输出值相互形成簇构成称环境区域基模糊规适应逻辑信号中出佳结果果面积400方英尺区域视单位控制区域区域尺寸20X20英尺具匹配正方形簇包括分割区域环境区域种控制整楼层更效专区域执行器相应工作然系统整体性单独研究系统佳性需整系统进行适校准调谐数连通性:区域传感器采集数必信号处理进入区域控制器区域控制器局部风机通风口进行相应控制信号发送控制器控制器决定根学种规改变集中系统(冷水机组风机机组加热器等)负荷外数通诸ZigbeeWifi类低距离线通信发送特网服务器控制器基高端FPGA控制器配置先进控制策略系统连接internet服务器通远程控制台进行监视控制数记录记录季节数客户行气候条件系统障等非常重助电力消耗源理峰值负荷系统性负荷预测等进行种分析拟议暖通空调系统完整方案图3示

    图3 拟定方案控制框图
    五 节方案
    需区域重单独处理整购物中心区域太度拥挤200300观察口分布非常局部种变化设计环境条件非常发生设计板时购物者数量估计定价值果口增加环境条件体温度呼吸改变湿度呼吸出汗改变口区域性PIR传感器顾传感器仅感知体温度时感知居住情况样传感系统系统控制器发送关口稠密区域相空闲信息环境调节根该传感信号区域区域进行空气流量针口相较少区域进行优化偏移量应满足通常需样减少空气处理机组(风机)负荷方面口稠密区提高区域风扇速度样需更冷空置区相应减少通风孔风门气流重新引导相较热窒息区保持空气处理机组总容量变果通调节风扇转速定限度开风门通风口改变特定区域空气方速度调节环境舒适感值守区域需太空气通调节风门道空气压力时保持变较热区域相需较少空气量区域风机功率求保持环境标准总量求较低覆盖区域聚集较区域仅提高舒适度节省量源该方案适办公住宅(智家居)酒店展览综合体暖气空调消耗量源优化节省量源时影响居住者舒适度
    六 结未范围
    着源日益紧张节目标节设计显尤重外智家居概念动气候控制已发挥作佳舒适居住者源浪费
    更准确感知物理参数选择佳传感器网络(WSN)网络化传感器反映实际系统必控制反馈进行步工作项工作继续寻找整系统佳控制方法数必须真实模型中收集包括描述传感器控制器执行器热交换器风扇等解类似类型系统实际行建模数中出实际节情况季节性行等然软件模拟尝试具种参数知识预测样系统性外开发机械设计化热损失设计电动PWM控制通风口(性应需线性)方面必须做工作
    集中控制系统远程访问数安全通信协议等方面需进步研究问题控制参数应未授权意外改变结正确实施概念助全球暖通空调系统数量节省量原浪费源增加碳信疑着持续发展迈出步损害类舒适度前提创造绿色世界
    文档香网(httpswwwxiangdangnet)户传

    《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
    该内容是文档的文本内容,更好的格式请下载文档

    下载文档到电脑,查找使用更方便

    文档的实际排版效果,会与网站的显示效果略有不同!!

    需要 49 香币 [ 分享文档获得香币 ]

    下载文档

    相关文档

    某建筑物空调系统设计毕业设计

    本科生毕业设计 姓 名: 学 号: 学 院: 专 业: 热能与动力...

    5年前   
    1361    0

    **市某商务中心空调系统设计

    本设计为**市某商务中心的空调以及通风和防排烟系统,目的是营造人体感觉舒适的室内环境。设计内容包括:空调冷热负荷的计算;空调系统的划分与系统方案的确定;空调末端处理设备的选型;风系统的设计、布置...

    5年前   
    1631    0

    空调系统设计资料总结

    中央空调主要参考以下的规范及标准:

    5年前   
    1865    0

    某空调营销管理系统项目方案书

     某空调营销管理信息系统 项 目 方 案 书 北京××软件股份有限公司 目 录 1. 前言 3 2. 公司简介 5 2.1. 综合实力 ...

    7年前   
    26996    0

    南京某高校暖通空调毕业设计

    目录 前 言... 1 第一章 工程概述与设计依据 2 1.1 工程概述 2 1.2 设计依据 2 1.2.1 围护结构热工指标 2 1.2.2 室外设计参数 2 1.2.3 室...

    5年前   
    1322    0

    基于单片机的空调温度控制系统设计毕业设计

     毕业设计  题 目 基于单片机的空调温度控制系统设计 学生姓名 学 号 学 院 计算机与信息工程系 专业班级 指导...

    5年前   
    2552    0

    通风与空调系统调试方案

    通风与空调系统测定与调试方案XX工程公司年月日目录一、编制依据二、项目质量管理目标三、工程概况四、施工部署五、作业条件及施工部署六、空调水系统调试七、空调风系统调试八、联合调试九、成品保护十、...

    1年前   
    284    0

    空调系统规范书

      **华电**热电厂二期                 工程           空调控制系统技术规范书                       ...

    5年前   
    1123    0

    某工厂供配电系统设计毕业设计

    工厂供电,是指工厂所需的电能的供应与分配,也称工厂配电。众所周知,电能是现代工业生产的主要能源和动力。电能既能易于由其他形式的能量转换而来,而易于转换为其他形式的能量以供应用。电能的输送和分配既...

    4年前   
    1588    0

    某会所空调系统复合玻纤风管施工技术

    ****会所空调系统复合玻纤风管施工技术1、 概述随着人们生活水平的提高,越来越的人关注室内空气品质、噪音及节能等方面的问题。这就对空调系统提出了更高的要求,新型材料玻纤复合风管应运而生,许多...

    1年前   
    262    0

    美的空调销售-空调设计

     云杉郡家用海信家用中央空调销售方案制定  摘要 改革开放以来,国内经济取得了较大发展,建筑供冷、供暖已成为一种普遍需求。未来几年,中国中央空调行业仍将保持发展势头。中央空调技术的发...

    1年前   
    351    0

    某医院暖通空调工程施工组织设计

    某医院暖通空调工程施工组织设计第一章工程概况 第二章编制依据 第三章主要施工组织设计 第四章质量保证措施 第五章安全保证措施第一章 工程概况1.1 总体概况 项 目内 ...

    1年前   
    259    0

    中央空调系统维保方案

    XX园物业服务处办公楼 一、 编制依据 1、长庆物业服务办公楼的实际情况(图纸); 2、依据卫生部[2006]53号《公共场所集中空调通风系统卫生管理办法》; 3、依据2006处3月1...

    5年前   
    1828    0

    高大洁净厂房分层空调系统的设计_冯宝岳

    高大洁净厂房分层空调系统的设计_冯宝岳高大洁净厂房分层空调系统的设计总装备部工程设计研究总院 冯宝岳☆ 陈之曰 郝 军 满孝新提要 分析了高大洁净厂房的发尘特点和应采取的气流组织方式,通过工程...

    3年前   
    521    0

    空调机房系统设计及水(地)源热泵机组采购合同

    空调机房系统设计及水(地)源热泵机组采购合同  发包方:                               (以下简称甲方) 承包方:                      ...

    11年前   
    10292    0

    某中学的排课管理系统课程设计报告

    学号《某中学的排课管理系统》课程设计报告题目:某中学的排课管理系统专业:网络工程班级:姓名:指导教师:成绩:计算机学院2017年X月X日目录一、 设计内容及要求 21.1研究的目的和意义 21...

    1年前   
    288    0

    某企业考核系统的设计与实现

    信息化社会,管理信息系统成为企业管理必不可少的部分,企业考核系统已成为企业员工管理的一项重要内容。

    3年前   
    493    0

    通风空调设计与施工说明

      1  设计概况 1.1  本施工图设计是根据已批准的初步设计及审批意见和建设单位提供的有关资料进行的。 1.2    本建筑物总建筑面积89459m2,地上32层,地下1层,建筑物总...

    12年前   
    12863    0

    客厅空调智能开关设计

    客厅空调智能开关设计 客厅空调智能开关设计摘 要本设计利用红外遥感发送/接收器建立两个单片机之间的通信桥梁,主机模拟遥控,从机模拟空调系统。整个系统利用红外编码进行无线操控空调,实时利...

    2年前   
    466    0

    空调设计个人工作总结

    空调设计个人工作总结     转眼间离开大学校园已有3个多年头,这期间我经历了很多人生当中的第一次,第一次参加招聘会,第一次面试,第一次坐在电脑前做上班族,诸如此类,期间有失意,有欢笑,有...

    12年前   
    12941    0

    文档贡献者

    平***苏

    贡献于2021-09-02

    下载需要 49 香币 [香币充值 ]
    亲,您也可以通过 分享原创文档 来获得香币奖励!
    下载文档

    该用户的其他文档