甲方名称: 乙方名称:
址: 址:
根中华民国合法规定合双方乙方甲方提供次性中心机房设备搬迁服务事宜协商达成致确立合明确双方责权利义务确保合双方执行
moving services agreement
this moving services agreement (the agreement) is entered into as of the日期 day of 月份 2006 between 甲方名称 with its principal place of business at 甲方址 (hereinafter referred to as the shipper") and 乙方名称 with its principal place of business at 乙方址(hereinafter referred to as thecarrier)
recitals
the shipper wishes to have its equipment in the central terminal moved from the current address to 新址and the carrier is in the business of moving services and assures the shipper that it has the facilities personnel and technical expertise necessary to carry out the single fullservice move in consideration of the mutual promises covenants and agreements contained herein both the parties reach the agreement as follows subject to the contract laws of people's republic of china hence the responsibilities rights and obligations of each party are specified with the view to ensuring that both parties will honorably put the agreement into execution
[免责条例]
(1)针甲方需搬迁设备乙方负责硬件设备搬迁负责数软件安全
(2)搬迁设备乙方果需设备进行拆装拆装引起保修问题甲方负责
exemptions
1 in performing the services stipulated in the agreement the carrier shall be responsible for moving the shipper's hardware only but shall not in any way be held liable for the safety or intactness of the database and software concerned
2 also the carrier shall uninstall and install the equipment (as defined below) but any problem arising thereof in connection with maintenace and repair of the equipment shall be handled by the shipper only
[服务费]
台式机 1 套 rmb50元
服务器 1 台 rmb450元
机柜 1 台 rmb450元
型机 1 台 rmb450元
磁盘阵列柜 1 台 rmb450元
ups机 1 台 rmb350元
ups电池 1 块 rmb30元
监控器 1 台 rmb200元
交换机 1 台 rmb350元
运输车辆 1 天 rmb950元(包含司机油费停车费保险)
设备 协商报价
service fees
item quantity service fee per unit
platform machine one set rmb50
server one set rmb450
cabinet one rmb450
small machine one set rmb450
disc array cabinet one rmb450
ups main frame one set rmb350
ups battery one rmb30
monitor one rmb200
switch board one set rmb350
vehicle transportation including the driver fuel parking charge and
insurance rmb950 per day
other equipment na to be negotiated and quoted
甲乙双方搬迁完三工作日:乙方根搬迁验机单统计次搬迁设备产生费费清单书面形式交付甲方甲方核实误签字确认费清单原件甲乙双方持份(费清单见附件b)
注:合产生搬迁设备数量法搬迁前确认统计具体费费清单准
within three days after the services agreed on are completed the carrier is to add up the total cost of the services on the basis of the delivery receipt duly signed by the shipper and then present the detailed bill in writing to the shipper after verifying the bill the shipper shall sign on it after that each party shall be given one copy of the signed bill (see attachment b)
note since the workload involved with the agreement cannot be precisely estimated before the move the actual expenses shall depend on nothing other than the final detailed bill
[甲方搬迁前准备 ]
1做数备份确保数安全
2选择条运输线路图 提前五日提供乙方
3检测新机房温度湿度电源环境(注线必须接)达设备求
4提前办理搬迁需出入门相关手续便搬迁利
5甲方提供位协调员乙方协调员配合工作
6新机房设备摆放图提前五天供乙方
7新工作环境现工作环境提供间作设备周转途工作场
preparations on the part of the shipper
the shipper shall make the preparations set forth below
1 reproduce all the digital files in adequate numbers of copies to make certain that the database is in secure condition
2 select more than one transportation route and provide it for the carrier at least five days prior to the move
3 inspect and measure the temperature humidity and power supply (with ground connection properly made) in the new terminal to ensure that they are up to the requirements
4 secure all the entrance and exit permits and go through all the necessary procedures in advance to facilitate the move
5 designate a coordinator to work with the counterpart appointed by the carrier
6 provide the map and the layout of the new terminal for the carrier at least five days prior to the move
7 allocate a temporary storage room suitable for the equipment in transit both at origin and at destination
[惠普(hp) 服务器机柜搬迁细]
乙方搬迁前准备:
1熟知甲方提供运输线路
2安排搬迁员分工
3准备搬迁需工具(:十字字t8t9 t10t15 t20t30 t40搬迁标签纸箱滑车钳子减震材料等) 车辆相关资料
4甲方意提前三天新机房熟悉甲方提供设备摆放图
moving instructions on hp server & cabinet
(a) the carrier shall make the following preparations beforehand
1 be fully familiar with the transportation route or routes chosen by the shipper
2 divide the workload among its employees
3 get ready the vehicles and relevant documents as well as all the tools needed such as various types of screwdrivers t8t9 t10t15 t20t30 t40 colorcoded labels cartons pulleys wrenches and shockabsorbing materials
4with the shipper's approval inspect the new terminal and get familiar with its layout three days prior to the move
二 服务器 机柜拆卸
1甲方乙方时检测服务器状态服务器配置检测完双方验机单签字(搬迁验机表见附件a)
2甲方关闭搬迁设备软件程序
3乙方工作员断开电源
4拆卸前位乙方工作员佩戴防静电手环
5甲方现机柜套设备进行统标识
6台服务器应联线硬盘电源贴应标签
7断开服务器联线
8服务器拆离机柜果拆离硬盘应做标识
9服务器进行包装拆离硬盘做减震包装
10搬运车
(b) disassembling hp server & cabinet
1 both the shipper and the carrier shall inspect and test the server and its accessories simultaneously and both parties shall sign on the inventory list (see attachment a) after the satisfactory inspection
2 the shipper is to terminate all the software employed on the server
3 the employee of the carrier is to turn off the power supply
4 each employee of the carrier shall put on an antistatic bracelet before work
5 the carrier shall now start to attach a colorcoded label to the cabinet and its corresponding server in an organized way
6 the cables disks and power supply of each server are marked with identical colorcoded labels respectively
7 the cables of the server are taken away
8 the server is separated from the cabinet and its disks are properly labeled if taken out
9 the server is securely packed and its isolated disks are wrapped in shockabsorbing materials
10 the server together with its accessories is loaded in the vehicle
[易安信( emc) 服务器机柜搬迁细]
乙方搬迁前准备:
1熟知甲方提供运输线路
2安排搬迁员分工
3准备搬迁需工具(:十字字t8t9 t10t15 t20t30 t40搬迁标签纸箱滑车钳子减震材料等) 车辆相关资料
4甲方意提前三天新机房熟悉甲方提供设备摆放图
moving instructions on emc server & cabinet
(a) the carrier shall make the following preparations beforehand
1 be fully familiar with the transportation route or routes chosen by the shipper
2 divide the workload among its employees
3 get ready the vehicles and relevant documents as well as all the tools needed such as various types of screwdrivers t8t9 t10t15 t20t30 t40 colorcoded labels cartons pulleys wrenches and shockabsorbing materials
4 with the shipper's approval inspect the new terminal and get familiar with its layout three days prior to the move
二 服务器 机柜拆卸
1甲方乙方时检测服务器状态服务器配置检测完双方验机单签字(搬迁验机表见附件a)
2甲方关闭搬迁设备软件程序
3乙方工作员断开电源
4拆卸前位乙方工作员佩戴防静电手环
5甲方现机柜套设备单元进行统标识
6台服务器应联线硬盘电源贴应标签
7断开服务器联线
8服务器拆离机柜
9服务器进行整体减震包装(注:甲方咨询易安信客服建议硬盘单独拆离服务器)
10搬运车
(b) disassembling hp server & cabinet
1 both the shipper and the carrier shall inspect and test the server and its accessories simultaneously and both parties shall sign on the inventory list (see attachment a) after the satisfactory inspection
2 the shipper is to terminate all the software employed on the server
3 the employee of the carrier is to turn off the power supply
4 each employee of the carrier shall put on an antistatic bracelet before work
5 the carrier shall now start to attach a colorcoded label to the cabinet and its corresponding server in an organized way
6 the cables disks and power supply of each server are marked with identical colorcoded labels respectively
7 the cables of the server are taken away
8 the server is separated from the cabinet and its disks are properly labeled if taken out
9 the server together with its hard disks is securely packed in shockabsorbing materials in accordance with the recommendation made by the emc customer service department
10 the server together with its accessories is loaded in the vehicle
[惠普(hp) 型机磁盘阵列柜 搬迁细]
乙方搬迁前准备
1熟知甲方提供运输线路
2安排搬迁员分工
3准备搬迁需工具车辆相关资料
4甲方意提前三天新机房熟悉甲方提供设备摆放图
5型机工作员配合完成拆卸前准备
moving instructions on hp small machine & disk array cabinet
(a) the carrier shall make the following preparations beforehand
1 be fully familiar with the transportation route or routes chosen by the shipper
2 divide the workload among its employees
3 get ready the vehicles relevant documents and all the tools needed
4 with the shipper's approval inspect the new terminal and get familiar with its layout three days prior to the move
5 team up with the working staff of the shipper in charge of the said device to render it ready to be disassembled
二 拆卸
1甲方乙方时检测设备检测完双方验机单签字(搬迁验机表见附件 a)
2甲方关闭搬迁设备软件程序
3拆卸前位乙方工作员佩戴防静电手环
4甲方现机柜套设备单元进行统标识
5台型机磁盘阵列柜应联线贴应标签
6断开联线
7设备进行减震包装
8搬运车
(b) disassembly
1 both the shipper and the carrier shall inspect and test the device simultaneously and both parties shall sign on the inventory list (see attachment a) after the satisfactory inspection
2 the shipper is to terminate all the software employed on the device
3 each employee of the carrier has to put on an antistatic bracelet before work