挡土墙施工组织设计


    挡土墙施工组织设计


    目 录
    编制说明········································
    二 编制原··································
    2.1编制·····································
    2.2编制原·····································
    三工程理目标·····································
    四工程概况·········································
    4.1工程理位置·································
    4.2施工场周围环境·····························
    4.3工程质·····································
    4.4工程范围规模·······························
    4.5工程特点·································
    五设备员动员周期材料组织供应··················
    5.1员设备动员周期····························
    5.2技术准备······································
    5.3材料组织供应··································
    六施工准备时设施·······························
    6.1时房屋设施··································
    6.2水电设施····································
    七 施工组织机构建立·······························
    7.1 组织机构设置·································
    7.2施工组织理机构运作························
    八施工计划··········································
    81 工期进度计划·································
    82 施工队伍员构成···························
    83 施工设备计划·································
    84 材料供应计划措施···························
    九施工方法··········································
    9.1挡土墙构造····································
    9.2填土施工求··································
    9.3锚杆挡土墙施工································
    9.4施工工艺流程··································
    9.5扶壁式挡土墙施工······························
    9.6衡重式挡土墙施工······························
    十工程质量保证措施···································
    10.1技术保证措施·································
    10.2质量理措施·································
    10.3施工组织措施·································
    十安全保证措施:····································
    11.1安全施工措施·····························
    11.2安全保证体系·································
    十二文明施工加强环保······························
    12.1文明施工·····································
    12.2施工现场环境保护····························
    12.3绿化工作措施·································
    十三施工进度保证措施:································
    13.1般保证措施·································
    13.2组织保证措施·································
    13.3技术保证措施·································
    134济保证措施··································
    135合保证措施··································
    十四雨季施工技术措施·································
    十五采新工艺新技术成节约措施·····················
    十六施工现场面布置图·······························
    16.1施工总面布置································
    16.2施工总面布置·······························




    施工组织设计
    编制说明
    编制标工程施工组织设计程中仔细阅读招标文件认真阅读充分理解设计意图基础结合公司施工验根施工场状况信守合确保质量工期安全文明生产持续注重环保合理控制工程造价指导思想细心研究形成施工组织设计容中阐述工程实施时施工设备施工计划安排施工技术方案施工组织实施方法序确保工程质量工期措施安全文明环境保护措施编制程中择优选择施工方案做科学合理济方便工程施工统筹安排提供技术支持

    二 编制原
    2.1编制
    1挡土墙工程招标文件设计图纸关参考资料
    2公司施工现场考察标前关会议精神
    3部颁建筑基基础设计规范建筑基处理技术规范混凝土结构设计规范建筑桩基技术规范建筑边坡工程技术规范公路路基设计规范现行国家重庆市相关标准规范
    2.2编制原
    1根工程特点然条件工期求确保工程质量施工安全前提采科学合理施工作业方法筹划力安排调配需机械设备满足施工生产需确保力物力充分发挥作绩效化
    2详细辨分项工程间施工序相互制约关系认真研究统筹安排理清控制素控制素形成连贯合理施工工艺流程
    3施工重点工序难点工序进行科学分析采成熟施工技术验做切实行合理济
    4根级政府部门质量安全文明施工环境保护求建立项保证体系前制定完善保证措施确保施工生产项理目标利实现
    5充分利公司力资源机具设备动员资源工程区域利社会资源
    三工程理目标
    工期目标:180天
    质量目标:工程次验收合格率100合履约率达100
    安全目标:执行国家颁布种施工安全规程杜绝伤亡重交通火灾机损等事
    环境目标:保护环境文明施工根国家关政策保护线然生态环境灭尘降噪减少污染挂牌岗文明施工
    四工程概况
    4.1工程理位置
    项目选址重庆(长寿)化工园区利园区统规划原四川染料厂闲置空进行建设距重庆城区约52公里北距渝长高速公路入口6km距长寿火车站约5km晏家铁路货运站约12km装置分两部分第部分工艺装置第二部分原料气预脱硫相关配套公工程系统污水处理系统托源公司现设施根装置排污量进行改造施工界区新建
    4.2施工场周围环境
    工程点原川染厂生产区邻家化工厂周围树木较邻少量住户挡土墙区域装置区东南面工程点附条永久道路通市政道路场施工已开工
    4.3工程质
    改区质构造:表粘土夹卵石沉积层厚度10~20m耐力15~25tm2层第四纪沙溪庙祖岩层倾角稳定性良质现象震烈度六度
    4.4工程范围规模
    项目装置区域范围挡土墙施工结合形根质报告埋深构造分采衡重式挡土墙扶壁式挡土墙确定挡土墙基槽开挖深度放坡限度减少土石方工程量施工单位挡土墙范围进行施工回填估算工程挡土墙分11段总长度约770米中衡重式条石挡墙长约550米均高度约8米扶壁式钢筋混凝土挡墙约220米均高度约15米锚杆式挡土墙约100米
    4.5工程特点
    1工程土石方量施工作业面长工期短段分段施工采类型挡土墙施工
    2施工时充分考虑施工程中相邻工厂生产场施工单位影响做安全防范措施
    3工程挡土墙分衡重式条石挡土墙扶壁式钢筋混凝土挡土墙
    4施工时需组织基槽开挖堆放运输工程测量等作业做安全文明施工
    5挡土墙施工程中场施工单位密切配合确保挡土墙填料称均匀回填场回填质量
    五设备员动员周期材料组织供应
    5.1 员设备动员周期
    1司成套施工设备丰富工程施工验拥类工程技术员施工理员熟练机械操作手熟练劳工队伍签署合协议业规定进场时间 组织员施工机械设备进场展开作业进场工作清理现场接通施工点水电通讯安装机械搭建时房屋水池作混凝土砂浆施工配合等
    2种专设备材料进场采汽车运输方式进行安装调试完毕时投入生产
    3施工设备进场时组织进入该项目工程技术员工程理员分批进入施工现场开始项目理部筹建工作
    4员安排表
    序 号


    备 注
    1
    理员
    4

    2
    技术员
    6

    3
    施工员
    100


    5.2 技术准备
    员进场立开展技术准备工作技术准备工作分业准备工作外业准备工作
    1业准备
    1)审核分析设计图纸提供实施性施工图纸
    2)时工程设计施工包括料场建设时房修建时施工便道修建等
    3)编写实施性施工组织设计施工具体员安排机械设备配备场布置施工工序施工进度做具体周密说明
    4)编制质量计划落实质量理体系提出质量理标准明确保障措施
    5)编制施工工艺标准保证措施切技术规范设计图纸准
    6)制定技术理办法实施细量作细准
    7)进行岗前培训着重培训员工岗位职业技工程质量意识安全生产意识
    2外业准备
    1)租赁项目部办公生活房
    2)整时场清理施工现场
    3)测量控制体系建立
    4)类实验仪器配备
    5)类施工设备安装调试
    5.3材料组织供应
    1水泥:拟采水泥厂生产合格水泥进行施工汽车运施工现场
    2钢材(钢筋)拟重庆市市区购买汽车运施工现场
    3碎石砂:拟线料场购买汽车运施工现场
    余型材料组织购买运抵施工现场
    六施工准备时设施
    6.1时房屋设施
    项目理部准备现场附租民房方便业监理政府等联系
    6.2水电设施
    1施工水电
    线水源丰富工修建蓄水池通潜水泵输水送施工点方法解决
    2生产生活电
    生产电采化工园区高压电源生活电取居民电网生活水取饮水点施工区生活电接高压线备发电机组供生活水取饮水点备井供应
    3混凝土拌场
    园区时整场做混凝土搅拌场
    4交通通讯
    项目理部安装电话传真机便业监理政府保持联系施工队手机理部保持联系协调工作保持项目部施工队统指挥协调充分利电脑电子信箱外界进行信息交换沟通获取项目信息
    项目部配备行政车材料采购车生活车台解决施工队交通材料时生活问题
    七 施工组织机构建立
    7.1 组织机构设置
    1公司高度重视工程旦中标工程列公司重
    点工程优质期完成工程施工务全公司范围抽调理水高具丰富施工验员组成施工项目理部项目理部设六职部门配备足够数量具施工理施工验技术专业骨干负责工程建设全程理组织协调确保项工程理目标实现项目法求控制工程进度质量安全文明施工等
    2项目理部设项目理总工程师调度指挥
    副理项目部设施工技术科安全质量科计划财务科物资设备科测试中心综合办公室六职部门
    7.2施工组织理机构运作
    1理员配备
    1) 项目理部项目理公司具丰富施工验承担
    类似工程建设工程师担负责施工生产程组织指挥协调工作项目理部副理总工程师分责指派丰富验员担
    2) 专业技术负责相关专业配备配合项目总工程
    师做施工技术理工作
    2理职部门工作
    1)项目理部理机构施工技术科安全质量科计划财
    务科物资设备科测试中心综合办公室六职部门部门责制执行条紊开展工作
    2)项目理部施工技术科安全质量科等部门派专指导现
    场相关工作业监理设计院关单位部门保持效联系时解决施工中出现种问题
    八施工计划
    81 工期进度计划
    1工程施工总工期90天日历天
    2开工日期甲方达开工令准规定施工日历天全部工程应完成通验收
    3施工工期进度计划:
    根业求公司该工程工期定90天:
    1)施工准备期:接业中标通知书周公司组织员进入施工现场开始施工前期工作作施工前项准备工作预计5天完成
    2)施工期:准备工作完成展开全面施工作业采流水作业分队分段施工事前制定计划条紊进行项工作预计77天完成
    3)施工收尾交验期:体工程完工8天应加紧余零星工程施工工程全面清理工作达业求工程交工条件
    4公司述工期节点求结合施工现场实际情况工程施工计划进行科学合理安排根公司施工验完全力甲方指定工期利完成工程
    82 施工设备计划
    1满足施工生产落实施工机械配置计划单位领导挂帅快速抽调足够数量性良机械设备运抵施工现场类型机械数量足采取新购租赁办法补齐
    2机械设备配制
    序号
    机 械 名 称
    规 格
    单 位
    数 量
    1
    燃空压机
    V353

    6
    2
    混凝土振动棒
    ZN35

    4
    3
    混凝土搅拌机
    J500

    2
    4
    抽水机
    ф100mm

    3
    5
    履带式挖掘机
    1m3

    1
    6
    动翻斗车
    5t

    4
    7
    钢筋切割机
    HGQ40

    2
    8
    钢筋弯曲机
    HGW40

    2
    9
    全站仪
    NTS202

    2
    10
    纬仪
    M310378

    2
    11
    水准仪
    M214516

    2
    12
    电焊机
    BX1500

    2


    83施工队伍员构成
    1项目理部选择施工队伍时注重进场队伍施工信誉员技术素质配套情况阶段实际表现施工力施工质量否满足需
    2进场队伍实施动态理允许擅扩充意抽调
    确保施工队伍素质员相稳定
    3未关质量安全方面培训操作工许岗进场
    队伍必须配备定数量专职协调质量安全理员
    84 材料供应计划措施
    1工程材料供应项目理部统负责材料供应采取统采购统调运原进行材料供应均应符合业提出求监理工程师意
    2工程材料货物种类型物品天然状态加工者制造出均应该新符合合求类型质量
    3作正式工程中材料制成品样品(包括材料样品工现场制成品样品)监理工程师批准施工单位妥善保存监理工程师准许行处置时止
    4技术规范关参标准求材料生产商供应商测试证明书时施工单位提供份证明书原件复印件证明书证明材料采系列编号参考编号目然证明书中包括关参考标准技术规定条款求容
    5施工单位全部材料取样测试施工工艺设备量测装置进行日常检查控制质量保证技术规定批准试样相致
    6施工单位做材料试样试验委托监理工程师批准具相应资质试验单位承担
    7材料质量工程质量生命必须严格控制材料进货渠道材料质量关做质量检工作
    九施工方法
    9.1挡土墙构造
    1挡土墙般间隔10~20m应设置道变形缝(伸缩缝)墙身高度墙荷载变化较基条件较差时应采较变形缝间隔变形缝宽度20mm缝墙外顶三边填塞沥青麻筋涂沥青木板塞入深度宜200mm
    2基岩性变化处墙高突变处建(构)筑物连接处应设沉降缝
    3挡土墙顶应设置护栏护栏高度形式总图确定
    9.2填土施工方法
    1清表土中草根杂物零乱土堆陡坎洼推碾实
    2填土碾压必须时进行次填土虚铺厚度应超035m10吨左右压路机碾压6~8遍遍间应10重叠宽度
    3挡土墙2米范围型机械填筑
    4填土压实系数094
    5填方土料求应建筑基基础工程施工质量验收规范(GB50202—2002)关规定执行
    9.3锚杆挡土墙施工方法
    1锚杆制作
    1)锚杆采Φ28(材质HRB335)钢筋隔离架隔20m设置插入孔底端距孔底面50mm锚杆完整岩层锚固长度4500mm
    2)锚杆制作前保证钢筋直油锈直径长度符合设计求
    3)采单面焊搭接接头焊接符合求搭接长度200mm
    4)锚杆长度误差超±200mm角度误差超±3o
    5) 注浆钢筋长l000mm底端钢筋短200mm绑丝胶带钢筋绑起保证脱掉注浆拔出注浆中部绑扎
    6)段位土层时采锈刷沥青船底漆沥青玻纤布缠裹层数少二层
    7)锚杆段外端应埋入钢筋砼面层50mm
    2锚杆组装安装
    1) 锚杆连接时采焊搭接焊时采E50焊条锚杆
    钢筋直径28mm时采机械连接
    2) 插入锚杆前必须隔2m焊锚杆支架插入锚杆时应灌
    浆锚杆钢筋时放钻孔底部注浆端部距孔底宜100mm锚杆钢筋放置钻孔中心保证锚杆钢筋周围砂浆厚度均匀
    3) 插入钻孔锚杆求直应锈土层易渗水强
    风化岩层锚筋应事先涂层锈漆两层沥青玻璃布包扎包扎面涂层防腐漆套防腐塑料
    3注浆
    1)成孔插入Φ28mm锚杆钢筋 锚杆缓慢放入孔严禁猛推猛拉投入困难时拔出锚杆透孔投放锚杆钢筋露出坡面外10Omm
    2)注浆锚杆钢筋起入孔注浆底端距孔底50~lOOmm
    3)灰砂11水灰04配制水泥浆水水泥外加剂量必须准确注浆充盈系数1
    4)结块期失效水泥浆液搅拌充分均匀团块异物
    5)注浆压力035MPa注浆前先清水疏通注浆注浆时孔口退出净水泥浆暂停废水泥袋封堵孔口完成次注浆20min进行二次补浆注浆缓缓拨出拔时边拔边注浆直全部拨出孔孔口二次捣实
    6)保证注浆饱满孔口设止浆塞注浆保持压力3~5min
    7)注浆拨出立水洗干净整理回收注浆泵搅拌机洗干净
    8)常检查维护注浆设备保持良工作性
    4锚杆挡土墙施工
    采逆作跳槽式分段施工段长6m高:土层强风化基岩层25m中风化基岩层4m高度段锚杆挡土墙施工完允许继续分段施工段锚杆施工完毕现浇肋柱墙板采逆作施工时应采取措施防止挡土墙滑
    5定位:孔位允许偏差±15mm锚杆孔距误差超150mm
    6钻孔:锚杆采风枪眼锚杆轴线岩体体结构面滑
    移面成角度相交钻孔符合求:钻孔圆直钻孔方量岩层结构面垂直锚杆孔径杆体直径15mm钻孔深度满足列求:锚杆孔深允许偏差±50mm钻孔质量锚杆材料质量锚杆施工质量基础确保根锚杆发挥支护作
    7清孔:高压风孔粉尘杂物吹出
    8砂浆制备:采低425级具抵抗水侵蚀化学稳定性普通硅酸盐水泥施工配合拌合站统拌合锚杆砂浆
    9锚杆准备:设计求截取杆体整直绣油
    10注浆:孔深孔径验收合格灌注水泥砂浆普通水泥砂浆锚杆施工求:砂浆拌均匀拌次拌砂浆初凝前完砂浆质量确保粘结力锚固力核心必须充分注意严格控制初凝前完遵守规定:
    1)注浆开始中途暂停超30分钟时水润滑注浆罐路
    2)注浆孔口压力控制04~06Mpa间
    3)注浆插距离孔底5~10cm处水泥砂浆注入缓慢匀速拔出直注满止
    11插锚杆:注浆结束迅速锚杆体插入锚杆杆体插入孔长度短设计长度95孔口砂浆流出必须锚杆体拔出重新注浆
    12测量放样:锚杆施工完成立进行根路堑设计开挖坡面放出基坑开挖边线边坡台位置
    13基坑开挖:采钻孔开挖开挖时注意开挖断面垂直路堑边坡坡面
    14模板加工安装:模板采钢模板木模板相结合制作厂加工拼装运现场安装
    15钢筋绑扎:钢筋制作场制作运现场绑扎钢筋绑扎前锚杆求进行拉拔试验合格进行步工序
    16基坑钢筋模板检查:检查项目验标规定执行
    17混凝土制备浇筑:混凝土拌合站集中拌合混凝土输送车运输插入式振动棒进行振捣
    18养护:混凝土养护混凝土浇筑12~24时进行养护时间少7天
    19锚杆施工质量保证措施
    1)施工中定期检查电源线路设备电器部件确保电安全
        2)喷射机水箱风包注浆罐等应进行密封性耐压试验合格方
      3)注浆施工作业中常检查出料弯头输料注浆路接头等磨薄击穿松脱现象发现问题应时处理
        4)处理机械障时必须设备断电停风施工设备送电送风前应通知关员
        5)锚杆孔注浆时注浆罐应保持定数量砂浆防罐体放空砂浆喷出伤
      6)非操作员进入正进行施工作业区施工中喷头注浆前方严禁站
      7)施工操作员皮肤应避免速凝剂树脂胶泥直接接触严禁树脂卷接触明火施工程中指定专加强观察定期检查锚杆抗拔力确保安全
    8)锚杆安设意敲击端部3天悬挂重物砂浆凝固前确实作锚杆防护工作防止敲击碰撞拉拔杆体加固方开挖粘结锚杆锚杆粘结水泥砂浆强度达80进行锚杆外端部弯折施工
    9)锚杆材质检查:确保批锚杆材料均附生产厂商质量证明书施工图纸规定材质标准监理指示抽检锚杆性
    10)注浆密实度试验:选取现场锚杆锚杆直径长度锚孔孔径倾斜度相锚杆采现场注浆相材料配合拌制砂浆现场施工相注浆工艺进行注浆养护7天剖检查密实度
    11)拉拔力试验:设计求边坡支护锚杆作业分区300根锚杆中抽查三根进行拉拔力试验锚杆抗拔力达设计值采扩钻孔直径增早强砂浆围岩接触面积加解决
    12)施工程中锚杆孔钻孔规格(孔位孔径孔深倾斜度)进行检作记录配合监理员进行抽验
    13)监理现场参加项试验检查项试验记录成果验收报告监理验收签认合格作支护工程完工验收资料
    20喷射混凝土施工质量求
    1)边坡进行喷射混凝土前先清理防护岩面杂物清浮石松动岩石
    2)埋设控制喷射混凝土厚度标志铺设钢筋网网眼符合图纸规定钢筋网应锚杆联结牢固岩面间隙30mm
    3)喷射混凝土前先进行试喷确定喷射技术参数施工操作序请监理工程师认方进行面积施工
    4)喷射混凝土配合试验报告规定速凝剂参量试验室试验确定
    5)混合料运输存放程中应严防雨淋滴水块石等杂物混入装入喷射机前应筛
    6)喷射混凝土应分段分片进行作业开始时应先送风开机料结束时料喷完关机喷射机供料时应连续均匀机器正常运转时料斗应保持足够存料喷层厚度均匀
    7)喷射开始时应减喷头受喷坡面距离调节喷射角度保证钢筋网岩面间混凝土密实性
    8)喷射时应保持混凝土表面整呈湿润光泽干斑滑移流淌现象
    9)喷射完成视水泥种类气候情况7~14d应加强养生喷层周边未防护坡面衔接处应作封闭处理
    10)喷射混凝土应符合图纸规定厚度图纸求设置伸缩缝泻水孔
    11)喷射混凝土回弹物收集起放入批配料中








    9.4施工工艺流程
    浇筑面板混凝土
    锚杆筋锚固
    安放面板钢筋
    水泥浆拌制
    抗拔试验
    第二次注浆
    锚杆制作
    注浇制作
    成束
    安放锚杆注浆
    清孔
    钻孔
    第次注浆
    水泥砂浆拌制

    锚杆挡土墙施工工艺流程图
    95扶壁式挡土墙施工方法
    1开槽 沟槽开挖前详细调查现况线位置物探员测定线高程现场挖探坑现线做明显标记开槽时遇线处必须工开挖施工中遇明线时妥善保护通知关部门处理
    根土质情况开挖深度40米时开挖放坡坡度1:05开挖深度40米时开挖放坡坡度1:075挖槽时机械挖距槽底标高20cm时工清底超挖严禁扰动槽底原状土
    2基础处理
    设计基础尺寸基础处理厚度均基承载力关基础处理材料采石灰粉煤灰稳定砂砾该基础处理层基承载力满足设计求应采取换土等处理措施达设计求基础处理层处理需设计监理甲方确认出处理意见
    3挡墙基础钢筋成型
    1) 钢筋表面应洁净锈皮油渍油漆等污垢
    2) 钢筋必须调直调直钢筋表面钢筋截面减伤痕
    3) 钢筋曲成型表面裂纹鳞落断裂现象
    4) 钢筋品种等级规格直径种尺寸抽验均符合设计求
    5) 绑扎成型时焊前水锈油渍焊缝处咬肉裂纹加渣焊药皮应敲干净
    6) 绑扎焊接成型网片骨架必须稳固杯槽处钢筋浇注混凝土时松动变形
    4浇注挡墙基础混凝土
    1)混凝土配必须符合设计强度求
    2)混凝土振捣密实杯槽位置更应加强加细振捣防漏筋出现蜂窝狗洞
    3)预埋件设计位置基础钢筋焊接免振捣混凝土时发生变形位移
    5浇注墙顶三角混凝土
    1)测量员设计断高程严格控制模板高程
    2)模板侧压紧薄塑料条严禁跑浆
    3)浇注前墙顶凿毛刷素浆利混凝土结合
    6浆砌块石挡土墙施工方法
    1)测量员严格图纸进行放线
    2)沟槽采工挖槽底层进行基处理基础采木模支搭现浇混凝土基础
    3)墙体砌筑采分段砌筑位置图纸设置基础变形缝位置相邻砌筑高差宜超12m缝板安装应位置准确牢固缝板材料符合设计规定
    4)墙体天连续砌筑高度宜超12m相邻挡土墙高差较时先砌筑高墙段砌筑中板缝移位变形
    5)挡土墙高度50cm时设泄水孔距面25cm间距35m采PVC径3cm泄水孔侧直径25cm砂砾堆成30cm圆弧状外包透水土工布
    6)挡土墙隔1015m应设沉降缝缝宽1cm油毡木丝板填实沉降缝填土侧设置20mm宽乳化沥青油毡防水层
    7)挡土墙外露面留12cm勾缝砌块勾凹缝处采水泥砂浆
    8)挡土墙装饰砌块普通砌块间采专夹子连接成体
    7挡墙附属工程
    1)沉降缝
    挡土墙基础分段长度16m基础错台处分段处应留沉降缝基础沉降缝刷2—3道乳化沥青贴2层油毡填土侧墙面应设三油两毡防水层
    2)排水孔
    排水孔设置两墙面板间间距2米排水采30mm镀锌钢漏出墙板外侧10mm墙侧20mm3横坡孔口进水处采直径257cm砾石堆料堆料直径50mm
    8挡墙检验允许偏差:
    现浇挡墙基础允许偏差表:
    序号
    项目
    允许偏差(mm)
    检验频率
    1
    混凝土抗压强度
    必须符合GBJ10787

    2
    断面尺寸

    ±10
    20m

    ±10
    杯口宽
    +20 0
    3
    杯槽轴线位移
    10
    20m
    4
    杯槽底面高程
    +5 10
    20m
    5
    蜂窝麻面
    模板接触面1
    20m




    浆砌块石挡土墙允许偏差:
    项次
    检验项目
    允许偏差(mm)
    1
    面位置
    50
    2
    顶面边棱直度
    30
    3
    竖直度坡度
    05H
    4
    顶面高程
    ±20
    5
    断面尺寸
    设计值
    3)扶壁式挡土墙施工工艺流程:

    清理桩顶面
    绑扎钢筋

    立底模板
    测量放样














    立侧模板




    混凝土拌制运输土
    监理检测

    灌注混凝土



    制作混凝土试件
    养护





    9.6衡重式挡土墙施工
      浇注混凝土前应支架模板钢筋预埋件进行检查做记录符合设计求方浇注模板杂物积水钢筋污垢应清理干净模板缝隙应填塞严密模板面应涂刷脱模剂浇注混凝土前应检查混凝土均匀性坍落度高处模板倾卸混凝土时
    防止混凝土离析应符合列规定:
      1高处直接倾卸时倾落高度宜超2m发生离析度
      2倾落高度超2m时应通串筒溜振动溜等设施落倾落高度超10m时应设置减速装置(串筒高度设挡板)
      3串筒出料筒面混凝土堆积高度宜超1m
      4浇注混凝土插入式振动器时移动间距应超振动器作半径15倍侧模应保持50100mm距离插入层混凝土50100mm处振动完毕应边振动边徐徐提出振动棒应避免振动棒碰撞模板钢筋预埋件振动部位必须振动该部位混凝土密实止密实标志混凝土停止沉出气泡表面呈现坦泛浆
      5混凝土浇注应连续进行必须间断时间断时间应前层混凝土初凝时间重塑时间混凝土运输浇注间歇全部时间超表规定需超时应预留施工缝
      6施工缝位置应混凝土浇注前确定宜留置结构受剪力弯矩较便施工部位应列求进行处理:
       1)应凿处理层混凝土表面水泥砂浆松软层凿时处理层混凝土须达列强度:
      ①洗凿毛时须达05Mpa
      ②工凿时须达25Mpa
      ③风动机凿毛时须达10Mpa
       2)凿毛处理混凝土面应水洗干净浇注层次混凝土前垂直施工缝宜刷层水泥净浆水缝宜铺层厚度1020mm1:2水泥砂浆
       3)施工缝斜面时应浇注成凿成台阶状
       4)施工缝处理须处理层混凝土达定强度继续浇注混凝土需达强度般低12Mpa结构物钢筋混凝土时低25Mpa
      7浇注程中浇注完成时混凝土表面泌水较须扰动已浇注混凝土条件采取措施水排继续浇注混凝土时应查明原采取措施减少泌水
      8结构混凝土浇注完成混凝土裸露面应时进行休整抹定浆抹第二遍压光拉毛裸露面面积较气候良时应加盖防护开始养生前覆盖物接触混凝土面
      9浇注混凝土期间应设专检查支架模板钢筋预埋件等稳固情况发现松动变形移位时应时处理
      10掺加片石技术求:
       1)片石掺加前应清表面杂物泥土等
       2)片石掺入量般超总圬工体积25施工控制20掺入时乱投乱放石块应分布均匀净距100mm距结构侧面顶面净距150mm石块接触预埋件直接接触基底模板
       3)施工完毕时覆盖养生15天









    11衡重式挡土墙施工工艺流程:
    衡重式挡土墙工程施工序详



    复核形质情况
    基坑开挖
    基处理
    回填
    基础墙身浇(砌)筑
    承载力检测否满足求











    图41衡重式挡土墙工程施工序图

    十工程质量保证措施
    10.1技术保证措施
    1扶壁式挡土墙设C15素混凝土垫层厚100mm边宽出基础100mm
    2挡土墙基底坡度宜55时应基础做成台阶式台阶高度宜05m
    3基槽开挖严禁表清润基土时应做钎探工作
    4开槽必须会关部门验槽满足设计求方进行步施工
    5钢筋骨架应符合规范求松脱变形检验合格方入模配制骨料应选择良级配粗骨料粒径应40mm超断面厚度14含泥量重量计应超1砂子含泥量云母含泥量重量计超3
    6截面尺寸应符合设计求预埋件Sa2½级锈做表面锈迹焊渣毛刺粉尘水渍求涂装埋置时做表面整标高位置准确偏差应符合关施工验收规范求
    7混凝土耐久性基求:
    环境类
    水灰
    水泥量
    低混凝土强度等级
    氯粒子含量
    碱含量
    二b类
    055
    275kgm3
    C30
    02
    30kgm3
    8混凝土浇注环境温度宜控制20℃左右应避开高温低温作业
    9混凝土应振捣密实漏振少振保证构件表面光滑整蜂窝麻面裂缝等
    10混凝土浇注完毕应12时加覆盖浇水浇水养护少14昼夜
    11均气温低5℃时浇水应采取保温措施炎热气候应采取降温措施
    12拆模混凝土表面应加覆盖防止阳光暴晒寒潮袭击
    13钢筋接头优先采焊接图中注明者外采搭接


    14钢筋锚固长度搭接长度图中注明者外表采:
    钢筋种类
    HPB235
    HRB335
    锚固长度La搭接长度Ll
    25d35d
    30d42d
    15钢筋搭接接头应相互错开连接区段受拉钢筋接头数量应总数量25
    16扶壁式挡土墙施工程中采取效措施防止混凝土裂缝产生
    17墙填料应称均匀进行施工施工时应控制填料挡土墙利影响填料施工应砌体混凝土强度达设计强度75进行
    18挡土墙预埋Φ100(径)泄水刚性套坑外倾斜5左右间距2M交错设置
    19锚杆钻孔定位尺寸偏差应20mm锚杆偏斜度应锚杆长度5钻孔深度超设计长度应500mm
    20锚杆锚固段锚杆孔应水泥浆遗失否会降低锚杆受力性锚杆耐腐蚀性孔壁裂隙较稀水泥浆灌注孔24时重新钻孔
    21岩芯采取率:强风化岩石65中风化岩石80微风化岩石90
    22喷射混凝土前应清岩面浮渣清钢筋污锈
    23岩面喷射层混凝土铺设钢筋钢筋保护层厚度25遇较岩腔先浆砌片石填喷混凝土混凝土采干喷法次喷射厚度5~7次喷射应前层终凝进行间隔超时应水表面浮膜浮尘洗干净喷
    24采双层钢筋网时第二层钢筋网应第层钢筋网混凝土覆盖铺设
    25喷射程中回弹落骨料必须清干净禁止喷射混凝土
    26喷射混凝土面层钢筋网接头采搭接加点焊搭接长度网格边长
    27喷射混凝土粗骨料粒径15mm
    28喷射混凝土施工时应采取措施防尘
    29钢筋网喷射混凝土面层应翻边坡顶部10~15m形成护坡顶坡顶坡脚应做防水
    30喷射混凝土支护锚杆应采全粘接锚杆
    31喷射混凝土应做抗压强度试验抗压强度试验需试块应工程施工中抽样制取喷射混凝土面板厚度检测凿孔法钻孔法厚度均值应设计厚度值应设计厚度90
    32施工现场水泥堆放整齐袋装水泥堆放高度般超10包堆宽5-10袋限时露天堆放应防雨蓬布遮盖
        33水泥贮存时间般超3月水泥质量怀疑没握时前复查试验试验结果
        34现场砂水泥分开堆放整齐准混杂砂保持清洁严禁混入泥土
        35浆砌石砌筑砂浆必须具时流动性良易性确保砌体灰缝充分填满压实
        36现场简易检验方法手捏成团指封出浆松手松散合格
        37施工部位结构形式砌筑砂浆标号严格设计求进行控制浆砌石墙体砌筑严禁混合砂浆
        38砌筑砂浆定量分批做强度试验100m3砌体做组评定砂浆强度试件水泥品种标号配合等变动时均应做试件组作衡量砂浆质量
        39截水墙立板墙体板连接采刚钉
        40木板泄水孔钻孔采电钻钻孔位置木板连接缝错开
    41般测量定位仪器选纬仪穿越型沟陡坡构筑物定位测量选全站仪纬仪全站仪须重新校验合格方开工前先进行仪器报验校验合格证
    42构筑物测量定位工程坐标标高引线蓝图设计桩点坐标点
    43放线时采纬仪测构筑物角点位置埋设控制桩作施工位置桩位传递现场画出草图作记录
    44浆砌石石墙采交错组砌法石料形状挂双线分皮卧砌第层石块面整面石块相互错缝外搭接摆铺稳定分皮叠砌
      45浆砌石应铺浆浆法砌筑灰缝应饱满插捣密实灰缝般20-30mm铺浆厚度约40-60mm较空隙应碎石块嵌砂浆中允许先填碎石塞砂浆
      46浆砌块石形成水通缝结搓
        47块石填腹时水灰缝宽度3cm竖灰缝4cm填腹石灰缝应彼错开
        48砌体表面勾缝特殊求时应砌筑时留出2cm深空缝水泥砂浆缝勾完否应砌体砂浆凝固空缝清洗干净勾缝
        49砌体表面勾缝采缝勾缝砂浆标号低砌筑砂浆标号
        50砌体砌筑次性砌完允许意留施工缝
    51浆砌块石形成水通缝结搓砂浆饱满
        52砌体表面勾缝特殊求时应砌筑时留出2cm深空缝水泥砂浆缝勾完否应砌体砂浆凝固空缝清洗干净勾缝
        53砌体表面勾缝采缝勾缝砂浆标号低砌筑砂浆标号
    10.2质量理措施
    司根GBT190002000建立ISO90012000质量理体系承建项目均严格执行相关质量理规定施工项目设置监督质量理体系运行审核员审员确保质量理体系效运行
    项目理根总公司质量理体系容开工前制定工程质量目标质量保证体系质量保证措施等容严格执行
    1质量目标
    工程施工满足设计相关技术规范求工程质量次验收合格率100优良率90争创精品工程

    2质量理保证体系(框图)
    工作容



    技术 负责



    施工 技术组
    计划 预算组















    接收技术资料



    l




    图纸审查草拟施工方案

    n

    l
    o
    o
    o

    编制施工规划
    x
    ¡

    l




    编制施工组织设计

    x

    l
    ±
    y


    现场测量控制网点
    x


    o

    o

    l
    施工图纸设计交底
    ±
    l
    ±
    o
    ±
    ±
    ±
    ±
    施工图纸审会审

    ¡
    ±
    l
    ±
    o
    ±
    ±
    施工方案技术交底

    ±
    ±
    o

    ±
    ±
    ±
    编制创优工程规划

    ¡
    x
    o

    l
    ±
    ±




    建立工序理点

    ¡
    ±
    l

    y


    开展QC活动


    l
    o

    y


    组织技术攻关
    n
    n
    ±
    l

    ±


    组织均衡施工
    ¡
    o

    l

    y
    ±

    工序交接理


    ¡


    l


    班组检





    l


    专检

    ¡
    y
    ±

    l


    联检
    ±
    ±
    l
    ±

    ±


    材料检验

    ¡
    ¡
    °


    l

    施工技术问题处理

    n
    ¡
    l




    计量理
    ¡


    l


    y

    质量信息理

    n
    l
    o

    y
    ±

    质量珍断
    ±
    l
    u
    ±

    ±






    工程资料整理

    x

    o

    l
    ±
    ±
    创优工程检验

    ¡
    l
    o
    ´
    o
    o

    工程质量评定

    ¡
    l
    ±

    ±
    ±

    组织工程交工

    ¡

    l
    ±
    ´
    ±

    技术总结

    ¡

    l

    ´


    服务
    户回访

    ¡
    l
    ±

    ±
    ±

    图例

    n 决策 l 办 ´ 协 o 协办 ± 参加
    ¡ 督促 y 执行 x 审批 u 会审 ° 诊断
    3质量检验体系(框图)
    质量检验体系框图










    4技术理体系(见框图)
    5质量检查程序
    工序班组检→现场质检员检查→部监理工程师检查→现场监理工程师检查→道工序
    6技术理体系框图
    工程监理


    总工程师


    测量组
    技术组
    质检组











    土石方施工负责
    施工负责
    附属结构施工负责











    7理措施
    1)全面开展质量理
    2)积极开展劳动竞赛
    3)严格执行监理工程师指令
    4)严材料关
    8技术措施
    1)建立分项工程道工序施工环节质量标准技术标准施工中严格执行加强职工队伍培训提高职工安全质量技术素质
    2)严格履行技术复核质量理检查制测量放样应进行复核测量资料施工技术资料专保收集整理施工步
    3)组织强力施工队伍具验工程技术员训练素技术员参加施工
    4)开工前认真审阅图纸种技术文件时编制施工组织设计质量计划进行分项分部工程划分分解创优指标提出创优计划实施期限
    5)编制分项分部工程施工实施细规范施工工期方法质量标准检测手段严格实施
    6)严格履行技术复核质量理检查制测量进行复核符合制度方放线测量资料施工技术资料必须专保收集整理施工步
    7)认真进行工程技术质量施工安全技术交底施工序进度安排均作交底作书面记录备查
    8)严格关施工规范设计图纸施工工程质量评定隐蔽工程验收必须监理工程师评定签认方进行步工序施工
    9)施工中结构原需进行设计修改必须办理工程联系单设计修改通知单方施工
    10)保证建设监理工程师充分履行职责行权力前提建立项目理部部监理工程师制班组设质量检查员实行质量否决制度工程监理密切配合搞质量理工作做事前质量控制施工程质量控制竣工验收等工作

    10.3施工组织措施
    1合文件求设计图纸技术规范标准制定项目创优规划确定分项目质量理目标工序质量理标准工序质量标准实现保证分项目质量目标实现分项质量目标实现保证工程项目质量创优目标实现
    2实行项目理质量负责制技术质量双承包责制逐层签定技术质量责状激发全体参项目施工员创优积极性促进工程质量提高
    3加强教育贯彻制度科学理促进创优整工程施工中力求做五施工(施工图未复核测量未复核材料未实验合格证技术未交底隐蔽工程未签证施工)三交接(检记录施工记录专职质检员签字交接)三教育(工前培训工中指导工讲评)
    4加强现场质量控制质量检查合文件技术规范规定设立工试验站质量监测站配备满足检测需种测试仪器设备工程种材料设备施工工序进行效检测控制
    5施工中采先进施工工艺精良施工设备断优化施工组织设计方案推广应四新成果突破创优难点采先进技术科学理相结合力组织两化施工工程质量次成优
    6虚心听取接受工程师代表指导监督坚决执行工程师代表指示时落实工程师代表改进意见提供满足工程师代表现场检测需员仪器设备搞工程师代表配合工作心协力创优
    7作种试验检测记录施工提供准确种数收集整理工程质量施工技术资料时编制竣工文件
    8建立施工建设监理设计方组成质量监控网络整工程施工程中始终处受控状态
    9工程预验收前承包商组织关员设计施工图施工标准求施工工程进行全面检查符立进行整改
    10全部工程完工符合合规定时承包商应业监理申请交工验收
    11承包商业监理组织预验收提出问题应业监理规定期限整改完次提出交工申请
    12交工资料业监理组织验收验收办理交工资料交接手续


    十安全保证措施
    11.1安全施工措施
    1成立环境保护领导机构:项目部成立环境保护委员会指定名副理负责环境保护工作组织领导规章制度制订检查落实工程队成立环境保护领导组队领导组组长施工工长勤保障部门负责成员负责日常性环境保护工作检查落实
    2积极联成环境保护网络认真听取方环保部门意见虚心接受监督落实
    3根工程项目作业特点制订保护措施:
    1)砌筑操作前必须检查操作环境否符合安全求道路否畅通机具否完牢固安全设施防护品否齐全检查符合求施工
    2)砌筑基础时应常检查注意基坑边坡土体变化情况开裂位移现象堆放石材料应离槽(坑)边1m
    3)砌筑高度超施工操作面12m时应搭设脚手架脚手架堆放材料超规定荷载值块脚手板操作员超两准放稳固工具物品脚手板垫高操作更准未计算加固情况脚手板意叠搭层脚手板应规定搭设安全网
    4)脚手架施工时堆放材料施工机具等物品超荷载否必须验算采取效加固措施方堆放施工
    5)准站墙顶面划线砖砌刮缝清理墙面检查脚垂直度等工作修石时应面墙面砍注意防止碎石跳出伤垂直工投递石料时支搭站宽度06m专脚手架认真传递防伤
    6)准墙顶脚手架修凿石材免墙体受振动影响墙体质量石块掉伤准勉强超胸部墙砌筑片石免宜控制墙面垂直度碰撞石墙石时失手掉造成事石块投掷运石坡道加固定牢订设防滑条栏杆扶手等
    7)已砌山墙应时系杆(檀条等)放置跨山墙连接稳定采加固措施雨期天班前应防雨材料遮盖防雨水掉砂浆致砌体倒塌
    4进出场便道常洒水养护避免造成尘土飞扬污染周围环境
    5施工设备停置序材料堆放井井条环境卫生专扫施工营区生活区干净整齐
    6施工理员现场施工员均挂牌岗
    7质量员现场进行质量关活动进行观察监督检查检查现场施工工作否已批准程序进行
    8现场检查活动机特殊原原天进行观察发现足缺陷作出记录足缺陷重性书面口头形式通知责方
    9周末技术部总结检查情况进行讲评通报保证重点项目重程漏检
    10项目工月召开次部门项目理参加质量结会技术部会家汇报月质量体系运行情况时找出存问题督促问题部门积极采取纠正措施抓紧整改
    11现场发现质量问题改正行动程序文件规定格式记录着工程进展逐步阶段移交作竣工状态证明质量达求记录文件
    12项目工质量体系运行中出现质量理文件突法执行情况时时公司报告求问题时解决
    13施工现场面布置符合关安全卫生规定机具摆放整齐序种标志标识正确醒目达文明施工标准
    14出现危伤员危险时相关工作应停止直危险状态消
    15表现出安全素设备工具必须立停止直处安全状态施工区域移出更换
    16现场发生事应立采取应急措施第时间业提交书面报告业监理相关规定公司事处理程序进行事调查处理
    17施工现场道路应符合标准求特殊况设盖板安全护栏
    18施工现场根消防求配置消防设施器具保持消防通道畅通
    19晚施工时获监理认项目部提供具足够明强度设备确保安全生产
    20控制箱电气开关闸刀等须放置防雨棚防雨罩设漏电保护器防漏电
    21作业现场应常扫保持清洁垃圾应集中堆放时清理运送指定点
    22熟悉安全健康关法律责义务熟悉项目部全面综合安全健康程序细节
    23违反安全程序关员项目部相关规定采取适惩罚性措施违反安全规定危生命财产安全员施工队伍中清出
    24施工员工作前应规定穿戴作业相适应防护品检查作业场施工机具设备完情况记录次检查日期发现问题采取补救措施等
    25施工员工作中应遵守岗位安全技术操作规程做文明施工
    26施工员工作前工作中均食酒精类饮料应禁止烟火场吸烟
    27施工区域应走指定通道应跨越危险区应行驶机动车爬跳攀登起重机吊钩吊运中物件
    28应注意种安全标志应便拆占种明信号防雷等安全防护装置安全标志检测仪表等
    29发生事应时抢救员财产保护现场关员报告执行交接班制度
    30施工现场电气作业专职电工规范操作负责作业区种带电设备电线漏电检查发现问题立整改
    31电气设备操作员必须穿合格劳保服装戴标准绝缘手套前必须电气设备进行漏电试验
    32雨雪潮湿天气般露天电气设备必时采取适安全电措施
    33施工现场电设施应设备负荷线首端处设置漏电保护装置漏电保护器应装设开关箱
    34施工现场配电室应通风良采取防止雨雪动物入措施
    35电设备金属外壳(安全电压外)应作保护接保护接零潮湿条件特恶劣施工现场电气设备应采保护接零
    36配电屏(盘)种配电线路应编号标明途配电线路维修时应悬挂禁止合闸操作警告标志停送电必须专负责
    37搬运石块时注意配合步调协调致互相力均匀保证安全
    38石笼制作时注意安全绑扎铁丝时注意滑伤皮肤钩破衣服
    39修筑施工便道应保证足够宽度强度确保运输安全
    40工开挖基槽时注意滑伤子防腐层工凿岩时防止石块崩伤操作员
    41修筑围堰导流时围堰应足够强度防止水垮
    42浆砌石护坡时应坡石块清理干净防止石块清理净滑落伤
    43搅拌机操作时应遵守操作规程严禁非岗位员违章操作
    44进料便道堆料场量利施工作业带已乡村砂石路等没植砂石场植已破坏场
    45施工时采取适措施保证现场道路斜坡面会形成障碍造成水灾破坏植
    46作业带外慎砍伐树木立补救安全性施工性允许整场工作员应量破坏场表面触原根系植物面切断重新萌芽生长创造条件
    47开挖沟时表层土底层土分开堆放设置合适沟渠排水保持跨跃沟安全通道种影响土方式沟里水抽区
    48回填沟时应量作恢复表原形状表面正常排水
    49层土表层土回填应沟两侧土层匹配保存表土层土回填前填沟里面
    50回填堆放挖出土壤时表层草皮表土
    51压实沟中回填土压实程度体相施工前状态量减少沉沟水道交叉处中断排水沟两岸压实填土时注意必时采取适措施确保施工安全
    52回填前需开挖沟肉眼检查发现动物应弄出较动物够壁挖斜坡便够爬出
    53取料场水域保持低限度植缓带
    54取料场扩展程中移走表土层必须适堆放采取措施防止水土流失侵蚀局限取料场范围擅扩作业面
    55指定料场未关部门许施工中意河床岸边倾倒挖取卵石采砂废弃物
    56毁坏迁移清理树木植超工程施工需范围乱砍乱伐
    57施工时时加宽加固道路施工完毕应结合实际情况影响环境予恢复原貌
    58违反环保规章造成环境破坏应立报告项目监理项目监理指示负责清理回收()采取复原措施表径流聚集沟部设置环节流排水沟边坡处沟砌筑截水墙
    59稳定性差沟边坡软土基采浆砌条(块)石护坡
        60施工作业前通风险危害分析常见病传染病医院状况调查基础针毒蛇出没环境机械设备发电机排水等危险素编制应急预案应急程序成立应急组准备应急物资保证位员工熟悉应急预案紧急情况应急行动
    61电源开关附应迅速关闭电源否绝缘物体挑开电线分离电器患者脱离电源呼吸停止者立进行工呼吸
    心脏停跳者进行胸外心脏压送医院急救处理
    62处理损伤原首先抢救伤员生命呼吸心跳停止伤员应立进行复苏术
    63治疗窒息遇严重失血胸部开放性损伤应快止血封闭胸部伤口
        64治疗休克骨折固定运送四肢骨折伤员必须夹板固定伤肢脊椎骨折须卧硬板床
        65动脉出血止血带隔1时放松次次1—2分种转运途中应保持呼吸道畅通
        66送医院预防感染纠正电解质代谢失调注射破伤风抗毒素
    67急性中毒者立终止接触毒物毒物呼吸道皮肤侵入时立病撤离中毒现场移空气新鲜方污染衣服必须立脱清洗接触部位皮肤采取催吐洗胃导泻等方法清体尚未吸收毒物清皮肤毒物脱污染衣服量温水清洗皮肤毛发清眼毒物清水彻底清洗清伤口毒物解毒剂送医院
    11.2安全保证体系
    安全保证体系框图
    安全法规



    技术负责
    项目理(安全责)


    项目安全规程
    技术措施


    现场安全负责



    施工区


    纠正整改



    1建立安全生产责制
    2建立安全保证体系健全级部门生产责制责落实
    3项施工务明确安全指标包括奖惩办法保证措施签订级安全生产责制
    4加强安全意识技术教育
    1)刚进施工现场施工员必须进行安全技术教育
    2)工变工种必须进行新工种安全技术教育
    3)工掌握工种操作技熟悉工种安全技术操作规程
    4)认真建立职工劳动保护记录卡时做记录
    5安全保证指导思想
    工程施工现场工程规模较施工员专业交叉施工频繁安全素切实保证施工程安全事安全第预防指导思想落实处实现指导思想安全生产组织保证理制度防止伤害事培训教育等方面采取切实行相应措施
    6建立项目理部安全监察部门安全领导组织强调生产必须安全生产原推行全员安全生产责制.
    7项目设专职安全监察部门配合工班长进行施工程中安全理工作
    8施工工班设兼职安全员配合工班长进行施工程中安全理工作.
    9理制度措施
    建立健全项安全生产理制度进行施工技术交底时时进行安全交底特种作业员必须关部门培训考试合格持证岗建立定期安全检查制度建立相应考核措施施工理员工种操作员佩戴岗位标识严禁违章指挥违章作业野蛮施工
    10施工程安全措施
    施工程中安全教育执证岗电桩基开挖通风防坍塌高空作业等严格安全规程执行保证安全生产
    11消防安全保证措施
    加强工程消防安全理贯彻预防防消结合消防方针确保工程利进行采取措施确保消防安全
    12重点防范安全措施
    工程施工中环节安全理容忽视时采取措施改进工程重点防护措施项开工前必须完善安全措施
    1)防止触电事发生电工应常检查电器线路安全线路均配备标准配电箱
    2)维护行交通安全施工现场出入口重部位实行封闭施工采钢围栏施工现场封闭利文明施工减少相互干扰
    3)作机械设备安全防护措施
    4)做防洪防火防盗防爆炸事等四防工作
    防洪:施工场开挖时排水沟备抽水设备
    防火:电力线路明线路规定布设生产生活时房特殊情况(试验)律电炉乱丢烟头组建防火组织定期检查施工现场安放种灭火器具
    防盗:现场派专保卫加强方公安联防机关联系确保施工安全
    防爆:易燃易爆物品必须派专理物品分开储存乙炔氧气瓶存放应设立单间储存防火规定距离求修建储存库房库房周围应设立明显防火标志切关员严禁动乙炔氧气进入储存库房
    13需重点防范安全措施
    1)施工现场设置安全标志场沟坑等边缘设安全护栏场狭行运输繁忙路段设专指挥交通
    2)工较高建(构)筑物时设施重库房均应架设避雷装置
    3)施工测量钉桩注意周围行安全面锤钢钎工具意抛掷
    4)场道路应常维护保持畅通场道路应坦直
    5)现场架设时线路必须绝缘物支撑电线缠绕钢筋树木脚手架
    6)种电器设备应配专开关室外开关插座应外装防水箱加锁操作处加设绝缘垫层
    7)三相五线制供电系统中电器设备金属外壳应作接保护接电阻应4W
    8)种电器设备检查维修应停电作业必须带电作业时应安全措施派专监护
    9)工安装变压器必须符合电业部门求设专理施工电量保持三相衡
    10)现场变(配)电设备处必须备灭火器材高压安全具非电工员严禁接带电设备
    11)施工现场时明:室明线路应瓷夹固定电线接头应牢固绝缘胶带包扎保险丝应电负荷量装设
    12)检修电气设备时应列求进行:
    电气设备检修必须电工进行意操作
    工作中遇停电应拉开关切断电源检修结束必须仔细检查项设备情况没异常方合闸
    型电气设备检修应切断电源设防护进行开关处设置警示标牌工作完成方拆需进行送电试验时必须认真检查关部门联系方进行
    13)操作员工作中擅离岗位操作操作证相符合机械机械设备交机种操作证员操作
    14)机械设备施工现场停放时应选择安全停放点关闭驾驶室(操作室)拉驻车制动闸
    十二文明施工加强环保
    12.1文明施工
    施工现场理中采取种措施现代化施工客观求组织施工施工现场保持良施工环境施工秩序措施:
    1组织理措施
    1)建立健全理组织机构施工现场应成立项目负责组长生产技术质量安全消防保卫材料行政卫生理员成员文明施工理组织
    2)健全理制度包括:岗位责制济责制检查制度奖惩制度会议制度项专业理制度等
    3)健全理资料加强教育培训工作推广应新技术新工艺新设备现代化理方法提高机械化作业程度
    2现场理措施
    1)施工现场生产素(物素)处状态断进行整理整顿清扫清洁培养员工素质技术实现文明施工
    2)合理定置全工施工期间需物空间合理布置实现物场物场物物间佳结合施工现场秩序化标准化规范化体现文明施工水
    3)目视理目视理眼睛理称见理利形象直观色彩适宜种视觉感知信息组织现场施工生产活动达提高劳动生产率保证工程质量降低工程成目视理种简便适透明度高便员工理控制科学组织生产种效理方式
    4)容形式:
    ①施工现场项理制度操作规程工作标准施工现场理实施细等布告等应墙报挂板等形式展示清楚
    ②定置程中清晰标准化视觉显示信息落实定置设计实现合理定置
    ③施工现场理岗位责采标牌显示更落实岗位责制激发岗位员责心利群众监督
    ④施工现场合理利种色彩安全色安全标志等实行标准化理利生产员工安全
    ⑤施工现场理项检查结果张榜公布
    12.2施工现场环境保护
    1环境保护国项基国策施工程中采取措施国家方法规行业企业求采取措施控制施工现场种粉尘废水废气固体废弃物噪声振动等环境污染危害时防止水土流失保护改善施工环境保证身体健康消外部干扰保证利进行
    2环境保护措施具体做法:
    1)实行环保目标责制
    2)加强检查监控工作
    3)保护改善施工现场环境进行综合治理
    4)严格执行国家法律法规统筹安排合理布置综合治理
    5)施工前应制定施工期间环境保护措施防止气污染水源污染噪声污染
    6)施工废弃物采取措施集中外运指定点避免阻塞河沟污染水源法时处理运走必须设法防止散失
    7)施工中产生污水废水集中处理意排放
    8)运输贮存施工材料时采取覆盖仓贮等措施防止漏失
    9)路线农田灌溉区时采取必时措施接边沟安设水等保证影响中断农田排灌作业
    10)工程范围外土植应注意保护未工程师批准意堆置废方挖掘
    3保持作业带范围遗留施工产生垃圾碎片
    4工现场食物垃圾应天清楚掉
    5垃圾应运施工场外适垃圾处理场妥善处理
    6垃圾处理沟渠里表土土堆
    7清理员收拾垃圾碎片切断残枝施工预料进行处理固体废料垃圾(非生物降解垃圾)收集起场外点进行处理
    8固体废料垃圾(非尘物降解垃圾)收集起场外点进行处理
    9种油料应容器存放废油应时回收集中储存严禁倾倒油料面造成污染时应采取措施进行清理
    10清理时切断树木运出作业带范围作业带范围进行切片切碎堆接方供公众加利

    12.3绿化工作措施
    1工附树木花草进行保护
    2施工期间绿化区进行理养护
    十三施工进度工期保证措施
    项工程施工高效优质序原均衡进行根工期质量安全等求合理安排精心施工确保质量安全前提采取措施保证预定工期实现工程施工受外围交通影响现场采局部封闭围蔽施工全路段进行统筹安排施工控制施工进度安排晚间施工关键工序拟定全天候施工理员分三班作业员分四班进行施工施工安排中充分考虑雨季施工时候特点认真做雨季施工质量保证工作
    13.1般措施
    公司技术力量雄厚设备齐全特善组织仗硬仗建设单位中具良信誉具良广泛社会关系条件工程利进行奠定基础工程开工立根施工进度计划进行项工作落实工程开始施工组织步骤进行
    1机构组织员配备理保证配备高级技术组成精干项目理部详见工程项目理机构部门单位岗位体制订严格责制度做责负制定严密规章制度须毫例外遵守
    2计划安排保证施工进度总计划工期求精心制定分项施工计划项实施方案重工序做施工组织专项设计合理安排分项工程施工序全面覆盖施工全程方面确保关键线路工序时完成充分利利条件时间缩短作业流程环节加快施工进度计划周日进行细分计划执行检查落实预先解决续工作中会出现问题续工作利进行创造利条件
    3材料理机械设备理保证材料进行分层理明确材料理制度整施工程材料周转利中钢板校等支护材料投入关键确保施工进度支护材料均周转2次数量投入编制详细施工项目材料计划材料供应计划合理指导组织施工项目材料理确保材料时供应材料供应计划执行程中定期定期检查坚决杜绝停工料现象发生
    工程土方施工机械土方运输车辆控制施工进度关键设备施工期间必须保证施工机械设备表中机械时进场施工机械设备理中做机固定实行机械保养责制机械设备效益济利益联系起进提高机械生产效率确保工序时完成组织机械设备流水施工搞机械设备综合利机械设备施工创造良条件力提高率缩短作业时间
    4技术保证标项目技术负责全面负责该标段施工技术理级技术员建立技术理组负责项专利技术问题解决施工方案编制监督执行建立技术责制级技术员建立明确职责范围达负责司职充分调动级技术员积极性创造性时解决施工中技术问题方案指导施工防止出现返工现象影响工期技术理组时总结施工中出现问题验易施工保证质量加快进度项措施加推广更指导续作业
    5施工组织理保证施工生产程中合理支排工序交接搭接确保道工序施工利进行工序施工前均进行详细施工技术交底统施工工艺加强程控制出专职质检员负责施工全程工序质量检查确保工序达规定质量目标防止出现合格工序返工影响工期现象施工时果客观原延误工期时监理工程师意利加夜班集中力物力抢回关键线路工期
    6安全生产保证加强职工法规安全制度学教育增强安全生产观念新工进行岗位教育特种操作员接受般性安全教育外进行专门安全操作技术教育训练施工生产程中进行常性施工生产中安全生产进行监督检查结合季节特点做防水防触电防坠落防坍塌防火等项措施制度项目理部成立安全组设专职员负责日常安全检查监督保证施工利进行
    7勤供应保证加强机械设备车辆保养维修保障施工正常运转搞职工食堂防病治病保障职工身体健康保证正常出勤率确保工期
    8工作关系协调保证根工作关系客观性采取处理方法企业济协作关系通企业部分工分责分权分利解决
    9加强工作方联系做居民协调工作取支持配合工程利进行

    13.2组织保证措施
    1快速进场快速展开
    单位中标迅速成立项目理总工程师首施工领导组根工程工序工种合理组织劳动力配足员机具设备统指挥统调度统安排施工员施工机械设备做三快进场快施工准备快开工快
    2准备工作条紊
    进场积极配合业加强征拆迁创造良施工外部环境施工便道施工水电施工时设施着先通善原月全部完成保证体工程利开工
    3科学组织合理安排
    加强施工计划理科学性突出重点兼顾般运统筹学网络技术系统工程进行实施性施工组织设计编制实施程中针实际情况断充实调整
    4员保障
    组建强力项目理部选派富验具敢敢拼精神工程师担项目理选派具丰富施工验专业化施工队伍
    5设备保障
    项目设备投入量施工前期定计划足设备留余加强保养维修保证设备完率
    13.3技术保证措施
    1编制网络计划
    项目理部进场根技术文件合文件求现场实际情况重新编制实施性网络计划进行施工组织调度时编排月旬日作业计划尤控制性工程重点工程施工必须制订单项作业计划具体采取措施进行工期控制:
    2总体计划工期90%日历天数制订单位工程目标计划相应措施
    3全面编制项总工期阶段工期工序作业工期三级网络计划设计工期直接间接施工队伍分解落实
    4强化施工程中劳动力机械设备材料供应等资源衡协调监督指导工作
    5预先制订网络计划制订计划实现环节进行实调整补救措施
    6断优化调整项目技术方案促进工期提前
    7充分利网络计划时差均衡资源利实现优生产
    8建立工期控制项资料收集记录制度严格实行
    9提前编制报送周转料施工材料半成品计划提前联系材料进场供应情况保证施工正常进行
    10定期检查
    天召开工碰头会项目理负责召集职部门员专业施工负责检查日完成情况第二天出现问题早采取策物资供应劳动力做充分准备农忙季节提前落实劳动力保证施工生产正常进行
    11充分利网络计划技术
    网络科学组织施工提高时空利率推行立体行交叉作业法实现左右前外种工序相互穿插紧密衔接限度缩短工期提高工效
    12投标目前设计初步施工组织设计编制工程总进度网络中标根施工进度编制详细二三级网络计划送监理工程师审批合格严格实施断调整确保工期
    级网络:工程总进度网络满足总体计划求
    二级网络:施工作业区进度网络
    三级网络:单项工作进度网络
    根网络计划(包括级网络)确定重点节点定期考核
    该工程进度实行网络计划理通网络计划实施实际情况检查肯定会反映问题保证工程进度首先保证二线供应确保设备材料供应确保外围条件充分具备供应外围素原造成网络计划失控次定期检查网络计划实际情况根实际情况时调整计划
    13实时动态调整网络:
    设计变更材料设备供应时原网络计划严重破网应重新时调整计划符合实际确保合工期调整网络实施更加重视加投入网络调整期计划实施更加困难确保网络利实施理技术密切配合
    14合理安排劳动力
    15合理安排劳动力关键工作执行日夜轮流作业制节假日休息积极关注搜集气象资料天气汛期情况提前考虑早做安排种材料保证时充足供应种周转材料储备充足类型机械设备保养运转良保证施工优状态进行总体布置合理安排保证工期
    16积极采种新工艺新技术砼掺入复合添加剂早期强度增长快利早日拆模进入道工序)提高机械化程度提高工效等
    17加强甲方驻代表监理联系图纸变更疑问社会素等影响进度问题提前考虑积极协商解决
    18IS09001质量体系进行严密科学化程序化理保证工程质量达优良标准杜绝工程缺陷减少浪费原材料进场材料投入工序检查质量评定检验等环节序误
    19安全施工生产题必须安全生产落实安全生产责制根安全保证体系针工程特点制定岗位安全生产责制安全生产思想深入员工心里确保施工生产利进行
    20狠抓重点控制工程关键工序控制工期工程工序组织精锐队伍增加资源投入组织先期施工保证工程衔接序接口畅
    21合理计划施工段注意减少单位交叉施工施工单位统筹安排施工作业优化资源利组织规模生产创造佳施工条件

    134济保证措施
    准备足够流动资金确保工程施工进度需关键线路工序提前工期功班组相关员进行奖励关键线路工序工期滞造成总工期延误项目采加投入确保总工期施工需项资源必须保证正常供应
    135合保证措施
    工程项目设置2名专职合理员全面理种合资料认真全面履行施工合项目理部时协调施工作业班组施工进度加强业监理相关单位联系时处理种纠纷确保工程利进行时完成整项目工作

    十四雨季施工技术措施
    1雨季施工期间进行施工工程认真编制雨季施工技术措施根施工实际情况制定层层落实具体办法定期检查制度利雨季施工技术措施落实
    2根现场布置实际情况时做施工现场排水工作
    3时设施现场施工设备防护:
    施工现场时设施雨期前应整修加固完毕保证漏塌倒周围积水施工现场机电设备(配电盘闸箱电焊机水泵等)均应防雨措施(搭设防雨蓬设简易机电房等)时电气设备电源线悬挂固定拖拉现场电气设备防雨漏电接保护装置应灵敏效专负责时检查雨季前应检查明动力线混线漏电电杆腐蚀埋设否牢等保证雨季正常供电
    4怕雨怕潮忌腐蚀原材料构件设备等应放入室设立坚实基础堆放较高处采蓬布封盖严密等措施进行分处理
    5雨天施工砌筑工程时应防止基槽灌水雨水刷砂浆砂浆稠度应适减少砌筑宜留施工缝收工时应覆盖砌体表面砌筑砂浆应拌施工期间高气温超30℃必须分拌成2h3h完毕
         6雨天施工砂浆工程造成施工原材料(砂水泥等)降雨含水率增加砂浆配应根雨量情况进行调整雨天进行砂浆施工应测定原材料含水率重新调整砂浆配合砂浆运输砌筑程中雨量运输设备浇筑点应防雨措施避免砂浆运输浇筑中降雨改变砂浆流动性易性

    十五采新工艺新技术成节约措施
    1确保优质快速完成工程施工容施工中力推广新技术新工艺新材料新结构降低成
    2采计算机作理工具
    工程实施中采计算机整工程进度质量计划劳力资金进行效控制实现标准化系统化网络化科学理采系列先进项目理软件进行资源均衡分配流水作业循环利节约成
    3采电算化提高工作效率
    施工方案设计均采电算化施工中方案设计施工监控受力分析提供快速准确数分析

    十六
    施工现场面布置图
    16.1施工总面布置
    1布置原
    1)施工辅助设施时办公生活设施生活区布置招标文件规定范围
    2)场布置着利生产安全方便生活集中理济合理等原布置
    3)节约制宜充分利形结合场外交通线路方便施工原布置
    4)施工布置做充分发挥施工生产设施力满足施工总进度施工强度求
    5)设置效排水系统满足场排水求
    16.2施工总面布置图
    详见附图施工总面布置图附图

    文档香网(httpswwwxiangdangnet)户传

    《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
    该内容是文档的文本内容,更好的格式请下载文档

    下载文档到电脑,查找使用更方便

    文档的实际排版效果,会与网站的显示效果略有不同!!

    需要 10 香币 [ 分享文档获得香币 ]

    下载文档

    相关文档

    挡土墙施工组织设计书

    挡土墙施工组织设计书  目录 一、编制依据 1、编制说明 2、编制依据及原则 二、工程概况 三、工程总目标 四、施工部署 1、施工准备 2、施工调度 3、施工进度计划安排 ...

    12年前   
    12077    0

    恒大名都围墙及挡土墙施工组织设计(42P)

    太原恒大名都二期西侧挡土墙永久围墙工程施工组织设计一、编制说明 1二、编制依据及原则 1三、工程管理目标 2四、工程概况 2五、设备、人员动员周期及材料组织供应 3六、施工准备及临时设施 5七...

    2年前   
    301    0

    挡土墙施工

    1.工 程 概 况 1.1 工程概况 1.1.1 工程地址:青海省**县 1.1.2 工程名称:青海桥头铝电二期工程挡土墙、竖向及道路 1.1.3 建设单位:青海桥头铝电股份有限公司 ...

    5年前   
    1201    0

    挡土墙回填方案

    一、工程依据1、 《建筑地基基础工程施工质量验收规范》(GB50202-2002) 2、 《建筑工程施工质量验收统一标准》(GB50300-2001)3、 秦皇岛紫竹药业有限公司年产6吨米非司...

    2年前   
    434    0

    挡土墙安全技术交底记录

    挡土墙安全技术交底记录合同段:一 主持人: 交底人: 交底地点交底时间编号一、...

    4年前   
    1181    0

    挡土墙施工合同

    施 工 承 包 合 同   甲方:                     乙方:                       由     公司承建的     工程项目,经甲乙双方友...

    9年前   
    7273    0

    悬臂式挡土墙施工方案

    悬臂式挡土墙施工方案目 录1.编制说明、依据及原则 11.1编制依据 11.2编制说明 11.3编制原则 11.4 编制范围 22.工程概况及主要工程数量 22.1 工程概况 22.2主要...

    1年前   
    308    0

    混凝土挡土墙安全技术交底

    混凝土挡土墙安全技术交底 施工单位名称 单位工程名称 施工部位 施工内容 安 全 技 术 交 底 ...

    2年前   
    753    0

    挡土墙施工技术措施

    挡土墙施工方案 1. 编制依据 GBJ202-83 《地基与基础工程施工及验收规范》 GB50203-98 《砌体工程施工及验收规范》 GB50026-93 《工程测量规范》 ...

    11年前   
    11162    0

    边坡挡土墙施工合同

    1. 重庆****小商品批发市场   20、21号楼边坡挡土墙工程     施 工 承 包 合 同       发包人:重庆金田置业有限公司 承包人:     ...

    5年前   
    1187    0

    悬臂式挡土墙设计全解

    悬臂式挡土墙工程实例 ——成都市三环路与铁路立交工程设计路段为K23+385.728—K23+486.726右幅快车道;已知,填方最大高度5米,地基承载力设计值[s]=150k...

    2年前   
    762    0

    仰斜式挡土墙施工技术方案

    挡土墙施工技术方案本上挡墙K16+073~K16+215段墙身采用M7.5浆砌块石仰斜式挡土墙,基础均采用C20卵石砼整体式基础,墙高4米。一、材料要求石料应是结构密实、石质均匀、不易风化、无...

    7个月前   
    241    0

    挡土墙工程劳务分包合同

    经双方充分协商,甲方同意将都安红渡移民新城挡土墙劳务工程发包给乙方,双方本着平等、互利、友好合作、保质高效的原则,特订立以下合同条款,以共同遵守。

    5年前   
    2936    0

    2017年挡土墙工程承包合同范本

    挡土墙工程承包合同范本  发包方:(以下简称甲方)  承包方:(以下简称乙方)  根据工程施工需要,现将 工程挡土墙承包给乙方施工,为保证工程顺利完成,根据《中华人民共和国合同法》、结合本工程...

    7年前   
    551    0

    混凝土挡土墙施工主要工序

    第五章 施工主要工序1、基础测量放线根据设计图纸,按围墙中线、高程点测放挡土墙的平面位置和纵断高程。精确测定出挡土墙基座主轴线和起讫点,伸缩缝位置,每端的衔接是否顺直,并按施工放样的实际需要增...

    3年前   
    587    0

    混凝土挡土墙施工安全技术交底

    工程名称华安县红楼至和目坑公路工程交底日期施工单位路桥有限公司工 种交底内容:K0+180-K0+300混凝土挡土墙混凝土挡土墙安全技术交底1、施工前编制既有线施工方案及防护措施包括既有...

    2年前   
    462    0

    平方土、及护壁、挡土墙工程承包合同书

    场平方土、及护壁、挡土墙工程承包合同书  发包方(甲方):    贵州**能企业(集团)公司                     承包方(乙方):                  ...

    11年前   
    10553    0

    养老基地景观工程毛石挡土墙施工方案

    山东烟草养老基地景观工程毛石挡土墙施工方案编制:审核:单位:XX园林建设有限公司日期:二O一四年X月X日目 录 1. 编制依据……………………………………………………….32. 工程概况及主要...

    1年前   
    303    0

    挡土墙施工分包合同协议书

    挡土墙施工分包合同协议书   甲方: 乙方:   根据《中华人民共和国合同法》、《中华人民共和国建筑法》及其他有关法律、法规,遵循平等自愿、公平和诚实信用原则,双方就       ...

    13年前   
    15479    0

    挡土墙混凝土压顶施工工艺

    挡土墙混凝土压顶施工工艺1 施工准备1、挡土墙砌筑已完成并通过监理工程师验收,可以进入下道工序。2、施工人员全部到位、施工机械设备进场。3、各种原材料已进场并通过抽样报验。4、以控制网点为基点...