project procedure


    project procedure
    10 PURPOSE
    The purpose of this procedure is to identify the positions and organizational responsibilities within Engineering Department
    20 SCOPE
    This procedure is applicable to the organization of engineering department through the entire project (See Exhibit 0011)
    30 RESPONSIBILITIES
    31 MANAGEMENT RESPONSIBILITIES311 Engineering Manager
    The Engineering Manager reports to and receives project direction from the Project Director The Engineering Manager is responsible for directing all aspects of the engineering work The Engineering Manager provides project direction to the engineering team and is the focal point of the entire CPECC engineering effort for the project The Engineering Manager is responsible for assuring that all engineering activities are carried out in compliance with the quality assurance program and the project engineering instructions and procedures The Engineering Manager will assure close interfacing and coordination of engineering activities with Procurement and Construction Departments
    312 Deputy Engineering ManagerThe Deputy Engineering Manager shall assist and take responsibility for the Engineering Manager to deal with various engineering affairs who is responsible for• project engineering progress technical key points and quality control
    • organization and implementation of project commissioning and startup
    • interrelationship coordination among functional offices of Engineering Department• timely resolution of various technical and managerial problems to assure the smooth execution of project engineering and the timely completion of the various assignments
    313 Project Engineers
    Bearing the responsibility for the Engineering Manager these Project Engineers shall
    • prepare the project engineering implementation plan
    • coordinate the interrelationship of disciplines
    • check and expedite the engineering progress and executions of each discipline
    • apply the relevant statement of QAQC Office and control the quality of engineering documentation
    • follow the various technical requirements specified by Technical Office
    32 FUNCTION OFFICE RESPONSIBILITIES321 Technical Office
    The Technical Office shall
    a maintain a staff of various technical experts engineers and designers
    b be responsible for carrying out unified regulations standards for the project
    c develop and review equipment and material procurement documents and organize technical negotiations with suppliers for equipment and material by each discipline as required by Procurement Department
    d organize designated specialists for discussing and dealing with the critical technical problems of each discipline one by one in groups and make guiding comments
    e solve and coordinate all technical problems for each discipline
    f study variations in engineering with QAQC Office and submit to the Engineering Manager for approval
    322 Control Office
    The Control Office shall
    a bear the responsibilities for working out detailed design plan for project under the supervision of Project Control Department
    b check supervise and coordinate the implementation of the detailed design plan
    c be responsible for issuing weekly progress reports and monthly progress reports and submit to Project Control Department on time
    d make suitable adjustment to the design plans and submit the outcome of adjustment to Project Control Department in time after the approval of the engineering323 Administration Office
    The Administration Office is responsible fora administration of internal and external documents drawings engineering documents and letters of the department including receiving and distribution documentsb translating issuing and submitting works of engineering documentsc management and maintenance of computer system installation and maintenance of basic software and management of computer instructions and documentsd secretary works during entire engineering under the direction of project Administration Departmente office works and routines of Engineering Department324 QAQC Office
    The QAQC Officea performs routine reviews of engineering design output documents which are considered as Self Quality Checks of the Engineering Department
    b is responsible for organization coordination and verification of implementation and execution of the quality system on behalf of the Engineering Manager
    c is responsible for the organization coordination revision explanation issuing and management of development of procedures and job instructions under the supervision of the QAQC Department and responsible for the distributed documents with effect
    d is responsible for quality control during entire engineering and giving preliminary direction interim examination and evaluation of final results
    e is responsible for quality analysis and collection handling transmitting and feedback of quality related information
    f has the authority for the quality of all design output document of Engineering Department
    [0] 325 FieldLocal Office
    Engineering Department will in accordance with the needs of the field activities and construction schedule mobilize various discipline engineers to the field for construction support The construction support engineering’s responsibility and procedures are detailed in procedure EDP016 of this manual
    40 REFERENCES• EDP016 Construction Support Engineering50 EXHIBITS• Exhibit 0011 Organization Chart of Engineering Department
     
    文档香网(httpswwwxiangdangnet)户传

    《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
    该内容是文档的文本内容,更好的格式请下载文档

    下载文档到电脑,查找使用更方便

    文档的实际排版效果,会与网站的显示效果略有不同!!

    需要 2 积分 [ 获取积分 ]

    下载文档

    相关文档

    CONTRACT FOR PROJECT INSTALLATION

    CONTRACT FOR PROJECT INSTALLATION  this contract for project of installing main engine is made o...

    8年前   
    477    0

    AGREEMENT OF BOT PROJECT

    AGREEMENT OF BOT PROJECT  this agreement is made and entered into by and between the government ...

    10年前   
    458    0

    ITOS DB Procedure V2.0

    ITOS DB运作办法(V2.01. 目的 ...

    10年前   
    543    0

    项目管理与Project 2007的关系

    项目管理与Project 2007的关系  在项目管理知识体系中,包括九大知识领域(范围管理、时间管理、费用管理、质量管理、人力资源管理、沟通管理、风险管理、采购管理、整体管理)。但从项目管理...

    14年前   
    444    0

    航行试航应急预案Sea trial emergency prepare procedure

    航行试验应急预案 Sea trial emergency prepare procedure 为了确保试航安全吉利,特制定本应急预案,请熟悉并按本应急预案执行: 紧急情况,需寻求外界帮...

    13年前   
    13276    0

    Microsoft-Project-2010 基础教程(完整版)

    MS Project 2010基础教程了解 Project 2010Microsoft Project 2010 推出的新功能能够显著地改善您管理、计划和查看项目的方式。 如果您已经熟悉早期...

    2年前   
    542    0

    改变项目风险管理的看法(change the way on project risk management)

    改变项目风险管理的看法(change the way on project risk management)摘 要:本文主要从个人对风险的概念、风险的特征、如何识别风险、衡量风险、决策风险等的...

    12年前   
    601    0

    myGS- Project大型制造行业解决方案-ERP解决方案

    myGS- Project大型制造行业解决方案-ERP解决方案  行业背景分析  单件定制和单件小批制造企业一般具有规模大、生产周期长、工艺路线复杂、业务流程重复率低的特点,一个合同下来究竟赚...

    12年前   
    516    0

    以Project Server为平台建立的项目管理流程-第一章(Part 1)

    以Project Server为平台建立的项目管理流程--第一章(Part 1)本章简介:描述MS Project Server 2002的功能特性以及进行软件项目开发的进度控制需要的制度支持...

    10年前   
    523    0

    英语教案范例 高中牛津英语 unit3 project 模块一

    英语教案范例 高中牛津英语 unit3 project 模块一**师范大学教育实习教案实习生:施萌                                               ...

    9年前   
    618    0

    上海五星瑞吉红塔酒店培训教材—TAO-RM-RES-A020 End&Morning Shift Procedure

    THE ST. REGIS SHANGHAI上海瑞吉红塔大酒店TRAINING ACTIVITY OUTLINE培训活动纲要Task: End of Shift Procedures / M...

    10年前   
    444    0

    高中英语牛津译林版 选择性必修第三册Unit 3 Back to the past-Extended reading,Project,Assessment同步课时作业(含答案和解析)

    Unit 3 Back to the past Extended reading, Project, Assessment & Further study—2021-2022学年高一英语牛津译...

    5个月前   
    133    0

    高中英语牛津译林版 选择性必修第三册Unit 3 Back to the past-Extended reading,Project随堂检测(含答案和解析)

    Unit 3 Back to the past Extended reading, Project, Assessment & Further study—2021-2022学年高一英语牛津译...

    1年前   
    285    0

    项目用地协议

    项目用地协议甲方:**市化学工业循环经济示范园区管委会乙方: 甲乙双方经友好协商,就乙方拟在化工园区内投资建设年产       项目用地一事,达成项目用地协议如下:一、       使用土地位...

    11年前   
    715    0

    中海壳牌南海石HSE一般安全工作惯例

     CSPC NANHAI PETROCHEMICALS PROJECT 中 海 壳 牌 南 海 石 化 项 目 HSE GENERAL SAFE WORK PRA...

    12年前   
    26634    0

    实习报告英文版

    实习报告英文版  Position:   Recruiting manager of the testing department   Duty:   This August I found ...

    9年前   
    535    0

    2017年英文版实习日记

    英文版实习日记  position:  recruiting manager of the testing department  duty:  this august i found a n...

    7年前   
    464    0

    电大英语本科论文

     中央广播电视大学“人才培养模式改革和开放教育试点” 英语专业本科(教育方向)集中实践环节   英语课堂教学行为研究项目设计 鉴定表     姓 名:____ ____...

    5年前   
    1155    0

    PMP考试模拟试题(40题)

    考前模拟试题 Disclaimer: These questions are intended for study purposes only. Success on these quest...

    12年前   
    634    0

    基层作业队岗位责任制

    钻井队岗位责任制目 录Contents1. 平台经理岗位职责 Rig manager 22. 带班队长岗位职责Toolpusher 63. HSE监督岗位职责 HSE Super...

    2年前   
    377    0