第五园七期景观设计合同(带任务书)


    合编号:
    Project No



    深圳万科第五园七期景观工程设计合
    Shenzhen Tangyue Large phase II project Landscape Design Service Agreement




    项目名称:
    深圳万科第五园七期

    项目建设点:中国深圳

    设计容 :
    景观设计合

    委托方(甲方):
    深圳市万科南城房产限公司

    承接方(乙方):
    Karl Princic DesignIntaran Design Inc

    签订日期:2010年8月
    Project Name:
    VANKE TANGYUE SHENZHEN

    Project Location:SHENZHEN CHINA

    Design Content:
    LANDSCAPE DESIGN SERVICE

    Party A:
    SHENZHEN VANKE XINGYE REAL ESTATE CO LTD
    Party B:
    Karl Princic DesignIntaran Design Inc

    Execution DateMar 2010






    目录
    CATALOGUE







    1 合
    2 项目概况
    3 设计
    4 设计范围
    5 双方权利义务
    6 费付款设计成果

    7 违约责

    8 合生效终止结束
    9 般条款

    1 Bases of the Agreement
    2 General Description of the Project
    3 Bases of the Design
    4 Scope of the Design
    5 Rights and Obligations
    6 Fees Payment and Delivery of Documents
    7 Liability for Breach of the Agreement
    8 Execution and Termination
    9 Miscellaneous



    1:合
    合列法律条款致:

    11 中华民国合法中华民国建筑法

    12 建设工程勘查设计市场理规定关建筑工程勘察设计理法规规章

    13 相关建设工程审批文件

    2:项目概况
    21 项目名称:深圳万科第五园七期

    22 项目点:中国深圳

    23 建设规模:中国深圳万科第五园七期项目总占面积 68951㎡


    3:设计
    31 合规定容
    32 甲方提供景观设计务书

    33 甲方确认建筑底层面图市政红线图相关基础资料勘报告水文报告等
    34 设计规范规定应中华民国深圳市关设计规范设计规定

    4:设计范围
    41 设计容
    42 设计深度
    43 成果求
    详见附件景观设计务书

    5:双方权利义务
    51 甲方权利义务
    1 Bases of the Agreement
    This Agreement is entered into in accordance with of the following laws
    11 Agreement Law of People’s Republic of China Building Code of the People's Republic of China
    12 Market Administration Regulations for Engineering Construction Projects and Geological Surveys and other relevant laws codes and regulations
    13 The approved documents concerning Project construction
    2General Description
    21 Project Name VANKE SHENZHEN TANGYUE
    22 Project Location Dongguan China
    23 Project ScopeThe TangYue Large phase II project is located in Dongguan The project total property area of 350000 m2 landscape area of 108605m2
    3 Bases of the Design
    31 Contents stipulated in the Agreement
    32 Specifications for the schematic design development design provided by Party A
    33 First floor plan property line master plan design sub area graphic etc proved by Party A
    34 RequirementsInterpretation verification of SZ government and People’s Republic of China
    4 Design Scope
    41 Design Content
    42 List of Documents
    43 Specification of Deliverables
    Refer to Design Brief

    5: Rights and Obligations

    511 甲方合规定容乙方提交景观设计必需资料文件作乙方设计完整性正确性负责


    512 甲方应合规定金额时间乙方支付设计费设计程中甲方需已确认设计求做出重修改造成乙方增加额外开支费甲方负责具体费甲乙双方协商确定


    513 收乙方提交阶段性设计文件甲方应时书面形式确认明确提出修改意见完成时间
    514 甲方指定 陈悫 项目甲方负责乙方指定 Karl Princic 项目设计师果乙方更换项目设计负责设计师须提前周书面公文法签字通知甲方时须征甲方意
    515 甲方负责合中方面设计容相关员现场交流中组织协调工作甲方负责景观设计阶段政府部门进行申报工作
    516 甲方级设计文件审批合项目停缓建甲方应乙方实际完成工作量支付应付设计费



    517 甲方原延误设计工期合条款中相应出图日期延

    518 乙方履行合甲方提供阶段性终设计成果履行合产生研究成果双方意含切知识产权含著作权申请专利权专利权等权利属甲方 成果提交甲方甲方书面意乙方发明作者名义学术研究领域发表申报评奖甲方征询乙方意行委托方式修改处分乙方提交设计成果未甲方事前书面许乙方述设计成果做复制修改转行提供做方式乙方违反条规定甲方权单方解合乙方应返甲方设计费赔偿甲方受损失
    51 Rights and Obligations of Party A
    511 Party A shall provide necessary documents and information to Party B as Party of the bases of the Project design performed by Party B and shall assume the responsibility for their integrity and exactness
    512 Party A shall pay Party B for the Project design in accordance with the Agreement If material modification is made by Party B according to the order of Party A which causes additional expense Party A shall pay Party B the additional incurred fees The amount of such additional fees shall be negotiated in good faith by both Parties
    513 Party A shall check and accept the design documents in writing in time after receipt And Party A shall indicate its revise comments and time requirement
    514 Party A assigns wayne as its Principal of the Project and Party B assigns Karl Princic as its Principal of the project may not change its Principal or main architect without 7day prior written notification to and written approval of Party A
    515 Party A will arrange for communication between each design firm of the Parties and apply for the commissioning of the Project
    516 If the parent company of Party A refuses to approve the design or the Project is suspended Party A shall pay Party B based on the amount of the design work performed by Party B and delivered to Party A in accordance with the relevant articles of this Agreement
    517 If the schedule of the Project is delayed because of Party A the design work delivery date shall be postponed accordingly






    52 乙方权利义务
    521 乙方必须遵中国东莞市颁布关规范规定合约定容进行设计应设计服甲方项目景观设计总体构思设计程中必须加强甲方沟通协调乙方项目设计适性正确性济合理性负责





    522 合生效起周乙方应甲方提交详细设计计划书包括设计进度设计师相关员配备情况设计员简历设计总负责办联系电话等报甲方备案乙方必须项目设计配备验丰富富创新精神设计师承担设计工作工程结束前乙方应保证该项目设计员稳定
    518 Any and all intellectual property rights the amplification rights of such intellectual proprietary rights and their derivatives created by a Party or both Parties in relation to design and use of the design work shall be the sole and exclusive property of Party A Party B can publish or apply for awards as author in the study and research fields with prior approval of Party A With the agreement of Party B Party A has the right to use allow others to use modify or allow others to modify or transfer Party B’s design work to any third Party Party B shall not copy modify transfer use or provide the design work provided to Party A to any third Party to use in any way without prior written approval of Party A If Party B breaches this article Party A has the right to terminate the Agreement Upon termination of the Agreement Party B shall return all the fees paid by Party A and reimburse any and all costs and losses caused
    52 Rights and Obligations of Party B
    521 Party B shall perform the design in accordance with this Agreement and relevant rules and regulations in DongGuang City and assume responsibility for the feasibility exactness and rationality of the economy of the design works Party B shall use its best effort to make the design work in accordance with Party A’s general landscape concept To ensure accordance with the specifications Party B shall make sufficient communication with Party A
    522 Within one week of executing this Agreement Party B shall deliver to Party A the detailed plan of design services including not limited to schedule list of principals of the Project main architects architects and other necessary persons involved resumes of those persons and contact telephone numbers Party B shall assign professional and experienced persons with highly creativity to perform the design and shall not change them during performance of the Agreement



    523 设计程中乙方责应甲方求设计图纸进度情况作阐释交流参甲方组织景观方案汇报施工图纸会审确保终设计效果定期配合甲方确定关景观效果材料


    524 设计程中需设计资料需甲方配合事项应时通知甲方甲方销售企划等部门外宣传需设计作诠释邀请乙方参讨时乙方协助义务

    525 设计程中阶段性设计重问题乙方均应先送甲方审核方进行步设计类问题指涉总体布局重景观素确认调整涉工程量投资变化较调整等问题




    526 乙方设计文件出现遗漏错误应条件修改补充乙方原造成设计返工造成费乙方理乙方原设计进度拖延设计错误甲方蒙受济时间质量损失乙方应予甲方赔偿损失赔偿甲方乙方支付中扣留

    523 Party B shall communicate with Party A regarding Party A’s schedule requirements attend landscape scheme conferences or meetings review the construction drawings to insure the consistency of the final design work and periodically assist Party A in selecting main landscape decorations materials
    524 Party B shall notify Party A in a timely fashion for any and all necessary assistance needed from Party A Party B shall assist Party A by explaining the design work upon the request of or as required by Party A
    525 Without prior written approval of Party A Party B shall not start any additional design work phases including but not limited to confirmation or modification of the Project’s general layout or main landscape elements or material adjustment on the amount of the construction or investment Minor changes or problems with completed design work shall not preclude beginning a new or additional design phase
    526 Party B shall correct and amend any and all errors or omissions of the design work at its own expense If Party B redoes the design work because of its own error or omission all additional fees incurred shall be assumed by Party B All costs and losses caused by delivery delay or errors or omissions in the design work shall be reimbursed by Party B or may be deducted from any payments due and payable to Party B


    527 成控制
    乙方应做设计方案济合理甲方认乙方设计程中存济性方面问题乙方应景观方案做出修改

    528 聘请顾问协助部门
    乙方必时聘请顾问进行设计指导工作费乙方决定设计费中分摊支付设计成果统乙方甲方负责未甲方书面许乙方转委托甲方工作需行聘请建议聘请专业顾问费甲方决定甲方支付




    529 乙方负责原定设计范围必修改设计包括调整设计补充设计乙方执行设 计务期间甲方较修改设计变更设计乙方行收费甲方重变更设计甲乙双方应立签订补充协议费计乙方应时安排变更设计影响工程施工进行(注:重变更设计指设计范围修改景观方案重调整造成乙方五工作日工作量)



    5210 乙方解甲方合作程中获知悉关甲方信息包括项目信息技术图纸资料营信息力资源合涉设计研究容设计研究成果等等未公开信息甲方商业秘密应严守秘密性未甲方事先书面意乙方乙方商业秘密甲方提供乙方技术资料图纸等履行合外途乙方述保密义务期限乙方知悉该资料信息日起直公众通合法途径获知悉相关资料信息日止
    527 Control of the costs
    Party B shall use its best efforts to make all design concepts or scheme of the economically rationale otherwise Party B shall modify the design at Party A’s request
    528 Appointment of counselor or request for assistance
    Party B may appoint a counselor to assist in the Project design Any reasonable fees caused by such appointment shall be paid by Party A on the condition that Party B shall remain liable for the Design according to the Agreement Without prior written approval of Party A Party B shall not assign its obligations to any third Party If Party A appoints a counselor on benefit of itself Party A shall pay for such fees
    529 Party B shall modify the design within the scope of this Agreement including but not limited to modification adjustment and amendment If the modification is minor the fees shall be included in the fees described in Article 6 if material modification is made because of Party A Party A shall pay for such services provided by Party B and both Parties shall negotiate to determine the amount of extra fees payable M Material modification means the changes in the design or adjustments of the landscaping scheme requiring Party B to spend five or more additional working days
    5210 Confidential information shall mean (a) any information including but not limited to the information of the Project drawings management information personnel research development contents and design in relation to the Agreement disclosed to or learned by Party B pursuant to this Agreement Party B acknowledges that in the course of the performance of the Agreement it may obtain confidential information from Party A Party B will at all times both during the term of this Agreement and at all times thereafter keep in confidence and trust all of the Party A’s confidential information received by it Party B will not use the confidential information other than as necessary to perform its obligations or exercise its rights under this Agreement






    5211 乙方应保证甲方提交成果(包括阶段性终性成果)乙方实现该成果必方法侵犯第三合法权益甲方乙方提交成果第三指控侵权提出异议权利张乙方应积极协助解决承担甲方造成损失时甲方权选择解合解合求乙方提交符合合求代设计成果

    5212 乙方应保证提交成果符合国家方现法律法规规章政策行业规范 求符合合目果符合述求甲方第三造成损失乙方应予赔偿
    5213甲方收乙方提交全部设计图纸资料发现乙方违背合规定责义务时乙方修改图纸甲方暂支付合规定应付乙方相应金额

    6:费付款设计成果交付
    61 费:
    工程费总计美元贰拾肆万伍仟元整(
    5211 Party B warrants that the design work and the methods used to fulfill the design work do not infringe any third Party intellectual property right or other rights of any third Party If such infringement occurs Party A has the right to terminate the Agreement or request Party B to make alternative design Notwithstanding the foregoing Party A has the right to request Party B to reimburse Party A any and all costs and losses caused
    5212 Party B warrants that the design works delivered by Party B do not breach any demands or targets of this Agreement relevant laws and regulations or architecture tradition If any such breach occurs Party B shall reimburse any and all costs and losses caused
    5213 If Party B refuses to correct any defect of the design works Party A has the right to suspend the relevant payment until Party B corrects the defect



    24500000)包括概念方案设计方案深化设计扩初设计施工图审核现场服务五阶段
    611 费包括项目进行期间乙方安排深圳甲方会晤查现场12次次2天费



    62 设计进度费支付方式:
    设计费引致国税项甲方承担甲方支付设计费前乙方须设计进度提交甲方设计费发票甲方收发票审核乙方交付设计成果发票资料合格误列表格支付相应设计费
    6Fees Payment and Delivery
    61 Fees
    The total fee for the Project is 25500000 which includes but is not limited to concept design design development construction documents review and constructive administration
    611 The service fee is inclusive of a maximum of twenty twoday trips to Shenzhen or DongGuang in connection with this project including airfares

    62chedule of the Design and Payment
    All taxes and duties to be paid due to this service shall be borne by Party A Party shall pay Party B for its services in accordance with the following chart after receipting of the relevant invoice and acceptance of the design work





    阶段
    Phase
    时间节点
    Time
    YMD
    阶段付款算费总计
    Fees Payment
    付款时间
    Pay Time
    1
    启动金
    Mobilization
    合签订
    Signature signed
    2500000
    (美元贰万伍仟元整)
    2500000
    合生效 25 工作日
    25 workdays after signature signed
    2
    总面景观概念方案设计完成
    Landscape Master Plan Design
    20100815
    4000000
    (美元肆万元整)
    4000000
    总面景观概念方案设计完成获甲方认 25 工作日
    25 workdays after Master Plan Design’s written notification
    3
    示范区方案深化设计完成
    Showing area Conceptual Design
    20100910
    3000000
    (美元叁万元整)
    3000000
    示范区方案深化设计完成获甲方认 25 工作日
    25 workdays after Showing area Conceptual Design’s written notification

    4
    示范区扩初设计完成
    Showing area Design Development
    20100920
    3000000
    (美元叁万元整)
    3000000
    示范区扩初设计完成获甲方认 25 工作日
    25 workdays after Showing area Design Development’s written notification
    5
    非示范区方案深化设计完成
    Nonshowing area Conceptual Design
    20101005
    4500000
    (美元肆万伍仟元整)
    4500000
    非示范区方案深化设计完成获甲方认 25 工作日
    25 workdays after NonShowing area’s Conceptual Design written notification
    6
    非示范区扩初设计完成
    Nonshowing area Design Development
    20101020
    5000000
    (美元伍万元整)
    5000000

    非示范区扩初设计完成获甲方认 25 工作日
    25 workdays after NonShowing area Design Development’s written notification
    7
    施工图审查示范区施工现场配合
    Construction Administration
    迟2013年12月
    Before 201312
    2500000
    (美元贰万伍仟元整)
    2500000
    施工完成25工作日
    25 workdays after Construction Administration’s written notification
    7:违约责
    71 甲方身原履行合应合付清已完成阶段设计务应设计费日工程度进行甲方乙方应尚未履行原合新服务范围协商新收费方式重新签订合甲方级设计文件审批合项目停缓建甲方应乙方实际完成工作量支付应付设计费
    72 乙方工作进度分阶段提交帐单发票甲方核审误合约定付款正理逾期付款达60天时乙方权暂停履行阶段工作书面通知甲方
    73 乙方身原法履行合导致甲方合规定解合者应支付合总额10违约金乙方已提交部分工作成果双方832条约定处理设计成果设计费未提交工作成果乙方应返甲方已付设计费
    7:Liability for Breach
    71 If the Agreement is terminated because of Party A Party A shall pay Party B for the work completed in accordance with the amount of the work If the Project is resumed the Parties can renegotiate the fees or sign a new Agreement If the Project is suspended or the parent company of Party A refuses to approve the Project Party A shall pay Party B for the work completed
    72 If Party A delays the payment due to its own fault more than 60 days Party B has the right to suspend design work with a written notification to Party A
    73 If Party B fails to fulfill this Agreement or this Agreement is terminated by Party A due to Party B’s default Party B shall pay Party A 10 of the total fees described in article 6 as compensation for breach of the Agreement If Party B has finished Party of the design work the Parties shall settle the payment and deal with the design work in accordance with article 832 if Party B does not start work Party B shall return to Party A all the fees paid by Party A





    74 乙方身原延误合规定设计文件交付时间超三天延误天应减收该项目相应阶段应收设计费 03‰乙方邮政造成延误负责延误超 15 天甲方权解合求乙方支付合总金额10违约金


    75 设计符合甲方求乙方应甲方合约定求限期修改修改两次符合求甲方权单方解合求乙方第73条承担违约责




    8:合生效终止结束
    81 合需甲乙双方签字盖章生效合生效日期甲乙双方中方签字(盖章)日期准

    82 乙方发生述情形甲方权终止合承担违约责时甲方权合相关规定法律规定采取相应救济措施


    821 乙方进行破产破产解程序


    822 乙方转移资产抽逃资金丧失声誉履约力情形
    823 乙方严重违反合规定义务甲方限期改正未改正者
    74 If Party B is unable to submit the design work on schedule a late fee equal to 003 percent of the fees for relevant phase of the design will incur for each day of the delay If such a delay is over 15 days Party A has the right to terminate the Agreement immediately and request Party B pay 10 percent of the total fees of the Agreement as compensation for breach of the Agreement
    75 If the design work fails to meet the requirements of Party A Party B shall revise the design work within the period allowed by Party A If Party B fails to provide satisfactory the design work after two tries attempts Party A has the right to terminate the Agreement and Party B shall assume the liability stipulated in article 73
    8:Execution and termination
    81 This Agreement will take effect upon signing of the both Parties The date of last signature shall be taken as the date of effectiveness of the Agreement
    82 Without prejudice any other applicable remedies under this Agreement and applicable laws Party A has the right to terminate this Agreement without any liability for the events as follows

    821 Party B’s becoming insolvent filing a petition for relief under any bankruptcy insolvency or similar law
    822 Party B’s displacing its assets or incapability to perform the Agreement
    823 Party B’s breach of other obligations under this Agreement and failure to cure the breach within the limited period of Party A



    824 法律法规合规定甲方解权


    83 合终止果
    831 合终止乙方应甲方指定期间返甲方商业秘密资料信息返予销毁

    832 乙方原导致合终止合终止前甲方已支付乙方相应报酬合终止影响甲方合终止前乙方提交成果享知识产权

    9:般条款
    91 履行合力:双方保证足够权力力履行合满足合中项条件兑现项求费支付
    92 完整合:合书合补充协议应视甲方乙方间完整合取代前口头书面谈判汇报协议修改必须双方书面意






    93
    824 or other conditions where Party A has the right to terminate the Agreement as stipulated in the Agreement and under applicable laws
    83 Results of Termination
    831 Upon termination of the Agreement Party B shall return or destroy all the confidential information of Party A held by Party B
    832 If the Agreement is terminated due to Party B’s default or the design work has been paid for by Party A Party A has the entire ownership and intellectual property rights of the design work submitted to Party A
    9:Miscellaneous
    91 The Parties guarantee that they have full power and authority to enter into this Agreement and to carry out their obligations under this Agreement
    92 Entire Agreement:This Agreement together with its attached exhibits is the entire understanding between the Parties on this Project design and merges all prior discussions negotiations and agreements between them whether oral or written express or implied No alterations or modifications of this Agreement shall be binding upon either Party unless made in writing and signed by an authorized representative of each
    93 The nonperformance or delay in performance by either Party of any obligation under the Agreement shall be excused if and to the extent that such nonperformance delay or responsibility is caused by an event of Force Majeure Upon the occurrence of any event of Force Majeure the Party suffering therefore shall immediately give the other Party written notice thereof including a statement describing the event of Force Majeure and its effect upon the performance of the Agreement The suffering Party can terminate the Agreement by 15day prior notification of the other Party in writing without any liability The Force Majeure includes orders of the government policy and regulations of PRC war and natural disaster (such as earthquake and flood)

    抗力导致终止合:果抗力发生行政命令政策法规战争然灾害(洪水震)超出合双方控制事件方法履行合受抗力影响方提前十五天书面通知方终止合双方互承担违约责













    94 抗力时设计费支付:抗力发生时甲方决定终止合乙方合终止日止提供切服务应报酬旦应付款已付清乙方提供甲方合终止日前完成设计文件


    95 通知:合规定外通知传真电子邮件邮局挂号快递等方式通知传真电子邮件方式发传真电字邮件日送达日通知邮局挂号快递方式寄送甲方收日送达日




    96 纠纷解决:合履行程中发生纠纷甲方乙方应协商解决协商成时中国境甲方辖权民法院提起诉讼遵守根中国法律做出裁决




    94 If Party A terminates the Agreement due to Force Majeure all work completed by Party B and delivered to Party A shall be paid for in accordance with the Agreement Upon settlement of the relevant fees Party A has the ownership and intellectual property rights of the design work

    95 Notice: Unless otherwise provided herein all notices or communications to be made and related to this Agreement must be sent by facsimile mail courier or email which takes effect when dispatched to the address listed below in this Agreement Notwithstanding the foregoing any notices or communications sent by express courier shall be effective on the date Part A’s receipt of dispatch
    96 This Agreement shall be construed and governed by the law of the People’s Republic of China Any disputes concerning the construction or interpretation of this Agreement or a Party’s performance of its obligations hereunder which are not resolved through good faith consultation between the Parties may thereafter be submitted by either Party to the nonexclusive jurisdiction of the Shenzhen District Courts
    97 Upon signature of both Parties the Parties agree to be bound by all the articles of the Agreement from the date of signature Furthermore such signature can be deemed as that each Party has the full power and authority to perform this Agreement



    97 合书双方签字表明双方指明日期意述合书条款时表明双方完全终权威代表方完全遵守合列条款



    98 合求甲方提供相关资料文件合合具等法律效力两者间符处合准



    99 合未事宜双方签订补充协议作附件补充协议合具等法律效力双方协商签订补充协议应序编号合补充协议致时应补充协议新约定执行

    910 合式四份双方持二份具相法律效力


    911 合中文版英文版致中文准



    委托方(甲方)单位名称
    深圳市万科南城房产开发限公司

    单位址
    深圳市福田区梅林路63号
    万科建筑研究中心  邮编 518049 



    98 The documents provided by Party A in accordance with the Agreement have the same effect with the Agreement In the event that there are conflicts between the Agreement and the documents above the Agreement shall prevail


    99 Should any other issues occur the two sides may enter into a supplementary agreement which shall be legally binding In the event that there is any conflict between the supplementary agreement and this Agreement the Agreement shall prevail

    910 This Agreement is made in four copies each of which is original and equally authentic Each Party will preserve two copies

    911 In the event of any difference in interpretation or understanding because of language the Chinese version of this agreement shall prevail

    Party A
    DONGGUAN VANKE WANXIN REAL ESTATE CO LTD

    Address
    Vanke Architecture Research Centre No63 Mei Lin Road Fu Tian Distrct Shenzhen China 518049


    签订合代表

    签订日期



    承接方(乙方)单位名称:
    Karl Princic DesignIntaran Design Inc
    单位址
    100X Jl Tukad Balian – Sidakarya –Denpasar – Indonesia
    签订合代表
    日期
    开户银行
    银行帐号
    Representative

    Date



    Party B
    Karl Princic DesignIntaran Design Inc

    Address
    100X Jl Tukad Balian – Sidakarya –Denpasar Indonesia
    Representative
    Date
    Bank’s name
    Account number








    设 计 务 书




    项目名称: 深圳万科第五园七期期景观设计

    设计阶段: 方案扩初施工图审核现场配合
    设计专业: 景观
    成文日期: 2010年8月10日
    项目负责

    设计部理


















    目 录
    项目基情况介绍
    二 设计范围设计容
    三 设计意设计求
    四 成控制
    五 成果求
    六 时间安排
    七 合作方式
    八 附件








    项目基情况介绍
    项目区位
























    山城高层效果图


    详见附件1附件2

    设计场范围基配置求
    A 设计场范围
    1 示范区范围

    2总区域


    详见附件3设计范围CAD示意图
    红线建筑外户外空间建筑底层架空层泛堂
    景观设计范围列表:
    编号
    区域名称


    备注
    01
    红线外市政路绿化带广场时通道

    X

    02
    设计范围硬景软景交通明排水等景观子系统设计
    √√



    03
    入口空间门围墙岗亭理口



    04
    架空层泛堂部分设计



    05
    会样板房屋顶等公部分景观花园



    06
    标识灯具雕塑家私部品设计选型
    √√


    07
    车库出入口采光井通风口美化设计



    08
    典型住户私家花园

    X

    09
    区车行干道(沥青混凝土)

    X

    10
    建筑避难层

    X

    备注:
    1架空层包括吊顶天花柱面墙面装饰面铺装水景绿化配置家私部品灯光配置等
    2标识灯具项目特色结合项目销售包装求进行设计雕塑家私部品花钵等需提供风格相应图片整体景观设计统协调需标注面位置
    3红线外区域实际需核算相关面积单独计算设计费
    B 基配置求
    1高层会区
    景观容
    数量
    面积
    长度
    造价估算(万元)
    面积 指标
    备注
    游泳池

    6001000米



    童游乐场





    老年活动区





    羽毛球场





    网球场





    篮球场











    注:高层区泳池活动场考虑防止高空抛物措施


    2运动公园区
    2灯光网球场7制灯光足球场需带35排 观赛台塑胶跑道亲水台码头行车租赁点饮料体育品售卖店童天极限运动场)

    二 设计意设计求
    概念设计阶段

    总体设计求
    分项
    详细容


    备注
    风格定位
    延续五园原现代中式设计风格结合新建筑规划单体设计形成新设计特点营造高尚住宅区风格



    题意
    题:现代中式 简约高尚



    空间形态
    运适设计手法组织空间表现设计题




    分项设计求
    场分析
    周围环境
    城市住区(周边城市界面城市延展界面等)


    备注
    然环境资源(形高程坡度坡汇水防洪等)



    场条件
    根场分析出项目利利素注意该项目7期8期原山原生树木保护



    设计输入条件
    展示范围
    展示区范围销售流线



    建筑规划
    交通流线(动态静态交通)



    消防通道(登高面通道回车场)



    室(边界线采光井通风口车辆出入口防口)



    竖高差



    顶板覆土(深度荷载)



    理模式
    出入口分布尺度物业理方式



    设计构思
    面布局
    深化前题风格求明确相关功配置



    设计意境
    注重领域感仪式感风情感序列感标示性等氛围营造



    空间节奏
    注意空间节奏控制握





    方案阶段设计求(针展示区)
    总体设计求
    名称
    详细容


    备注
    效果
    保持原概念设计意致性发生偏离




    概念阶段设计输入条件次确认



    展示区
    展示区非展示区边界明确




    展示区流线组织景观空间




    城市界面注重标识性




    区入口注重仪式感





    泳池会区域注重趣味性风情感




    架空层花园注重装饰感色彩搭配



    产品类型
    根高层墅商业会等产品类型设计相应景观配置合适功




    软景硬景面积间例超7:3




    展示区非展示区例控制1:2宜




    水景面积控制5宜分散




    E.分项设计求

    注释


    备注
    安全·防护
    设计关注安全强条(特台阶挡墙台栏杆防护水体深度问题)



    高层注意防高空抛物4米活动场



    交通·消防
    考虑车分流设计车混行时顾行安全



    消防通道宽4米



    登高作业面宽6米距离建筑边缘5~11米总宽度11~17米



    登高面四分建筑周长建筑长边



    端设置18×18米回车场



    消防通道乔木构筑物建筑登高面种植高度4米树木



    步行道路量消防通道基层消防通道量软化处理直接出现46米宽硬化路面



    出景观效果考虑景观设计单位建筑设计消防流线提出修改意见



    竖·排水
    竖设计塑造景观空间重容



    通常室外台阶少2步超6步台阶需设计扶手



    场竖形排水应统设计避免出现积水带



    坡山项目应做专项场设计



    库·顶板
    室顶板覆土景观影响应结合荷载求进行景观设计





    室方设计泳池水景建构筑物注意室柱网相结合需建筑结构专业复核



    设备房放室建筑结构专业时沟通



    树种植部位量柱梁方



    景观方案定室边界出入口采光井通风口等位置明确限制条件展开设计



    构筑物广场水景避免横跨室边界



    物模式
    需明确理口数量尺度交通组织



    明确分级理口理方式(否值守否需设置防尾系统)



    根物求决定否需设置区组团围墙



    岗亭保安门禁刷卡机围墙等素整合设计中
    架空层
    架空层需研究清楚建筑结构线设计条件尤注意天花线遮挡美化



    天花墙面面统设计注重材质统



    需注意架空层堂外立面墙面天花交接处构造处理材料渡



    软装设计应注重整体感风情感色彩搭配



    综合线
    减少弱化化粪池变电箱井电缆沟景观造成影响尤避免狭窄绿化空间中出现线集中布置



    绿化种植
    详见绿化设计指导书


    附件形式
    泳池水景
    泳池水景通常景观核心区域景观设计重点应突出趣味性风情感



    整泳池区域实行封闭式理应设置理口更衣室(构筑物形式出现)强制淋浴洗脚池进入泳池区



    童泳池成泳池应安全隔离设计独立设置



    成泳池童泳池水系统分开





    童泳池水深600㎜成泳池水深1400㎜



    泳池面积控制600㎡1000㎡间





    三 成控制
    1说明: 1单位方米景观工程造价 600 元

    四 成果求
    51 景观概念阶段成果
    u 前期分析图
    u 构思分析图
    u 彩色总面图(1:800)
    u 景观分析图
    u 典型剖面分析
    u 意图片
    52 景观方案阶段成果(展示区+非展示区)
    u 彩色总面图(1:500)
    u 景观设计说明
    u 景观分析图(a交通分析b消防分析c功分析d结构分析f场分析g视线分析等)
    u 效果图景观意图片(效果图位置需甲方确认)
    u 重点区域放面样简图
    u 水景设计图
    u 景观亭花架景墙挡墙等建构筑物面布置设计简图
    u 乔灌木绿化设计分析图1:300 植物图谱
    u 景观明布置示意图1:300灯具选型
    u 雕塑品家私部品设计布置示意图景观软装图谱
    u 景观标识设计草图意图片
    u 展示区Sketch Up 分析模型

    53 扩初阶段成果
    硬景:
    u CAD总面图
    u CAD铺装总面图
    u CAD硬景定位竖标高图(1:300)
    u CAD明布置图(1:300)
    u CAD排水布置意图
    u CAD室外家具设施雕塑品园林构筑物标识面布置图(1:300)
    u 5场剖面图(1:200)
    u 重点区域放面图(1:100150)
    u 铺装样包含路面墙面池壁收口处理(1:201:50)
    u 细部剖立面(含意图片)细部剖立面(1:101:20)
    u 水景细部剖立面(1:50)
    u 材料清单(含片规格尺寸)
    u 景观软装图谱规格尺寸(雕塑品游乐设施花钵家私部品灯具)


    软景:
    u CAD种植面图(1:300)(重点乔木灌木表现草灌线范围)
    u 种植说明植物表(含乔木灌木)
    u 植物设计分析图(草灌线林缘线常绿落叶)
    u 微形设计分析图
    u 4套图册1张CD

    54 乙方需提供图纸数量
    541 A3景观终方案文4套
    542 A3景观终扩初文4套 (包括甲方扩初阶段求成果标准)
    543 景观全套概念方案扩初设计电子文件1套(含CAD文件相关JPG文件)

    六 时间安排
    详合中62条

    七 合作方式
    1. 第五园七期 景观设计工作乙方项目负责 Karl
    2. 工作完成点 深圳
    3. 合中包括现场配合 10 次总配合时间 20 天
    八 附件材料
    附件名称


    备注
    1项目原始场资料



    2建筑设计资料


    含初步物业理模式
    3项目景观风格定位建议书



    4初步展示区范围流线图



    5深圳万科园建战略材料清单



    6深圳万科常苗木清单



    7深圳万科战略灯具清单



    8质报告水文报告



    9 关建筑图纸(建筑sketch模型)






    文档香网(httpswwwxiangdangnet)户传

    《香当网》用户分享的内容,不代表《香当网》观点或立场,请自行判断内容的真实性和可靠性!
    该内容是文档的文本内容,更好的格式请下载文档

    下载文档到电脑,查找使用更方便

    文档的实际排版效果,会与网站的显示效果略有不同!!

    需要 2 积分 [ 获取积分 ]

    下载文档

    相关文档

    园林景观设计标准合同及任务书

     XXX景观设计合同 工程名称: 工程地点: ...

    10年前   
    23037    0

    景观设计任务书

    本期总用地面积约309亩,绿化率约55%。该地北侧规划为底层住宅,南侧以底层住宅为主,临街有部分小高层住宅产品,西侧沿大道有50米宽的景观(20米)及商业带(30米),商业规划为3层,与该地块以...

    6年前   
    1431    0

    景观设计任务书

    景观设计任务书委托设计任务书1.设计依据1.1 规划主管部门给定的规划设计条件和控制性详细规划图纸。1.2 1: 现状地形图。1.3 市政基础设施条件。1.4双方签定的设计合同内所包含的服...

    1年前   
    389    0

    景观设计任务书范本

    景观设计任务书范本 景观设计任务书发布日期:____年____月____日目录1. 项目概况 42. 设计依据 43. 设计要求 53.1....

    1年前   
    632    0

    景观设计合同

    为了配合 项目景观亮化设计的建设,甲方委托乙方承担该项目景观亮化工程方案设计工作。根据《中华人民共和国合同法》《中华人民共和国建筑法》《建设工程勘察设计市场管理规定》等国家有关...

    3年前   
    766    0

    景观设计合同标准版

    项目景观设计合同 项 目 名 称 : 项目建设地点 : 委托方(甲方):合 同 编 号 :合 同 条 款 目 录第1条 项目基本情况第2条 合同依据第3条 设计范围及内容第4条 工作阶段及成果...

    9年前   
    581    0

    景观设计合同范本

     景 观 设 计 合 同 工程名称: 工程地点: 甲 方: ...

    8年前   
    6337    0

    景观设计合同模板

     合同编号: 景观方案设计合同 项目建设地点: 委托方(甲方): 承接方(乙方): 签订日期...

    10年前   
    6285    0

    园林景观设计合同 (2)

     园林景观设计合同样本     工程名称:_______________________________ 工程地点 :______________________________...

    10年前   
    27965    0

    园林景观设计合同

    园林景观设计合同  项目名称:                           工程地点:                          合同编号:             ...

    11年前   
    11496    0

    ADSL宽带接入合同

    ADSL宽带接入合同  甲方:_________  乙方:_________  第一条 合同标的物  甲方租用乙方adsl宽带互联网电路,租用数量为_________条,速率为________...

    10年前   
    482    0

    司机带车聘用合同

    司机聘用合同书    甲方:北京鸿怡快递服务有限公司     地址:北京市**区中关村南二街科大平房21号     乙方:__________________  性别:_______...

    9年前   
    6312    0

    带压堵漏服务合同

    带压堵漏服务合同  合同编号:______________  甲方:_____________________  联系电话:_________________  传真:____________...

    10年前   
    430    0

    设计一用于带式运输机上的传动及减速装置任务书

     《机械设计》课程设计一、 设计题目:设计一用于带式运输机上的传动及减速装置。设计使用期限8年(每年工作日300天),两班制工作,单向运转,空载起动,运输机工作平稳,大修期为3年。转速误差...

    3年前   
    557    0

    景观设计合同范本(方案-施工图)

     园林工程设计合同 ...

    10年前   
    5096    0

    景观设计合同范本 (1)

     后湖三万英尺项目景观方案及施工图设计合同 项目名称:后湖三万英尺项目 项目建设地点...

    11年前   
    15622    0

    幼儿园带教心得

    LOGO幼儿园带教心得 幼儿园带教心得(1)时光飞逝,短短的两周一眨眼就从我的指缝间溜走,为期两周的跟班培训也将画上句号。但庆幸的是时光老人走过还是给我留下了礼物,让我觉得弥足珍贵。回想当时...

    3年前   
    511    0

    幼儿园带教工作总结

    带教小结xxx是一位认真,用心的老师。在带教工作中,我发现她非常的好学和谦虚。 在带教过程中我必须为她树立一个榜样,我从自身做起,关爱每个孩子,耐心为每位家长服务当她有不足的时候,及时的提出。...

    4年前   
    541    0

    2019届高三英语第五次测评试卷带解析

    2019届高三英语第五次测评试卷带解析 本试题卷共8页。全卷满分120分。考试用时100分钟。 ★祝考试顺利★ 注意事项: 1、答题前,先将自己的姓名、准考证号填写在试题卷和答题卡上,...

    5年前   
    2668    0

    景观设计毕业留言

    景观设计毕业留言  人生不是止水,总会出现许多出乎意料之事。泰山崩于前而色不变,风波骤起而泰然处之,就显得很重要。转危为安往往需要高超的心智,也需要好的心态。多思索少激动,多仁爱少仇恨,人生才...

    12年前   
    635    0